Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Sustainability and Energy Efficiency Upgrades

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

San Diego County is seeking a subcontractor to implement comprehensive sustainability and energy efficiency upgrades at a secure facility, focusing on the integration of solar photovoltaic systems, battery energy storage, Zero Net Energy design, and low-carbon construction materials. The project aims to significantly reduce the facility’s carbon footprint and operational energy demand while ensuring long-term resilience and compliance with sustainability targets. All work must be executed in alignment with the security requirements of the site, and the deliverables must support measurable reductions in energy use and greenhouse gas emissions. The solicitation was posted on July 28, 2026, with proposals due by September 15, 2026, and the project falls under NAICS code 237117 for utility system construction. The scope demands expertise in energy system design, renewable integration, and sustainable building practices within a controlled institutional environment.

General Info

Subcontractor needed to install solar, battery storage, and low-carbon systems at secure facility for Zero Net Energy and emissions reduction.

Agency

California → San Diego CountyView Agency

NAICS

Place of Performance

San Diego, CA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego County
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → San Diego County
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Implementation of solar (PV), battery storage (BESS), Zero Net Energy (ZNE), and low-carbon materials to meet sustainability goals in a secure facility.

Similar Contracts

Same NAICS industry code

More opportunities from California → San Diego County

Same awarding agency

NAICS: 238210
New
SLED
Electrical Systems Installation (Detention-Grade)The contract involves the installation of detention-compliant electrical systems in San Diego, requiring full adherence to safety and security standards specific to correctional facilities. Scope includes the supply and installation of lighting, power distribution networks, control panels, and instrumentation, all housed within Allen-Bradley/NEMA 1 enclosures to ensure durability and protection in high-risk environments. The work must meet rigorous industry specifications for detention-grade infrastructure, with all components selected and configured to prevent tampering, withstand physical abuse, and maintain operational integrity under continuous use. The contract is classified as a subcontract under NAICS code 238210, indicating specialized electrical contracting services, and was posted on July 28, 2026, with a deadline for responses set for September 15, 2026. Performance is to occur within San Diego, under the oversight of San Diego County, though specific point of contact and mailing details are not provided. The solicitation remains unassigned to any set-aside program, meaning all eligible contractors may respond without restriction based on size, ownership, or other classification. Interested parties must access the official portal via the provided URL for full submission guidelines and documentation.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

2 days ago

DEADLINE

in about 2 months
View Details