Sun City Palm Desert Water Main Replacement Phase 2B Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Coachella Valley Water District

Place of Performance

Palm Desert, CA, 92211

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Coachella Valley Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Coachella Valley Water District
Office AddressN/A
Contacts
Jesse AguilarEngineer II

Full Description

Show more
The Coachella Valley Water District's (CVWD) Sun City Palm Desert Water Main Replacement Phase 2B Project (Project) will replace approximately 23,000 Linear Feet (LF) of ductile Iron Pipe (DIP) in the Sun City Palm Desert community. The community's water system was constructed between 1992 and 2003 and has experienced numerous domestic water main leaks during the past decade, caused by the area's corrosive soils damaging existing DIP water mains. These leaks result in a lack of water service to customers during repairs, disruption to the community, unexpected expenses, and additional staff time to address the impacts resulting from the pipe failures. A pipeline corrosion evaluation, conducted in 2016, concluded that the existing DIP is subject to additional leaks and failure due to severe external corrosion, and all domestic water pipes in the Sun City Palm Desert community should be replaced with new pipes. The Phase 2B project will replace approximately 23,000 LF affecting roughly 523 homes. The Project is anticipated to begin in or around January 2026 and last approximately 500 calendar days. Excavation of 4 feet will be necessary to install new DIP water lines within the community right-of-way. When the Project is completed, the old pipeline will be decommissioned and remain abandoned in place. Project construction will not disrupt service to the existing community water customers. The surrounding land uses consist of residential, open space and roadways. The project is not located within or adjacent to a conservation area associated with the Coachella Valley Multiple Species Habitat Conservation Plan (CVMSHCP). The sites are not subject to the CVMSHCP development mitigation fee because they were previously developed.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include the installation of new gravity sewers, manholes, stormwater facilities, and site restoration. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and compliance with M/WBE requirements, including the submission of Good Faith Efforts forms. Bidders must adhere to strict technical standards, such as AWWA Specification C-600 for pipelines and NEMA standards for motors. Contract administration is managed by Willis Engineers on behalf of the City of Belmont, utilizing EJCDC standard forms for agreements and payment applications. Required security includes performance and payment bonds, and insurance providers must typically maintain an A.M. Best rating of A-VII or better.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 1 day
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS