Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Supply of Overflow Elbow Kit (NSN 4730-01-623-6741)

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332999
New
Federal
ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE
Solicitation # W90VN626QA017
Solicitation W90VN626QA017 is a commercial acquisition conducted under the Logistic Cost Sharing program for the purchase, installation, and integration of DoD Anti-Ram Listed Active Vehicle Barrier (AVB) systems and associated Access Control Point (ACP) control systems at the Morin and Main Gates of Osan Air Base, Republic of Korea. The contractor is responsible for a turn-key scope of work including the demolition and disposal of existing barriers, all necessary civil, electrical, and foundation site work, and the complete installation and power integration of new equipment. A critical component of the project involves complex Programmable Logic Controller (PLC) reprogramming to synchronize operations across gatehouses, overwatch booths, vehicle inspection centers, and traffic lights to ensure fail-safe security functionality during both normal operations and power-loss conditions. Technical requirements specify that equipment must be listed on the DoD Anti-Ram Vehicle Barriers List, with H30/P1 rated barriers required for the Morin Gate and M50/P1 or M50/P2 rated barriers for the Main Gate. Performance standards mandate a powered deployment time of 1.5 seconds or less and a power-loss deployment time of 5 seconds or less. The government will award a firm-fixed-price contract based on the lowest-priced, technically acceptable offer with an acceptable past performance rating. Quotes must be submitted electronically via the PIEE Solicitation Module in four separate volumes, including a redacted technical volume and a price volume in Excel format. Following multiple amendments, the final response deadline is November 4, 2026, with an estimated delivery date of July 30, 2027.
0906 Aq Co Contracting Bat

POSTED

about 9 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

This subcontract involves the manufacture or procurement of an Overflow Elbow Kit, identified by NSN 4730-01-623-6741, to support prime contractors working with the Department of Defense Fluid Handling Division. The supplier must ensure the kit adheres to the DLA Master List of Technical and Quality Requirements and must possess a standard CAGE code and UEI registration. The agreement requires the delivery of one completed kit on a FOB Origin basis, with performance located in Groton, Connecticut. The solicitation was posted on September 1, 2026, with a response deadline of September 14, 2026, under NAICS code 332999.

General Info

Subcontract for one Overflow Elbow Kit for DoD, delivered FOB Origin Groton, Connecticut.

NAICS

332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing

Place of Performance

GROTON, CT, 06340-4905, USA

Set-Aside

NONE

Documents

This scope was carved out of SPE7M3-26-T-8785.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

OVERFLOW ELBOW KIT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FLUID HANDLING DIVISION
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies an Overflow Elbow Kit for prime contractors delivering DLA Land and Maritime Fluid Handling Division contracts. Manufactures or sources the kit identified by NSN 4730-01-623-6741 adhering to the DLA Master List of Technical and Quality Requirements (R/I numbers). Requires standard CAGE code and UEI registration. Delivers one completed Overflow Elbow Kit FOB Origin.

More opportunities from Department Of Defense → FLUID HANDLING DIVISION

Same awarding agency

NAICS: 331210
New
DIBBS
TUBE AND FITTINGS, M
Solicitation # SPE7M4-26-T-8102
Solicitation SPE7M4-26-T-8102 is issued by the Department of Defense Fluid Handling Division for the procurement of three metallic tubes and fittings, identified by NSN 4710-01-315-6793. The requirement is not a small business set-aside and falls under NAICS code 331210. Delivery is required within 248 days after the date of order, with a target delivery date of November 27, 2026, to the DLA Distribution Depot Oklahoma at Tinker AFB. The procurement is managed under the First Destination Transportation program with FOB Origin terms, and both inspection and acceptance will occur at the destination per FAR 52.246-2. Compliance requirements include adherence to the DLA Master List of Technical and Quality Requirements, which takes precedence over ASTM D3951 for packaging. All shipments must be marked and labeled according to MIL-STD-129, and palletization must follow RP001 standards. The contract mandates strict cybersecurity compliance, requiring a CMMC Level 2 self-assessment and the posting of NIST SP 800-171 summary scores in the Supplier Performance Risk System. Additionally, the Buy American and Balance of Payments Program applies to quotes above the micro-purchase threshold, and the use of additive manufacturing processes is prohibited unless specifically authorized. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system.
Iron and Steel Pipe and Tube Manufacturing from Purchased Steel

POSTED

3 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS