Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Supplemental Environmental Review and Subsequent Mitigated Negative Declaration for the Proposed Santa Venetia Floodwall - Supplement to the 2019 Gallinas Levee

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Marin County Flood Control and Water Conservation District Zone 7 is implementing the Santa Venetia Floodwall Project in San Rafael, California, to protect the Santa Venetia neighborhood from 100-year flood events for a 30-year design life. The project involves constructing approximately 7,800 feet of composite or steel sheet pile floodwall, with a maximum width of 14 inches, along the top of an existing earthen levee from 55 Meadow Drive to Pump Station 5. Key deliverables include the installation of above-grade steel sheet pile walls and the construction of a new concrete roadway and sidewalk featuring a passive flip-up floodgate at Meadow Drive to prevent rising floodwaters from entering the neighborhood. Construction is scheduled to begin on May 4, 2026, with an estimated duration of 90 to 120 workdays, typically concluding by October to fit within a single construction season. Work hours are established from 7 a.m. to 5 p.m., Monday through Saturday. The project is subject to strict environmental compliance, including a Supplemental Environmental Review and Mitigated Negative Declaration. Requirements include the employment of a qualified botanist and biological monitor for site inspections, adherence to a Stormwater Pollution Prevention Plan enforced by the San Francisco Regional Water Quality Control Board, and compliance with Clean Water Act Section 401 water quality standards.

General Info

Marin County will build a 7,800-foot floodwall in San Rafael for flood protection.

Agency

California → Marin County Flood Control and Water Conservation District

Place of Performance

Meadow Drive and Vendola Drive, San Rafael, CA, 94903

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Marin County Flood Control and Water Conservation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Marin County Flood Control and Water Conservation District
Office AddressN/A
Contacts
Robin BartlettPrincipal Engineer

Interested Companies (1)

Sicular Environmental ConsultingPhilo, CA

Full Description

Show more
The Marin County Flood Control District (District) is proposing to construct a sheet pile floodwall along the top of the existing earthen levee, from 55 Meadow Drive, west of the Meadow Drive Bridge, to Pump Station 5, which is just east of 825 Vendola Drive. The total length of the floodwall would be about 7,800 feet, and the maximum width would be about 14 inches. The floodwall would be constructed of composite or steel sheet piles. At the seven locations where storm drain and sewer main outfalls pass beneath or over the levee, the Project would route the pipelines through the sheet pile wall and use a clay check dam or similar materials to provide continuous flood protection. The District’s objective for the Project is to provide protection for the Santa Venetia neighborhood from the 100-year flood for the 30-year design life of the Project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Fuel Pump Renovation
Solicitation # 6581
The Town of Trumbull is soliciting sealed proposals for the Department of Public Works Fuel Pump Renovation project, identified as solicitation 6581. The scope of work requires the contractor to provide all labor, materials, and equipment for the demolition, removal, and installation of fuel pump facilities. Key deliverables include the construction of fuel islands, tank slabs, and canopies, as well as the implementation of fire suppression and electrical systems. The project must adhere to the 2024 Connecticut Sediment and Erosion Control Guidelines, Town of Trumbull noise regulations, and technical standards such as NFPA 30, 30A, and 70. Proposals are due by December 1, 2026, at 2:00 PM ET and must be submitted in a sealed envelope to the Purchasing Agent. The selection process may evaluate proposers based on their previous experience with comparable work and available financial and technical resources. Required submission documents include a completed bid form, a list of subcontractors, and evidence of similar services provided to at least four clients in the last five years. The successful contractor must provide a 10% bid security, 100% performance and payment bonds, and a Certificate of Insurance naming the Town of Trumbull and the State of Connecticut as additional insureds. Additionally, the contractor must comply with Connecticut State Prevailing Wage Rates and ensure personnel have completed the 10-hour OSHA Construction Safety and Health Course. Payment is structured via estimates with a 5% retainage, though the Town may approve payments for long-lead equipment prior to delivery.
DAS Procurement

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
International
Fort William Historical Park – Bank Stabilization Construction Services (Historic Wharf)
Solicitation # tender_22303
The Government of Ontario, through the Ministry of Tourism, Culture and Gaming, is seeking a qualified contractor for bank stabilization and erosion mitigation works at the Historic Wharf of Fort William Historical Park in Thunder Bay, Ontario. The project aims to stabilize the existing embankment, protect the boardwalk and surrounding infrastructure, and restore safe conditions. The scope of work encompasses all necessary labor, materials, and supervision for site preparation, earth excavation, installation of geotextile and gabion basket retaining systems, placement of blast rock and clear stone, temporary dewatering, erosion and sediment control, and final site restoration including topsoil and sodding. The procurement process, identified as tender 22303, utilizes a multi-stage evaluation totaling 250 points. Bidders must first pass a technical evaluation focusing on health and safety, requiring a minimum score of 60 points to proceed to the commercial evaluation. The final selection is based on the highest scoring compliant bid, with a 10 percent score increase awarded to the bidder demonstrating the highest proportion of Ontario-made goods and services. Mandatory requirements include a non-U.S. business status, a commitment that 90 percent of staff are located in Canada, and a bid deposit of at least 10 percent of the total bid price. Selected contractors must provide a detailed project plan, procurement plan, and health and safety plan, while ensuring all Ontario tax obligations are in good standing.
Tourism, Culture and Gaming

POSTED

1 day ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS