Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Utility Excavation and Trenching Services

Open
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Batavia, IL, 60510, USA

Set-Aside

SBA

Documents

This scope was carved out of 385439GMK.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

UTILITY EXCAVATION AND REPAIR SERVICES IDIQ

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 13 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom UTILITY EXCAVATION AND REPAIR SERVICES IDIQ
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs excavation and trenching for prime contractors on Fermilab utility projects. Executes excavation for power lines, transmission lines, substations, transformers, and water/sewage treatment plants. Utilizes heavy excavation equipment and trenchers across a 6,800-acre site for on-call, scheduled, and emergency services. Must support 24/7/365 operations. Delivers open trenches prepared for installation or backfilled and restored sites.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Four Quads North Section Maintenance Dredging
Solicitation # 2027-ITB-PW-006-KR
The City of Cape Coral, Florida, is soliciting bids for the Four Quads North Section Maintenance Dredging project (Solicitation 2027-ITB-PW-006-KR). The scope of work involves providing all labor, materials, and equipment necessary to perform dredging operations in Cape Coral, with a total dredge volume of 1,486 cubic yards and a maximum dredge depth of -5.00 FT MLW per A.C.O.E. permit. The project requires strict adherence to water quality standards pursuant to Section 62-302 F.A.C. and the protection of threatened burrowing owls, which are marked by white PVC stakes. Contractors must provide a payment and performance bond for 100% of the contract amount and meet comprehensive insurance requirements, including Commercial General Liability, Pollution/Environmental Pollution Liability, and Longshore and Harbor Workers' Compensation. Bids must be submitted electronically via the OpenGov platform by December 9, 2026. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation factors including price, bidder capacity, reputation, and past performance. Performance is subject to regular working hours of 7:00 AM to 7:00 PM, Monday through Friday. Payments are made via direct deposit (ACH) within 25 business days of invoice acceptance, though the City's obligation to pay is contingent upon annual appropriation by the City Council. This solicitation is not set aside for any specific business category.
Public Works

POSTED

about 2 hours ago

DEADLINE

in 14 days
View Details

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 236210
New
Federal
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Solicitation # RFP-376508-CD
The Central Utility Building (CUB) Addition and Renovation project, designated as UIP Subproject 1-CUB, involves the expansion and revitalization of the CUB at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope of work includes the construction of a building addition to accommodate new chillers, selective demolition of existing infrastructure, and comprehensive upgrades to the heating hot water, chilled water, and electrical systems, including the installation of medium voltage switches and transformers. The project is critical to Fermilab's mission as the CUB provides essential utility services to various lab buildings. This is a firm-fixed-price contract with no set-aside used. Construction is strictly constrained by the accelerator shutdown window, with on-site efforts anticipated to start on January 1, 2028, and conclude by January 1, 2030, with a final completion deadline of October 1, 2029. Key milestones include the issuance of the Notice to Proceed by December 30, 2027, and the completion of the CUB extension and upgrades by September 28, 2029. Award selection is based on a best-value tradeoff method where technical factors are significantly more important than price. Offerors must meet stringent pass-fail requirements, including a minimum current ratio of 1.20, an aggregate bonding capacity of at least $100 million, and the provision of audited financial statements for the past three fiscal years.
Industrial Building Construction

POSTED

6 days ago

DEADLINE

in 22 days
View Details
NAICS: 332999
Federal
WFE Solenoid/Corrector Magnet Spares
Solicitation # 389116swk
Fermilab, managed by the Fermi Forward Discovery Group (FFDG) for the Department of Energy, is soliciting proposals for the design, manufacturing, fabrication, and delivery of two solenoid magnets with integrated dipole corrector magnets. These components are critical for steering, focusing, and matching a 30 keV H+ beam from an ion source into a Radio Frequency Quadrupole accelerator. The scope of work includes comprehensive quality control, magnetic testing, and the provision of detailed documentation such as final design reports, material certifications, and QC fabrication and inspection plans. Deliverables must be shipped F.O.B. Fermilab in a single batch, with strict packaging requirements to prevent corrosion and structural damage, including the use of shock indicators for loads exceeding 10 G. The procurement utilizes a best value trade-off source selection process, where technical proposals, infrastructure capabilities, schedule (via Gantt chart), and past experience are weighted as significantly more important than cost. Proposals are due by January 5, 2027, at 5pm Central, with a prior question deadline of November 30, 2026. Awardees must undergo a series of program reviews, including an initial kickoff, a Preliminary Design Review at 50% maturity, and a Final Design Review at 90-100% maturity before production begins. There is no specified set-aside status for this solicitation.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

8 days ago

DEADLINE

in about 1 month
View Details
NAICS: 23822
Federal
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Solicitation # 378854_MR
This project involves the fabrication and installation of a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope of work includes the installation of two 50 hp centrifugal pumps, a shell and tube heat exchanger, a 250-gallon expansion reservoir tank, and various process loop equipment such as a deionization skid, particulate filter, and dissolved oxygen removal skid. The contractor is responsible for providing all piping, hardware, process instrumentation, structural supports, and foundation bases, as well as performing electrical installations. The project is unrestricted and will be awarded based on a lowest price-technically acceptable (LPTA) selection process. The period of performance is 180 calendar days from the receipt of the Notice-to-Proceed. Key technical requirements include compliance with ASME B31.3 and B31.9, as well as Fermilab's specific pressure testing and piping manuals. Contractors must provide a project-specific quality control plan and adhere to strict safety standards, including 10 CFR 851 and FESHM Chapter 7010. Proposals must be submitted in two separate parts—technical and business/price—by December 3, 2026, at 2:00 p.m. CDT. Required certifications include the Buy American Act, DEI discrimination compliance, and the provision of performance and payment bonds. Access to the secured DOE site requires U.S. citizenship, a REAL ID, and an access request submitted at least seven days in advance.

POSTED

9 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS