Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sunset Island Restoration Project - Design and Permitting

Closed
PD 23-24.110State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Sunset Island Restoration Project aims to create an alternative dredged material disposal site for the Army Corps of Engineers during dredging operations along the Gulf Intracoastal Waterway west of the Theo Baars Bridge. Currently, the existing permitted disposal site is located along residential shoreline properties, which is less than ideal. The project involves constructing a series of islands on Sunset Island by utilizing dredged material, thereby connecting and expanding existing remnant islands south of the ICW to enhance recreational opportunities and establish a protected habitat for bird species. To mitigate erosion and wave action, a segmented rock offshore breakwater or similar structure will be built along the northern side of the islands. The project also includes filling deeper submerged areas with dredged material to elevate the seabed to support aquatic and marsh vegetation, alongside developing an educational snorkeling trail to promote human engagement. The dredged material stockpiled on these islands could also serve future beach nourishment or shoreline stabilization efforts. The design and permitting phases are intended to prepare the site for future dredging activities by the Corps of Engineers, with the overall contract valued between five and fifteen million dollars, and a response deadline of September 13, 2024.

General Info

Documents

2

PD 23-24.110 Sunset Island Restoration Project - Design and Permitting

PDF, High priority: read this firstrfp
High

Sunset Island Restoration - Conceptual Design (Rock Breakwater)

PPTX, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Escambia Purchasing
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → Escambia Purchasing
Office AddressN/A

Full Description

Show more
The Sunset Island Restoration Project will provide an alternate dredged material disposal site for the Army Corps of Engineers when they dredge the Gulf ICW west of the Theo Baars Bridge.  The current permitted dredged material site is along the shoreline of residential properties on the south side of the ICW and is not ideal.  The beneficial use of dredged material on Sunset Island will connect and expand the existing remnant islands on the south side of the ICW (south of the Galvez Boat Ramp) to provide a larger recreational human use area and a designated protected bird habitat area.  A segmented rock offshore breakwater, or similar structure, will be constructed along the northern side of the islands (between the islands and the ICW) to reduce wave energy and erosion of the islands.  Deeper submerged areas on the south side of the islands will be filled with dredged material, when the Corps dredges the ICW again, to bring the submerged elevations up to the photic zone to support submerged aquatic vegetation and emergent marsh vegetation.  An educational underwater snorkeling trail will be established to enhance human use of the area.  The stockpiled dredged material on the newly created islands could be beneficially used for future beach nourishment projects or living shoreline projects. The design and permitting for this proposed project will prepare the site for the next scheduled dredging of the ICW by the Corps of Engineers.     

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS