Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 13, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sunland Boulevard (9474) Slope Mitigation

Closed
214763State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This project involves mitigating erosion hazards along Sunland Boulevard, which is characterized by a steep slope prone to soil and debris slides that threaten the roadway. The scope includes removing accumulated slough material at the slope's toe, constructing a 210-foot debris barrier wall composed of K-rail with a vinyl green chain-link fence on top, and hydroseeding the adjacent slope surface up to the property line to prevent further erosion. Only five prequalified contractors—Calex Engineering, Clarke Contracting, Jilk Heavy Construction, Mike Prlich & Sons, and Mladen Buntich Construction—are eligible to bid as the Prime Contractor. The bid package, which contains the full scope and details, is available exclusively on RAMP for qualified bidders, with the deadline for responses set for June 5, 2024. The project is overseen by the Los Angeles Public Works Engineering Bureau, with a contract size estimated between $500,000 and $1,500,000, and is located in California. The primary point of contact for inquiries is Rene Ramirez.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles Public Works, Engineering Bureau
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
■ Only the following five Contractors can bid on this project as a Prime Contractor: • Calex Engineering • Clarke Contracting • Jilk Heavy Construction, Inc. • Mike Prlich & Sons, Inc. • Mladen Buntich Construction Company ▬ Sunland Boulevard is bordered by a steep ascending slope that is prone to erosion, leading to soil & debris falling onto the roadway. • Construct a new debris barrier wall to protect public ROW from loose debris & slough material that continuously slides onto it: •• Remove accumulated slough material at toe of slope. •• Construct the 210 LF debris barrier wall consisting of K-rail with vinyl green chain-link fence on top. •• Hydroseed adjacent slope surface up to the property line for erosion control. ▬▬▬▬▬ ♦ See bid package for full scope & details ♦ Bid package only on RAMP- if you're one of the prequalified contractors, download it to be a planholder ♦ For Bid Results visit http://engineering.lacity.gov/contractors/

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS