Supplemental Initial Study and Mitigated Negative Declaration - City of Brentwood - Wastewater Treatment Plant Phase II Expansion Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Brentwood is implementing the Wastewater Treatment Plant (WWTP) Phase II Expansion Project to increase treatment capacity from 5 million to 7.5 million gallons per day average dry weather flow. The project focuses on the installation of a Biosolids Drying and Pyrolysis System (BDPS) to produce biochar and Class A biosolids. While initial plans considered using an adjacent vacant parcel, the project has been refined to locate all equipment within the existing WWTP site at 2201 Elkins Way, Brentwood, California. This consolidation eliminates the need for tree removal and new fencing while reducing offsite hauling trips. The project is governed by the California Environmental Quality Act (CEQA), with a history of environmental reviews including an initial Mitigated Negative Declaration in 2016, a Supplemental MND in 2023, and a final project approval on December 9, 2025. Compliance is maintained through specific mitigation measures for noise, water quality, air quality, and biological resources. The project is managed by the City of Brentwood Public Works Department, with Casey Wichert serving as the primary point of contact. The resulting biochar will be packaged in bags for use in city parks or for offsite sale.

General Info

Brentwood expands wastewater capacity using a Biosolids Drying and Pyrolysis System at WWTP.

Agency

California → City of Brentwood

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Elkins Way and Sunset Road, Brentwood, CA, 94513

Set-Aside

NONE

Documents

(2)

Brentwood WWTP Phase II Expansion Project Addendum

PDFaddendum

Brentwood WWTP Phase II Expansion Project Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Brentwood
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Brentwood
Office AddressN/A
Contacts
Casey WichertDirector of Public Works
Michelle BrownAssociate Engineer

Interested Companies (1)

Show more
Robertson-Bryan
Rancho Cordova, CA

Full Description

Show more
The City of Brentwood (City) initiated planning for the Wastewater Treatment Plant (WWTP) Phase II Expansion Project in 2016 to expand the treatment capacity from 5 million gallons per day (MGD) average dry weather flow (ADWF) to 7.5 MGD ADWF. As originally proposed, the project included construction of a biosolids dryer building, storage silo, and stockpile area as a means of producing and storing Class A biosolids, thus facilitating additional uses and disposal methods for the biosolids. In 2016, the City prepared an Initial Study (IS) to evaluate potential environmental impacts from construction and operation of the project and adopted a Mitigated Negative Declaration (MND) on August 9, 2016. In 2023, the City modified the project to include a different technology for drying the biosolids and added a pyrolysis system, both proposed to be located on a vacant City-owned parcel adjacent to and east of the WWTP. The City prepared a Supplemental IS to address the change in the project and adopted a Supplemental MND on November 14, 2023. The City has further refined the project and now plans to install the biosolids dryers and pyrolysis system (BDPS) within the existing WWTP site. No project components would be located on the City-owned vacant parcel to the east of the WWTP.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
DEP-BWR-NOI-FY27-M36 Grant ANNOUNCEMENT ONLY
Solicitation # BD-27-1045-BWR00-BWR01-133675
The Massachusetts Department of Environmental Protection (MassDEP) is soliciting interest from Public Water Supplies and municipalities with Water Management Act (WMA) permits or registrations to receive a free American Water Works Association (AWWA) M36 water audit. The program is designed to help entities identify water loss objectives, particularly those failing to meet the Unaccounted-for Water (UAW) performance standard of 10 percent or less. Depending on previous audit history and data validity scores, eligible participants can receive either a Top-Down Audit or a Bottom-up Component Analysis. MassDEP will hire a private consulting firm through a separate public procurement process to conduct these audits. Selection is based on criteria including high UAW rates, WMA allocation status, recent improvement efforts, and permit status, with priority given to WMA permit holders and projects benefiting disadvantaged communities. Participation is limited to entities in compliance with the MBTA Communities Act Law. Selected applicants must provide a written commitment to have detailed system information for 2025 or 2026 available by January 15, 2027, and submit that data by February 2, 2027. Additionally, participants must commit significant personnel time as an in-kind match and be prepared to enter into a contract within 15 to 30 days of the grant award. Responses to this Request for Interest are due by October 21, 2026.
BWR00 - Bureau of Water Resources

POSTED

about 17 hours ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS