Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Surface Water Diversion (Notification of Lake or Streambed Alteration, No. EPIMS-TRI-55891-R1)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has authorized a domestic water diversion project under Lake and Streambed Alteration Agreement EPIMS-TRI-55891-R1, permitting Heather O’Connell to install and operate a non-impounding diversion structure in a spring-fed tributary to Grub Gulch near Weaverville, California. The system consists of a buried perforated PVC barrier dam with two one-inch intake pipes and one one-inch overflow pipe, designed to channel water via a three-quarter-inch polyline by gravity to a parcel located just west of the project site. Operation is strictly regulated by Water Right A026786, with seasonal flow limits: 80 gallons per day from June 1 through September 20 and 40 gallons per day from October 1 through May 31. The structure is engineered to allow natural streamflow over its top, ensuring no ponding or obstruction, and qualifies for a categorical exemption under California Code of Regulations Title 14, Section 15303, due to its minor, non-hazardous nature and minimal environmental impact. All work must conform to the Fish and Game Code Section 1602, and no impoundment or alteration of natural flow is permitted. The project is not a federal contract and does not involve standardized Federal Acquisition Regulation clauses, procurement processes, or financial terms. It is a regulatory compliance notification approved under state authority, with no solicitation, competitive bidding, or contract value established. The approval is administered by the CDFW Region 1 Northern Office, with oversight handled by environmental scientists and habitat program managers responsible for ensuring compliance with CEQA and water rights conditions. There is no formal payment mechanism, invoicing process, contracting officer, or technical representative assigned under federal models, and no socioeconomic, size, or entity certifications are required or provided. Performance is defined by adherence to seasonal flow rates, structural specifications, and the absence of streambed obstruction, with acceptance contingent upon regulatory compliance rather than formal inspection or delivery protocols. The location is legally described as Section 10, Township 33N, Range 10W, Mt. Diablo Base and Meridian, with a physical address at 161 Shasta View Lane, Weaverville, CA 96093.

General Info

Heather O’Connell may divert up to 80 GPD summer, 40 GPD winter via non-impounding structure in Grub Gulch tributary under state water right.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

161 Shasta View Lane, CA, 96093

Set-Aside

NONE

Documents

(1)

EPIMS-TRI-55891-R1 Surface Water Diversion Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Kate BlanchardSenior Environmental Scientist, Specialist

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-TRI-55891-R1, pursuant to Section 1602 of the Fish and Game Code to Heather O’Connell. The project is limited to installation, maintenance, and use of a new diversion structure to be used for domestic purposes. The structure will be a perforated PVC barrier dam buried within the streambed. There will be two 1-inch intake pipes and one 1-inch overflow pipe; the intake pipes will converge into a ¾” polyline that will be gravity fed to the Permittee’s parcel just west of the project parcel. The PVC barrier dam will be buried at a depth that allows water to flow over the top and will not impound flow. Water will be diverted as specified in Water Right A026786. Annually, from June 1-September 20, water will be diverted at a rate of 80-gallons per day and from October 1-May 31, water will be diverted at a rate of 40-gallons per day.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # haleiwa-small-boat-harbor-maintenance-dredging-revetted-mole-repair
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Hawaii. This firm-fixed-price contract, issued as an Invitation for Bid under NAICS code 237990, has an estimated value between 1 million and 5 million dollars. The scope of work includes mobilization and demobilization, the dredging and ocean disposal of 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The period of performance is 200 calendar days from the date of the Notice to Proceed. The project requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. The contract includes a liquidated damages clause of 2,297 dollars per calendar day of delay. Award is based on a lowest responsive and responsible bidder selection process, with specific set-asides for various small business categories, including HUBZone, WOSB, and SDVOSB. Invoicing is conducted monthly, and the contractor must provide a detailed breakdown of pay items within 30 days of the Notice to Proceed.
Healy Tibbitts Builders, Inc.

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trade services including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 5 hours ago

DEADLINE

in 13 days
View Details