Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Surface Restoration and Cleanup

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Stockton, CA, 95207, USA

Set-Aside

NONE

Documents

This scope was carved out of UH21004.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Bonniebrook Water Service Lateral Reconnection

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 31 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom Bonniebrook Water Service Lateral Reconnection
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Stockton
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Stockton
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Restores the ground surface after utility installation for prime contractors on City utility infrastructure projects. Removes debris, backfills trenches, and restores the surface using asphalt, concrete, or landscaping to original or specified conditions. Delivers a restored surface and a clean project site.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Construction On State Highway In Lake County Near Lower Lake On Route 29 From Coyote Creek Bridge To Diener Drive/Road 543 And On Route 53 At Route 29
Solicitation # 01-0J9304
Solicitation 01-0J9304 is a construction project managed by the California Department of Transportation for state highway improvements in Lake County. The scope of work focuses on Route 29 from Coyote Creek Bridge to Diener Drive/Road 543 and Route 53 at Route 29, involving cold planing of AC pavement and the installation of Rubberized Hot Mix Asphalt Gap Graded overlay and Hot Mix Asphalt Type A surfacing. The project has an estimated cost of 14,400,000 USD, with bidding requirements specifying a bidder's security of at least 10 percent and a performance timeline between 100 and 140 working days. The contract is governed by the 2025 Standard Specifications and specific Special Provisions, including strict Buy America/Build America requirements and environmental mandates. Contractors must ensure equipment is pressure washed to prevent invasive species and provide environmental product declarations for concrete and asphalt. Key personnel requirements include a safety representative with specific certifications from the Board of Certified Safety Professionals or the National Association of Safety Professionals, as well as valid first aid and CPR certifications. Job site activities must commence within 55 days of contract approval, and all work must adhere to local codes, MASH Test Level 3 safety standards, and RWQCB water quality objectives.
California Department of Transportation

POSTED

about 4 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from California → City of Stockton

Same awarding agency

NAICS: 541330
New
SLED
Design Services For Water Well No. 30 Rehabilitation
Solicitation # UH26004
The City of Stockton is soliciting professional engineering services for the Water Well No. 30 Rehabilitation Project located in Lodi, California. The primary objective of this project is to ensure that water quality meets all Title 22 drinking water quality standards while maintaining a well capacity of approximately 2,000 gallons per minute. The scope of work includes the development of a Preliminary Design Report that identifies treatment options for 1,2,3-TCP and provides a 10-year capital and O&M cost analysis, the creation of full construction documents, the preparation of water system permit amendment applications, and the provision of engineering support during the bidding process. Proposals are due by December 3, 2026, and must be submitted to the Office of the City Clerk in Stockton. The submission must include one original with wet ink signatures, three copies, and a USB containing an electronic version, with the fee proposal submitted in a separate sealed envelope and a passcode-protected file on the USB. The City will use a ranking process to select the most qualified consultant, evaluating proposals based on technical merit before reviewing cost proposals. Selected contractors must comply with prevailing wage requirements, ADA standards, and non-discrimination laws, and must provide a Certification of Financial Condition to ensure financial soundness and tax compliance. Payment for services is processed within 30 days of receiving an approved invoice.
Engineering Services

POSTED

about 4 hours ago

DEADLINE

in 17 days
View Details
NAICS: 237110
New
SLED
Bonniebrook Water Service Lateral Reconnection
Solicitation # UH21004
The City of Stockton is soliciting bids for the Bonniebrook Water Service Lateral Reconnection project (UH21004), which involves the installation of approximately 300 linear feet of 1-inch potable water service lines using Horizontal Directional Drilling (HDD). The scope of work covers six residential homes along Bonniebrook Drive, between Woodside Drive and Fernvale Drive, in Stockton, California. The contractor is responsible for all labor, materials, and equipment required to extend service lines from new water meter boxes in residential front yards to existing potable water systems. Key deliverables include HDD installation, residential service transfer, capping and abandoning existing services, testing, flushing, disinfection, commissioning, and final surface restoration and cleanup. The contract will be awarded to the lowest responsive and responsible bidder based on the total price of the base bid and any selected alternates. Bidders must submit sealed envelopes containing official bid documents, a non-collusion declaration, and bid security. The successful contractor must provide both a Faithful Performance Bond and a Labor and Materials Bond, each for 100 percent of the contract bid price, issued by a company authorized in the State of California. Additionally, the contractor must adhere to prevailing wage rates and Title VI non-discrimination requirements. All work and materials are subject to inspection by the Construction Manager, and no work may be concealed without prior approval. Materials must be stored according to manufacturer instructions and hazardous materials must be handled in accordance with Material Safety Data Sheets and federal, state, and local regulations.
Water and Sewer Line and Related Structures Construction

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS