Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Supply of Sand (Friction Material)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract is for the supply of dry, clean sand intended for use as a friction material to enhance traction on icy or snow-covered roadways within Midland County. This subcontract falls under NAICS code 212324, which pertains to sand and gravel mining, and is procured by the Texas Department of Transportation through the Texas SmartBuy platform. The solicitation was posted on July 20, 2026, with a response deadline of August 11, 2026, at 4:00 PM. Delivery must meet specific quality standards to ensure the sand is free from contaminants and suitable for winter road maintenance operations. The sand will be used exclusively for roadway safety purposes in Midland County, and performance location is restricted to this geographic area. While no set-aside provisions are specified, the transaction is structured as a subcontract under the broader procurement framework of the Texas Department of Transportation.

General Info

Supply of clean sand for icy road traction in Midland County, Texas, via Texas SmartBuy by August 11, 2026.

Agency

Texas Department of Transportation

NAICS

212324 - Kaolin and Ball Clay MiningView NAICS

Place of Performance

TX, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas Department of Transportation
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Delivery of dry, clean sand used for traction enhancement on icy or snow-covered roadways in Midland County.

Similar Contracts

Same NAICS industry code

NAICS: 212324
SLED
Class III Channel Lining SupplyThe contract involves the supply of Class III channel lining material designed to mitigate erosion in waterways that are highly susceptible to degradation, with all materials required to meet Kentucky Transportation Cabinet standards for durability and performance. This subcontract is focused on ensuring that the lining products comply with specific engineering specifications to protect critical drainage infrastructure across Kentucky’s road network, particularly in areas prone to water-induced soil loss. The material must be suitable for long-term use under varying climatic and hydrological conditions, and its deployment is intended to enhance the longevity and safety of transportation-related water management systems. All bids must be submitted by the deadline of July 22, 2026, at 5:30 PM Eastern Time, following the solicitation posted on July 14, 2026. The North American Industry Classification System code 212324 indicates the scope relates to nonmetallic mineral mining and quarrying, implying the lining material is derived from processed natural aggregates or similar mineral-based compositions. Performance is expected to occur statewide under the oversight of the KYTC Division of Maintenance, with delivery and application requirements aligning with the operational needs of multiple locations across Kentucky, including unspecified sites designated as “Other.” Bidders must be prepared to meet stringent quality controls and logistical demands to ensure timely and compliant material delivery.
KYTC-Div of Maintenance

POSTED

8 days ago

DEADLINE

in about 3 hours
View Details