Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Sunset Weir and Pumps Fish Passage Geotechnical Investigations (Streambed Alteration Agreement EPIMS Notification No. SUT-58514-R2)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has authorized geotechnical investigations for the Sunset Weir and Pumps Fish Passage Project under Streambed Alteration Agreement EPIMS Notification No. SUT-58514-R2, issued to the Sutter Extension Water District pursuant to Section 1602 of the Fish and Game Code. The work involves two mud-rotary borings conducted over water at Paseo Road in Live Oak, California, to collect subsurface soil samples and Standard Penetration Test (SPT) data to inform the design of new pump station and intake structures following the planned removal of Sunset Weir. The borings will utilize casing advancers to stabilize boreholes below the water table and comply with ASTM D1586 for SPT sampling, using a 140-pound hammer to drive a split-spoon sampler 18 inches into the soil, with energy efficiency monitored to ensure data reliability. The project is exempt from CEQA review under Class 6 for information collection activities and is scoped to support hydraulic modeling and foundation design without altering the surrounding aquatic environment beyond what is necessary for data acquisition. No formal procurement contract or financial value is established, as this is a regulatory notification rather than a competitive procurement, and all work is conducted by the project applicant under oversight from CDFW. The effort is administratively managed by CDFW’s Region 2 – Northern Central office in Rancho Cordova, with Elaine Jeu designated as the primary point of contact for environmental compliance, while Lynn Phillips serves as the applicant’s representative. Although no contract clauses, payment details, delivery schedules, or evaluation criteria are specified, the activity is strictly limited to field investigations and sample collection consistent with state environmental and geotechnical standards. No packaging, labeling, shipping, or security requirements are imposed, and no socioeconomic certifications, UEI numbers, or contractual representations are required. The work location is clearly defined as Live Oak, CA 95953, with all technical outputs expected to be delivered at the site under government observation. The project does not involve competitive bidding, nor does it include option periods, key personnel designations, or special clauses beyond compliance with ASTM D1586 and Fish and Game Code Section 1602, reflecting its nature as a regulatory permit for non-disruptive data gathering in support of future infrastructure modifications.

General Info

Geotechnical borings for fish passage project, compliant with ASTM D1586 and Fish and Game Code Section 1602, in Live Oak, CA.

Agency

California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova

NAICS

541360 - Geophysical Surveying and Mapping ServicesView NAICS

Place of Performance

Live Oak, CA, 95953

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Sunset Weir and Pumps Fish Passage Geotechnical Investigations SUT-58514-R2

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 2 - Northern Central, Rancho Cordova
Office AddressN/A
Contacts
Elaine JeuSenior Environmental Scientist (Specialist)

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number SUT-58514-R2, pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Sutter Extension Water District. The geotechnical investigations are being conducted in support of the Sunset Weir and Pumps Fish Passage Project. Removal of Sunset Weir is expected to have impacts on the hydraulic conditions upstream and downstream of the weir. As a result, the Sunset Weir and Pumps Fish Passage Project also will involve the design of a new pump station and new intake structures. This over water drilling program will collect information needed to provide geotechnical data to support design recommendations for the new intake structures. The work would consist of two mud-rotary borings that will be used to collect geotechnical samples of the riverbank and foundation materials. As identified in ASTM D1586, research has shown open hole mud rotary drilling to be the most reliable method for obtaining high quality samples and geotechnical data for most materials below the water table. To protect the side walls of the boring from potential erosion or caving, casing advancers will be used to install casing as the boring is advanced. The use of mud rotary is also proposed to facilitate collection of high quality Standard Penetration Test (SPT) blow counts. SPT sampling will occur in the mud-rotary boreholes as the boreholes are advanced. The sampling will be performed in accordance with ASTM D1586 Standard Test Method of Standard Penetration Test and Split-Barrel Sampling of Soils. The SPT samples will be driven with an automatic hammer that will be monitored for energy efficiency. The SPT sampling will consist of dropping a 140-pound hammer to drive a split-spoon sampler a distance of 18 inches.

Similar Contracts

Same NAICS industry code

NAICS: 541360
New
SLED
GIS Integration for Environmental Law EnforcementThis contract involves the integration of Geographic Information Systems (GIS) with Records Management System (RMS) and Computer-Aided Dispatch (CAD) technologies to enhance environmental law enforcement capabilities in Massachusetts. The project focuses on enabling advanced environmental mapping, geofencing, spatial analytics, and incident heat mapping to support the protection and monitoring of conservation and wildlife areas. These tools will improve situational awareness, resource allocation, and response efficiency for enforcement personnel operating in sensitive natural environments by translating real-time data into actionable spatial insights. The system must be designed to handle complex environmental data sets and provide accurate, timely visualizations that aid in detecting patterns of illegal activity such as poaching, unauthorized land use, or pollution events. The contract is classified as a subcontract under NAICS code 541360, which corresponds to other scientific and technical consulting services. It was posted on August 7, 2026, with a response deadline of September 4, 2026, and the place of performance is specified as Boston, Massachusetts, with a zip code of 02114. The initiative is under the jurisdiction of the Executive Office Groups, specifically the Massachusetts agency, and aims to modernize environmental enforcement operations through technologically driven spatial intelligence. While details about the point of contact or set-aside status are not provided, the focus is squarely on delivering a robust, interoperable platform that bridges data systems to improve outcomes in ecological preservation and compliance enforcement.
ENV - Executive Office Groups

POSTED

about 19 hours ago

DEADLINE

in 28 days
View Details
NAICS: 541360
New
International
Multi-year Rental of an Autonomous Underwater Vehicle (AUV)
Solicitation # RNCan-5000095073
The Department of Natural Resources Canada, through the Geological Survey of Canada – Atlantic, intends to lease a deep-water autonomous underwater vehicle (AUV) system, specifically a HUGIN 1000 or equivalent, on an annual basis for up to five years to support marine scientific research including seafloor mapping, oceanographic studies, Arctic collaborations, and activities related to the Facility for Intelligent Marine Systems. The AUV must be capable of operating at depths of at least 2,000 metres, equipped with integrated inertial navigation, Doppler velocity log, and acoustic positioning, and carry a full scientific sensor payload including multibeam echosounder, sidescan sonar, and sub-bottom profiler. The lease includes a climate-controlled 20-foot ISO container for storage and transport, technical documentation, mission planning software, and ongoing remote technical support. The supplier must maintain comprehensive insurance for the AUV and container throughout the lease and ensure system readiness at the start of each year. Université Laval, through Amundsen Science, is the pre-identified supplier, as it is the only known entity that meets all mandatory technical and operational requirements. The contract, valued at $800,000 including options, runs from award until March 31, 2027, with four possible one-year renewals. This procurement follows limited tendering procedures under multiple international trade agreements, justified by the sole-source nature of the requirement. Suppliers may submit a statement of capabilities demonstrating compliance with the specified technical criteria by August 21, 2026; if any submission meets or exceeds the requirements, a competitive process will be initiated. Ownership of any intellectual property generated under the contract will remain with the Government of Canada, reflecting the public knowledge dissemination objective. All inquiries and submissions must be directed to Alexandre Rheault of Natural Resources Canada.
Department of Natural Resources (NRCan)

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 541360
New
SLED
Village 7 Specific Plan ProjectThe proposed project seeks to amend the Village 7 and Village 5 Specific Plans in the City of Lincoln to significantly increase residential density across both areas. Within Village 7, the number of allocated residential units would rise from 570 to 1,205, while Village 5 would see an increase from seven to 30 units. A new land use designation, Village Medium-High Density Residential (VMHDR), would be introduced over 41.1 acres in Village 7, permitting residential densities between 6.0 and 18.0 dwelling units per acre to allow for flexible, higher-density development. The project also includes minor adjustments to a 49.5-acre area south of Moore Road within Village 7, which would reconfigure existing residential land uses to yield a slight net increase in total units. All changes are designed to align with the City of Lincoln General Plan and support growth consistent with regional housing goals. The amendment request is part of an ongoing planning effort to accommodate increased housing needs through strategic land use revisions. The project is being managed by the City of Lincoln, with primary contact information provided through Mikaela Noble, Associate Planner, and Phil Rodriguez, Vice President at LewisMc. The initiative is currently in the forecast stage as of August 5, 2026, with public documentation and environmental review accessible under State Clearinghouse number 2005062001. No bidding or procurement activity is indicated, as this is a land use planning amendment rather than a construction or service contract.
City of Lincoln

POSTED

3 days ago

DEADLINE

N/A
View Details
NAICS: 541360
New
SLED
Ferndale Access Project, 01-0N330The geotechnical investigation aims to support the rehabilitation or repair of Fernbridge on State Route 211 in Humboldt County by collecting critical subsurface data to inform future design alternatives. The project involves drilling seven boreholes to determine bedrock depth, soil composition, and other geologic conditions necessary for structural planning, with two of these boreholes located on the Eel River’s gravel bar outside the wetted channel. Each of the two riverbed borings is expected to reach a maximum depth of 300 feet and have a diameter of approximately 6 inches, resulting in a minimal temporary footprint of about 150 square feet per hole. The work is designed to avoid disruption to the active river channel and will focus on gathering high-resolution geotechnical data to ensure safe and sustainable bridge design. The project falls under the Ferndale Access Project and is managed by California’s Fish and Wildlife, Region 1, with primary contact Greg O’Connell, Environmental Scientist, and secondary contact Jeff Pimentel from Caltrans. The initiative was posted on August 5, 2026, as a forecast notice to prepare stakeholders for upcoming procurement. While no solicitation number or NAICS code is provided yet, the location of performance is specified as Ferndale, California, and the activity is part of broader infrastructure preservation efforts on a vital state transportation link. The data collected will directly influence engineering decisions, environmental compliance, and long-term resilience planning for Fernbridge.
Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

POSTED

3 days ago

DEADLINE

N/A
View Details
NAICS: 541360
New
SBIR / STTR
Quantum Sensor Gravity Data Production & Analysis for Maritime Floor Mapping
Solicitation # OSW26BZ05-DV023
This effort seeks to evaluate advanced quantum gradiometer technologies—specifically cold atom interferometry-based systems—for high-resolution bathymetric mapping of the ocean floor to enhance the National Geospatial-Intelligence Agency’s GEOINT foundation data capabilities. The focus is on demonstrating whether these quantum sensing approaches can generate bathymetric products that meet established NGA standards, offering a complementary data source to existing methods such as SWOT and multibeam echo sounders. Proposers must assess commercially available or research-grade quantum sensors without developing new hardware, and detail how real-world sensor data will be collected, processed, and translated into actionable bathymetric maps using simulation frameworks like path integral methods and Monte Carlo techniques. The evaluation must occur under realistic submarine platform conditions, with emphasis on achievable collection rates, spatial coverage efficiency, and the ability to fill critical gaps in global ocean floor mapping. Proposals must include a clear methodology for validating sensor outputs against existing high-quality bathymetric datasets, ensuring that the quantum-derived results are accurate, reliable, and operationally viable for defense and intelligence applications. The solicitation is open only to small businesses with fewer than 500 employees under a Total Small Business Set-Aside, reflecting a strategic push to leverage innovative private-sector capabilities. All work must be conducted within the constraints of existing sensor technologies and must not involve new sensor development. The response deadline is August 26, 2026, and the effort falls under the broader mission of the Department of Defense to modernize geospatial intelligence through cutting-edge quantum sensing, with performance expected to support future maritime domain awareness and operational planning.
Office of the Secretary of Defense

POSTED

3 days ago

DEADLINE

in 18 days
View Details