Supply of RS148 Standard Enclosed Server Cabinets

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the procurement of 42 black enclosed electronics racks for prime contractors working on Department of Energy projects at Fermilab. The supplier is responsible for manufacturing or providing server cabinets that adhere to RS148 data center standards, specifically requiring 48-depth racks that offer a usable mounting depth ranging from 2 to 42 inches. The agreement includes a one-year manufacturer's limited warranty to ensure equipment quality. All 42 completed units are to be delivered to the designated South Dakota Warehouse.

General Info

Supplier provides 42 RS148 electronics racks to South Dakota Warehouse with one-year warranty.

NAICS

332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing

Place of Performance

IL, 60510, USA

Set-Aside

NONE

Documents

This scope was carved out of RFP387713.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Enclosed Electronics Racks

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies 42 black enclosed electronics racks for prime contractors on Fermilab (DOE) projects. Manufactures or supplies racks meeting RS148 data center enclosed server cabinet standards, ensuring 48-depth racks provide a usable mounting depth between 2 and 42 inches. Provides a one-year manufacturer's limited warranty. Delivers 42 completed enclosed electronics racks to the South Dakota Warehouse.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 23822
New
Federal
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Solicitation # 378854_MR
Fermi Forward Discovery Group LLC is soliciting proposals for the fabrication and installation of a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room at the Fermi National Accelerator Laboratory in Batavia, Illinois. This project, part of the Proton Improvement Plan II, involves the installation of two 50 hp centrifugal pumps, a shell and tube heat exchanger, a 250-gallon expansion reservoir tank, and various process loop equipment including a deionization skid, particulate filter, and dissolved oxygen removal skid. The scope further encompasses the supply and installation of all piping, hardware, process instrumentation, structural supports, foundation bases, and electrical components. All work must adhere to ASME B31.3, B31.9, and BPVC standards, with strict pressure testing and welding inspection requirements overseen by Fermilab representatives. The contract is a firm-fixed-price award based on a lowest price-technically acceptable selection process. Proposals are due by November 19, 2026, and must be submitted in two separate volumes: a technical proposal demonstrating at least ten years of relevant experience and a separate business/price proposal. The period of performance is 180 calendar days from the Notice-to-Proceed. Awardees must provide performance and payment bonds, meet comprehensive construction insurance requirements, and comply with the Davis-Bacon Act for wages. Due to the secured nature of the DOE site, all personnel must be U.S. citizens with a REAL ID and submit access requests at least seven days in advance of site visits. Compliance with the Buy American Act, FAR regulations, and stringent Fermilab Environmental, Health, and Safety Manual (FESHM) protocols is mandatory.

POSTED

2 days ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS