PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Open
Federal
Response DeadlineDue in 7 days
Solicitation #
378854_MR
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
This project involves the fabrication and installation of a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope of work includes the installation of two 50 hp centrifugal pumps, a shell and tube heat exchanger, a 250-gallon expansion reservoir tank, and various process loop equipment such as a deionization skid, particulate filter, and dissolved oxygen removal skid. The contractor is responsible for providing all piping, hardware, process instrumentation, structural supports, and foundation bases, as well as performing electrical installations. The project is unrestricted and will be awarded based on a lowest price-technically acceptable (LPTA) selection process.
The period of performance is 180 calendar days from the receipt of the Notice-to-Proceed. Key technical requirements include compliance with ASME B31.3 and B31.9, as well as Fermilab's specific pressure testing and piping manuals. Contractors must provide a project-specific quality control plan and adhere to strict safety standards, including 10 CFR 851 and FESHM Chapter 7010. Proposals must be submitted in two separate parts—technical and business/price—by December 3, 2026, at 2:00 p.m. CDT. Required certifications include the Buy American Act, DEI discrimination compliance, and the provision of performance and payment bonds. Access to the secured DOE site requires U.S. citizenship, a REAL ID, and an access request submitted at least seven days in advance.
General Info
Fabrication and installation of LCW piping system at Fermi National Accelerator Laboratory.
PDF, High priority: read this first3 pages · specifications
HighAI Summary for 2025 Construction Insurance Requirements - Fermilab: This document outlines the minimum insurance coverage requirements for construction subcontractors working at the Fermi National Accelerator Laboratory (Fermilab). It specifies limits for General Liability, Automobile Liability, Excess Liability, Workers' Compensation, and Professional Liability, as well as requirements for additional insureds and prohibited exclusions.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for Addenda 1: The document is identified as Addenda 1, which serves as an amendment to a procurement solicitation. However, the provided content is insufficient to determine the specific changes or the primary project it modifies.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addenda 2: This document is identified as Addenda 2, serving as an amendment to a procurement file. The content provided is a placeholder stating that all information is accurate as of the date of preparation.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 03 - PIP-II F-37 LCW Pump Room Piping: Addendum 03 for solicitation 378854_MR regarding the PIP-II F-37 LCW Pump Room Piping project. Issued November 12, 2026, this amendment extends the proposal due date from November 19, 2026, to December 3, 2026, at 2:00 P.M. CST. All other terms and conditions remain unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 04 - PIP-II F-37 LCW Pump Room Piping: Addendum No. 04 for solicitation 378854_MR regarding the PIP-II F-37 LCW Pump Room Piping project. Issued November 16, 2026, this amendment provides updated drawings F10170043-B and F10151066-D. Proposals are due by December 3, 2026.
PDF
PDF, High priority: read this first6 pages · specifications
HighAI Summary for Construction Environmental, Safety & Health Certification (CESHC) - Fermilab: This document is a template and instruction set for the Construction Environmental, Safety & Health Certification (CESHC) required for subcontractors at DOE's Fermi National Accelerator Laboratory (Fermilab). It outlines requirements for project descriptions, emergency contacts, ES&H program policies, and compliance with 10 CFR 851 Worker Safety and Health Programs. The document includes forms for project governance, medical facility routing, and safety representative qualifications (Rev. 06/2020).
PDF
PDF, High priority: read this first7 pages · specifications
HighAI Summary for Exhibit 17 FL-55 Small Business Subcontracting Plan: This document (FL-55 Rev 6/23) outlines the requirements for a Small Business Subcontracting Plan. It defines key terms (ANC, Commercial plan, eSRS), specifies the mandatory goals for various small business categories (including veteran-owned, HUBZone, and women-owned), and details the required components of a submission, such as planned subcontracting dollars and methods for identifying potential sources.
PDF
PDF, High priority: read this first4 pages · bid-bond
HighAI Summary for Exhibit 21 - Bid Bond (Standard Form 24): A bid bond form (Standard Form 24 / FermiForward Form FLL-41) used to provide a financial guarantee for a bid submitted to the United States Government and Fermi Forward Discovery Group, LLC. It includes sections for the Principal and Surety details, penal sum, and detailed instructions for execution and submission.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Exhibit 7: Addendum to Environmental, Health & Safety Requirements: This document is an addendum to the Fermilab Environmental, Health & Safety Manual (FESHM), Chapter 7010, for construction subcontracts. It outlines critical safety requirements, including mandatory Job Hazard Analysis (JHA) submissions, OSHA training record maintenance, PPE inspection protocols, and site access/badging procedures. It also specifies safety evaluation criteria for sub-tier subcontractors, such as EMR rates and OSHA 300 logs.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for F10170043 Utility Room Equipment Layout: Technical drawings and specifications for a utility room equipment layout renovation project. Includes plan views, elevation views (Sections A-A through H-H), and general notes regarding materials, licensed contractor requirements, and NFPA standards. Dated October 12, 2023.
PDF
PDF, High priority: read this first5 pages · sow
HighAI Summary for F37 LCW Electrical Statement of Work (Rev A): Revision A of the Statement of Work for electrical work in the F37 mechanical room. The document specifies material procurement requirements (including VFDs, conduit, and cabling), installation responsibilities such as coring and fire-stopping, and provides a load schedule for motors and skids. It includes references to three technical prints for pumps, conduit, and signal tray plans.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for F37 LCW Pump Room PID - Power Connection and Valve List: Technical specification document dated July 2023 regarding the F37 Building LCW Pump Room. It includes a power supplies list, valve nomenclature (e.g., balance, check, gate, and pressure relief valves), and a list of piping components such as reducers, flexible connections, and flow meters.
PDF
PDF, High priority: read this first14 pages · proposal-certifications
HighAI Summary for Fermilab Proposal Certifications (PROC-FRM-466): Fermilab procurement form (Version 1.0, effective 10/1/2026) requiring offerors to certify compliance with specific federal regulations. Key sections include FAR 52.222-90 regarding DEI discrimination (required for all), Export/Import control and Buy American construction material certifications (required for proposals ≥ $15,000).
PDF
PDF, High priority: read this first23 pages · specifications
HighAI Summary for FESHM 5031.1: Piping Systems: Fermilab ES&H Manual (FESHM 5031.1), revised March 2025, establishing procedures for the design, fabrication, inspection, and testing of piping systems. It defines technical requirements for 'Low Stress Piping', outlines responsibilities for project managers and the ES&H Division, and specifies the use of Engineering Notes for compliance certification.
PDF
PDF, High priority: read this first11 pages · sow
HighAI Summary for FESHM 5034 Pressure Testing Manual: Fermilab ES&H Manual FESHM 5034, Rev. 01/2021 (January 2021), for pressure testing. It sets requirements for conducting and documenting pressure tests on vessels and piping systems, including scope, definitions, special responsibilities, standing hydrostatic test permit conditions, and detailed procedural requirements. The document includes safety precautions, reviewer/observer roles, permit/signature requirements, and references to ASME pressure codes and related FESHM chapters.
PDF
PDF, High priority: read this first25 pages · contract-document
HighAI Summary for FFDG General Terms and Conditions for Construction: This document titled 'FFDG General Terms and Conditions for Construction' outlines the general provisions, payment terms, and other contractual clauses for a construction subcontract under Fermi Forward Discovery Group, LLC (FFDG). It includes definitions, scope of subcontract, independent contractor status, assignment rules, acceptance conditions, and time sensitivity. The document references compliance with Federal Acquisition Regulation (FAR) and Department of Energy Acquisition Regulation (DEAR), and covers indemnification, termination, laws and regulations, site access, safety, insurance, and wage requirements. It serves as a binding agreement framework for construction work performed under FFDG's prime contract with the Department of Energy.
PDF
PDF, High priority: read this first21 pages · specifications
HighAI Summary for Flowserve Proposal - LCW Circulating Water Pumps (RFP-374702-GMG): Technical proposal from Flowserve dated December 1, 2025, for two LCW Circulating Water Pumps (Model 2K3x2-10ARV M3 ST / 1). The document details technical specifications including mechanical seals, couplings, baseplate requirements, instrumentation, quality assurance testing (ANSI/HI 14.6), and painting standards. It also lists a comprehensive documentation package, motor specifications (ABB IEEE 841XL), and available spare parts options. Delivery is estimated at 22 working weeks after order receipt, with a proposal validity of 30 days.
PDF
PDF, High priority: read this first6 pages · specifications
HighAI Summary for FRA Section 014100 - Quality Requirements: Dated January 2026, this document outlines the quality requirements for subcontractors, specifically detailing the necessity of a Corporate Quality Assurance Plan and a Project Quality Control (PQC) Plan. It defines the roles and responsibilities of the Project Quality Control Manager and provides detailed guidance in Appendix A for the elements required within a Corporate QA Plan, including document control, material management, and nonconformance handling.
PDF
PDF, High priority: read this first22 pages · wage-determination
HighAI Summary for General Decision Number IL20260008: Wage determination for building and residential construction projects in several Illinois counties (Du Page, Grundy, Kane, Kendall, Lake, McHenry, and Will), excluding landscape projects. The document lists hourly rates and fringes for various trades, including hazardous material handlers, boilermakers, bricklayers, carpenters, electricians, and elevator mechanics. The most recent modification date is 05/18/2026.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for HX Drawing for F37: Technical drawing and specification document for HX F37, detailing dimensional standards in inches and millimeters and providing a 5-year UV warranty for all products.
PDF
PDF, High priority: read this first5 pages · contract-document
HighAI Summary for PIP-II CPB HX and Pump Subcontract: A firm fixed-price subcontract between Fermi Forward Discovery Group, LLC (FFDG) and a TBD subcontractor for construction work related to the PIP-II CPB HX and Pump (Project No. 4-3-3G). The document outlines the scope of work, a 180-day period of performance, payment terms including a 10% retention, and invoicing procedures. It is issued under Prime Contract No. 89243024CSC000002 with the Department of Energy.
PDF
PDF, High priority: read this first17 pages · specifications
HighAI Summary for PIP-II F37 Building Low Conductivity Water Specification (ED0042585): Technical installation specification (ED0042585, Rev B) for the Low Conductivity Water (LCW) Pump Room Piping System in the F37 Building for the PIP-II Project at Fermi National Accelerator Laboratory. The document defines the scope of work, including installation of centrifugal pumps, heat exchangers, reservoir tanks, deionization skids, and associated piping, instrumentation, and electrical components. It specifies requirements for materials, welding, inspection, leak testing, and applicable codes/standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PIP-II F37 Pump Room Concrete Pad Specification: Technical specifications for the furnishing and installation of reinforced concrete foundations, bases, and supports (housekeeping pads) for mechanical equipment, specifically centrifugal pumps, in the PIP-II F37 Pump Room.
PDF
PDF, High priority: read this first5 pages · specifications
HighAI Summary for PIP-II Low Conductivity Water (LCW) System Instrumentation Specification: Document ED0042584, issued for bid in January 2026, provides detailed technical specifications for instrumentation and process filters for the F37 Pump Room of the PIP-II Low Conductivity Water (LCW) System at Fermilab. It includes a comprehensive equipment list with specific part numbers and requirements for pressure switches, gages, flow transmitters, sensors, and particulate filters.
PDF
PDF, High priority: read this first19 pages · specifications
HighAI Summary for PIP-II Pipe Support Analysis and Design Deliverable PO 683434: Technical deliverable for the PIP-II Linac Complex at Fermi National Accelerator Laboratory (DOE). The document includes structural analysis for F37 and CPB areas, PCW piping thermal expansion calculations, piping layout plans, and detailed specifications for HVAC supports and anchors (Section 23 05 29), including hanger rod diameter requirements and material standards.
PDF
PDF, High priority: read this first12 pages · rfp
HighAI Summary for RFP #378854_MR - PIP-II F37 Building LCW Pump Room Piping System Installation: Request for Proposal issued on October 6, 2026, by Fermi Forward Discovery Group, LLC (FFDG) for the fabrication and installation of a Low Conductivity Water (LCW) Pump Room Piping System at Fermilab as part of the Proton Improvement Plan II (PIP-II) project. The document outlines submission requirements, NAICS code 238220, a pre-proposal site visit on October 27, 2026, and a question deadline of November 5, 2026.
PDF
PDF, High priority: read this first19 pages · specifications
HighAI Summary for Section 010010 - General Requirements: PIP-II F-37 LCW System Piping System Installation: Dated January 2026, this document outlines the general requirements for the PIP-II F-37 LCW System Piping System Installation at Fermilab. It defines the scope of work, including the provision of labor, materials, and supervision for piping installation, and specifies site locations, FFDG-furnished services, and compliance with the Buy American Act. It serves as a supplementary specification to the FFDG Subcontract General Provisions.
PDF
PDF, High priority: read this first45 pages · specifications
HighAI Summary for Section 013100 - Environment, Safety, and Health Requirements: This document outlines the Environment, Safety, and Health (ES&H) requirements for subcontractors working at Fermi National Accelerator Laboratory (Fermilab) under the Fermi Forward Discovery Group (FFDG). Dated January 2026 (with references to March 2022), it specifies compliance with DOE, OSHA, and EPA regulations, including radiation protection, hazard analysis, and site-specific safety protocols.
PDF
PDF, High priority: read this first5 pages · specifications
HighAI Summary for Section 013300 - Submittals: Dated June 2025, this technical specification section (013300) outlines the general methods and requirements for project submittals. It details the processes for shop drawings, material samples, O&M manuals, and as-built drawings, including the review cycle, approval codes (NET, R/R, MCP, R, FIO), and material substitution procedures. It also includes a Submittal for Review Transmittal form for Fermi National Accelerator Laboratory.
PDF
PDF, Low priority2 pages · past-performance
LowAI Summary for Fermilab Subcontractor Injury & Illness Data Questionnaire: A safety data collection form for Fermilab subcontractors requiring the disclosure of Workers' Compensation insurance details, OSHA 300 log data, and experience modification rates for the past three years to evaluate safety performance.
PDF
PDF, Low priority4 pages · performance-bond
LowAI Summary for Performance Bond (Standard Form 25 / FermiForward Form FL-40): A performance bond form (Standard Form 25, Rev 10/2023; FermiForward Form FL-40, 1/7/2025) used to ensure the Principal fulfills all contract terms and conditions. The document includes fields for the Principal, Sureties, penal sum, and detailed instructions for execution and corporate seal requirements.
PDF
PDF, Low priority2 pages · contract-document
LowAI Summary for SF1413 Statement and Acknowledgment - Prime Contract 89243024CSC000002: Standard Form 1413 (Revision 10/2023) used for the statement and acknowledgment of a subcontract award. The document identifies Femi Forward Discovery Group, LLC as the prime contractor under contract 89243024CSC000002, with a scope of work involving labor, equipment, and installation for the PIP-II CPB HX and Pump (Project No. 4-3-3G).
PDF
PDF, Low priority3 pages · payment-bond
LowAI Summary for Standard Form 25A - Payment Bond: A standard payment bond form (SF 25A, Rev 10/2023) used for Fermi Forward Discovery Group, LLC subcontracts. The document outlines the obligations of the Principal and Surety to ensure payment to laborers and material suppliers, and includes detailed instructions for execution and corporate surety requirements per GSA-FAR 53.228(c).
LowAI Summary for Subcontractor Annual Representations & Certifications (SARC): A standard form (PROC-FRM-100 v1.0, released 10/01/2026) used by Fermi Forward Discovery Group, LLC to collect annual business category, ownership, size status, executive compensation, and accounting system certifications from subcontractors to ensure compliance with FAR and federal regulations.
This scope of work includes fabricating and installing a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room.
PLEASE NOTE the important information related to this RFP:
Pre-Proposal Meeting and Site Visit: October 27, 10:00a CDT
Last Day for Questions: November 5, 2026, 4:00p CDT
PROPOSALS DUE: December 3, 2026, 2:00p CDT
To attend the Pre-Proposal Meeting and Site Visit, PPE is required.
As Fermilab is a federal facility, to access the Fermilab site, offerors MUST complete an Access Request form AT LEAST SEVEN (7) DAYS IN ADVANCE OF THE MEETING. AS THIS IS A SECURED DOE SITE, FNAL IS UNABLE TO PROCESS ACCESS REQUESTS THAT ARE NOT RECEIVED 7 DAYS PRIOR TO THE PRE-SOLICITATION CONFERENCE. Additionally, to obtain on-site access approval, attendees must be a U.S. Citizen and have a REAL ID.
Please note that when entering Fermilab:
All vehicles are subject to search
No weapons, firearms, or ammunition (regardless of concealed carry permit) are allowed on-site.
No explosives or any other apparatus or material hazardous to the public or property are allowed on site.
No possession or illegal use of controlled substances or intoxicants, or being under their influence, is allowable.
No personal alcohol or marijuana
No Smoking or vaping within buildings and within 15-25 feet of entrances
Illinois Rules of the Road are to be followed while driving on Fermilab’s premises.
More opportunities from Department Of Energy → Fermilab - DOE Contractor
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.