The project involves replacing approximately 1,770 feet of aging waterline that runs from Thompson Spring to the Summit View Campground within the Montpelier Ranger District of the Caribou-Targhee National Forest in Bear Lake County, Idaho. The new system will consist of a minimum 2-inch diameter HDPE waterline with associated components including pipe bedding, utility locating, an air release valve, drains, a backflow preventer, and heat fusion joints, with all work required to adhere to attached specifications. Trenching and installation of incidental materials are included, and quantities are detailed in the Schedule of Items. The contract is issued as a Firm Fixed Price with an anticipated award date of August 5, 2026, and a price range between $40,000 and $60,000. The site is accessible via State Highway 30 and Georgetown Canyon Road, located about 20 miles north of Montpelier. All questions must be directed to the Contracting Officer’s Representative, Mary Jenkins. The solicitation number is 1240LT26Q0136, with a posted date of July 20, 2026, and quotes due by July 30, 2026. While the place of performance lists Thompson, Utah, and the agency is cited as White River National Forest, the actual work is taking place in Idaho under the Caribou-Targhee National Forest.
General Info
Agency
NAICS
Place of Performance
Thompson, UT, 84540, USASet-Aside
Documents
(7)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Summit View Water System Replacement
Montpelier Ranger District of the Caribou-Targhee National Forest
Bear Lake County, Idaho
- Posting: 7/20/2026
- Site Visit: Contact COR for Access
- Q&A Due Date: 07/27/2026
- Quotes Due Date: 07/30/2026
- Anticipated Award Date: 08/05/2026
This project includes the replacement of waterline originating at Thompson Spring and servicing the Summit View Campground to be preformed IAW documentation and specifications attached.
The work includes removing and replacing approximately 1770 feet of waterline, from the sheep trough T to the iodinator. Replacement includes 2” minimum diameter HDPE waterline, pipe zone bedding, utility locating system, an air release valve, drains, and backflow preventer, along with incidentals like heat fusion joints and trenching.
Quantities associated with these options are identified in the Schedule of Items.
The project is located on the Montpelier Ranger District of the Caribou-Targhee National Forest, Bear Lake County, Idaho, in Section 15, T 10 S, R 44 E. It is located approximately 20 miles North of Montpelier, Idaho. The project may be accessed from State Highway 30 and Left-Hand Georgetown Canyon Road (42.5528° N, 111.2957° W).
Firm Fixed Price Contract
Price Range $40,000.00k - $60,000.00
Questions should be directed to the COR:
Mary Jenkins