Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Sumner Place Residential Development

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sumner Place Residential Development is a for-sale multi-family townhome project in Eastvale, California, proposing 159 units across approximately 7.54 net acres, yielding a net density of 21.1 dwelling units per acre. The development requires several entitlements including a General Plan Amendment to reclassify the land from Commercial Retail to Multi-Family-Low-Moderate zoning, a zoning change from Heavy Agriculture (A-2-5) to General Residential (R-3), approval through Major Development Review, and submission of Tentative Tract Map 38032 for condominium conversion. Site improvements encompass ornamental landscaping, drive aisles, pedestrian walkways, and trash enclosures, while off-site enhancements to Schleisman Road, Sumner Avenue, and Orange Street are necessary to accommodate new gated entrances. The project’s performance period spans from March 2026 through March 2028, with distinct phases including demolition, site preparation, grading, trenching, building construction, architectural coating, and paving, all occurring at the designated property located at 7080 Sumner Avenue with APN 152-040-001. Environmental compliance is governed by CEQA and Co-Permittee requirements, with key deliverables including Drainage Management Area classifications, Design Capture Volume calculations, and stormwater management plans aligned with the WQMP Guidance Document and TR-55 standards. Earthwork and grading must meet ASTM D1557-91 compaction standards, with fill material limited to less than 5% organic matter and lift thicknesses capped at eight inches, all subject to acceptance by the Geotechnical Consultant. Special conditions exclude assessments for asbestos, radon, methane, radionuclides, earthquakes, floods, and endangered species, and prohibit PCB testing or analysis of air, water, and building materials. The environmental assessment report is restricted to use by SC Sumner, LLC and Southwood LTD and is valid for 180 days from site reconnaissance. No contract value, pricing structure, procurement evaluation factors, FAR clauses, or federal acquisition terms are specified, and no payment, invoicing, or contracting officer details are provided. All administrative and technical coordination is managed through the City of Eastvale, with primary contacts in planning and environmental review roles.

General Info

159-townhome project in Eastvale, CA, requires zoning changes, stormwater compliance, and site improvements from 2026 to 2028.

Agency

California → City of Eastvale

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Sumner Avenue, Orange Street, Schleisman Road, Eastvale, CA, 92880

Set-Aside

NONE

Documents

(20)

Appendix C-2 - Cultural Resources Assessment

PDFother

Historic Resources Evaluation for 7078 and 7080 Sumner Avenue

PDFhistoric-resources-evaluation

Appendix A - AQ & GHG Assessment for Sumner Place Project

PDFtechnical-memorandum

Appendix H - Noise and Vibration Analysis for Sumner Place Project

PDFnoise-and-vibration-analysis

Geotechnical Update Review for Sumner Place Residential Development

PDFgeotechnical-report

Sumner Place Residential Development Notice of Completion

PDFnotice-of-completion

Appendix K - Tribal Consultation Record

PDFother

Habitat Assessment & MSHCP Consistency Analysis for Sumner Place Project

PDFhabitat-assessment

Sumner Place Residential Development NOI PLN25-20005

PDFnotice-of-intent

Appendix D - Energy Analysis for Sumner Place Project

PDFenergy-analysis

Appendix J-2 - Sumner Place VMT Screening Evaluation

PDFtechnical-memorandum

CNUSD Will-Serve Letter for Sumner Place Development

PDFwill-serve-letter

Mitigation Monitoring and Reporting Program for Sumner Place Residential Development Project

PDFmitigation-monitoring-reporting-program

Appendix J-1 - Focused Traffic Assessment for Sumner Place

PDFtechnical-memorandum

Sumner Place Apartment Homes Preliminary Water Quality Management Plan

PDFwqmp

Appendix J-3 - Sumner Place Queuing Evaluation

PDFtechnical-memorandum

Appendix F - Phase I-II Environmental Site Assessment for Sumner Residential Development

PDFenvironmental-site-assessment

SCH Summary Form for Summer Place Residential Development

PDFenvironmental-summary

Preliminary Hydrology Study for Tentative Tract Map No. 38031 - 7080 Sumner Avenue

PDFpreliminary-hydrology-study

Summer Place Residential Development Initial Study/Mitigated Negative Declaration PLN25-20005

PDFenvironmental-assessment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Eastvale
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Eastvale
Office AddressN/A
Contacts
Dionisios GlentisSenior Environmental Planner
Brandon RothProject Manager

Interested Companies (1)

Show more
LSA Associates
Irvine, CA

Full Description

Show more
The proposed project includes the development of a 159-unit multi-family attached townhome community on approximately 7.54 net acres (9.25 gross acres). As such, the net residential density would be approximately 21.1 dwelling units per acre (du/ac), while the gross density would be approximately 15.9 du/ac. Site improvements include ornamental landscaping, drive aisles, pedestrian walkways, and trash enclosures. The proposed project also includes off-site roadway/intersection improvements to Schleisman Road, Sumner Avenue, and Orange Street to ensure access to the proposed gated community entrances along Sumner Avenue and Orange Street. The proposed project includes the following entitlements: 1. General Plan Amendment from Commercial Retail to Multi-Family-Low-Moderate (20.1-40 du/acre); 2. Change of Zone from Heavy Agriculture (A-2-5) to General Residential (R-3); 3. Major Development Review for the development of a for-sale 159-unit town home residential development; and 4. Tentative Tract Map 38032 for condominium purposes.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Environmental & Archaeological AssessmentThe contract encompasses a comprehensive environmental and archaeological assessment to support permitting under the National Environmental Policy Act and Section 106 of the National Historic Preservation Act. It requires the performance of a Phase I Environmental Site Assessment to identify potential contamination, a wetland delineation to determine the extent and boundaries of wetland areas, and archaeological surveys to evaluate the presence of culturally significant resources. These activities are essential for documenting environmental and historical conditions prior to any proposed development or infrastructure projects in Dawson County, Georgia. The work must be conducted in accordance with federal regulatory standards to ensure compliance and facilitate the permitting process. This is a subcontract opportunity posted by the Development Authority of Dawson County, with a response deadline of September 7, 2026. The North American Industry Classification System code 541620 indicates the work falls under environmental consulting services. The performance location is within Georgia, though specific site details are not provided. Interested parties must submit proposals by the stated deadline to be considered, and all activities are intended to support regulatory compliance and due diligence for future development initiatives in the region.
Development Authority of Dawson County

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Environmental Compliance and MonitoringThe contract involves comprehensive environmental compliance and monitoring services focused on stormwater management, erosion control oversight, and regulatory reporting throughout the construction phase. The work is tied to a project under the Haralson County School District in Georgia and requires adherence to established environmental regulations, ensuring that construction activities do not negatively impact surrounding ecosystems or water resources. The contractor will be responsible for implementing and maintaining effective erosion and sediment control measures, conducting regular site inspections, documenting compliance efforts, and submitting required reports to regulatory authorities as needed. This subcontract is categorized under NAICS code 541620, which corresponds to environmental consulting services, indicating a professional scope centered on technical environmental management rather than physical construction. The solicitation was posted on August 7, 2026, with a response deadline set for September 9, 2026, providing interested parties a limited window to submit proposals. Performance is expected to occur in Georgia under the jurisdiction of the Haralson County School District, though specific site locations are not detailed in the provided data. The contract emphasizes continuous regulatory alignment and accurate documentation, making it critical that the selected vendor has demonstrated expertise in environmental monitoring and compliance reporting within construction environments.
Haralson County School District

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
PACP and MACP Pipeline Condition AssessmentThis contract requires the standardized coding and reporting of pipeline and manhole defects in accordance with NASSCO’s Pipeline Assessment Certification Program (PACP) and Manhole Assessment Certification Program (MACP) protocols. All condition assessments must follow these industry-recognized guidelines to ensure accurate, consistent, and defensible data collection for infrastructure evaluation and maintenance planning. The work is part of a larger infrastructure project under SAK Construction, LLC, and performance is expected to adhere to strict quality control measures aligned with national best practices for utility asset management. The solicitation is designated as a subcontract under the Small Business Administration’s set-aside programs, with eligibility limited to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, Alaskan Native Corporations, Indian Tribes, and Disadvantaged Business Enterprises certified under the Department of Transportation’s DBE program. The NAICS code 541620 categorizes this as an engineering services contract, confirming the technical nature of the condition assessment work. The response deadline is September 10, 2026, and the performance location is tied to the SARP10 Humphreys Blvd CIPP project in Memphis, Tennessee, though specific site details are not fully defined in the provided data.
SAK Construction, LLC

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Quality Assurance and Compliance Testing (Environmental/Chemical)The contract requires third-party testing and verification of brine salt to ensure full compliance with TxDOT CAT 8C-B specifications, focusing on critical parameters such as concentration, purity, and corrosion characteristics. This work is essential for confirming that the brine salt meets the stringent environmental and chemical standards mandated by the Texas Department of Transportation for use in transportation infrastructure applications. The testing must be conducted by qualified external laboratories with proven expertise in chemical analysis and environmental compliance to guarantee accurate, reproducible results aligned with state requirements. The solicitation is classified as a subcontract under NAICS code 541620, indicating it involves scientific and technical testing services. It is posted under the Texas SmartBuy portal with a response deadline of September 1, 2026, allowing potential bidders sufficient time to prepare detailed proposals demonstrating their technical capability, equipment certification, and experience with similar transportation-related materials testing. The place of performance and point of contact details are unspecified, but all work must align with Texas Department of Transportation's operational and regulatory expectations, ensuring the brine salt used in state projects remains safe, effective, and environmentally compliant.
Texas Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541620
New
SLED
Erosion Control and Stormwater ManagementThe contract pertains to erosion control and stormwater management activities required during and after construction projects under the jurisdiction of the Texas Department of Transportation. It encompasses the installation and maintenance of best management practices such as silt fences, sediment basins, inlet protection structures, and related measures designed to prevent sediment runoff and protect water quality. The work must be performed in accordance with state and federal environmental regulations to mitigate the impact of construction on surrounding ecosystems and waterways. All activities are to be completed within the designated project areas, with strict adherence to timelines and performance standards. The contract is classified as a subcontract and is open for bids with a response deadline of September 2, 2026. It falls under the NAICS code 541620, indicating it involves environmental consulting and related services. The solicitation was posted on August 7, 2026, and is accessible through the Texas SmartBuy portal. While specific performance locations and contact details are not provided, the work is expected to occur across various Texas transportation construction sites. Contractors must demonstrate experience in implementing erosion and sediment control systems and be prepared to provide documentation and inspections to verify compliance with established environmental protocols.
Texas Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 25 days
View Details