Swanley Park Footpath Refurbishment

Active
STC Footpaths (15)International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Swanley Town Council is soliciting quotes from qualified contractors for the Swanley Park Footpath Refurbishment project. The scope of work involves the excavation, removal, and reconstruction of two footpaths to improve accessibility and durability. Footpath One consists of approximately 355.4 linear metres widened to 2.5 metres and must be constructed to support occasional vehicular access. Footpath Two will be extended from 29 linear metres to approximately 62.3 linear metres with a finished width of 2 metres. The appointed contractor will be responsible for site preparation, sub-base installation, and final construction, including edging and reinstatement. The Council is evaluating several surfacing options, including tarmac, block paving, and self-binding gravel, and expects the contractor to provide guidance on durability and whole-life costs. All submissions must be sent to Ryan Hayman by the deadline of November 30, 2026.

General Info

Swanley Town Council seeks quotes for footpath refurbishment by November 30, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGovernment of the United Kingdom → Swanley Town Council
Contacts1 person available
OfficeSWANLEY, BR87BU, GBR
Office AddressSWANLEY, BR87BU, GBR
Contacts
Ryan HaymanPoint of Contact

Full Description

Show more
Swanley Town Council is seeking suitably qualified and experienced contractors to undertake the excavation, removal, reconstruction and improvement of two existing footpaths. The project aims to improve accessibility, durability and the overall quality of the footpath network through the installation of wider, fit-for-purpose pathways that meet the requirements of their intended use. The works will comprise the following: Footpath One Footpath One extends approximately 355.4 linear metres and will broadly follow the alignment of the existing footpath. The pathway will be widened to provide a finished width of approximately 2.5 metres, excluding edging. The construction must be suitable for occasional vehicular access, with the appropriate sub-base and construction specification provided to accommodate this requirement. Footpath Two Footpath Two currently measures approximately 29 linear metres and will be extended to approximately 62.3 linear metres. The completed pathway will provide a finished width of approximately 2 metres, excluding edging, improving the provision and usability of the route. Surfacing Options and Construction Requirements The Council is currently exploring a range of surfacing options for the proposed footpaths, including self-binding gravel, tarmac and block paving. Contractors may be required to consider the suitability, durability, maintenance requirements, accessibility and whole-life costs associated with these options to help inform the Council's final decision on the preferred surfacing materials. The appointed contractor will be expected to undertake the necessary excavation and removal of existing footpath materials, prepare the underlying formation, install an appropriate sub-base and construct the new footpaths in accordance with the agreed specification. The works will also include suitable edging, finishing details and any associated reinstatement required to leave the completed pathways in a safe, stable and serviceable condition. All works must be carried out to an appropriate professional standard, with due consideration given to site conditions, public safety, drainage, accessibility and the long-term performance of the finished surfaces. The contractor will be responsible for ensuring that the construction methods and materials used are suitable for the intended use of each footpath. The Council is seeking a cost-effective and durable solution that provides improved pedestrian routes, meets the operational requirements of the site and offers good long-term value for money. Arrange for a site visit if required by contacting (George) gbrooker@swanleytowncouncil.gov.uk Apply by sending your quote to (Ryan) rhayman@swanleytowncouncil.gov.uk

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; heavy construction involving tunneling, boring, jacking, and micro tunneling; and finishing work including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Additional requirements encompass the supply of ready mix, precast concrete, and various utility materials, as well as adherence to Storm Water Pollution Prevention standards. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, with certifications required from approved agencies such as the SBA or MBDA prior to the bid opening. Responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and furnish bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Interested parties must be invited through the Building Connected electronic system, with the final bid deadline set for November 18, 2025. Primary coordination is managed by Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
SLED
ENG HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project
Solicitation # 2025-24/2025-28
The HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project (Project No. 2025-24/2025-28) is a public works solicitation issued by the County of Marin Department of Public Works. Located at the intersection of Irving Drive and Butterfield Road in unincorporated San Anselmo, California, the project scope includes the installation of two crosswalks, ADA-compliant concrete landings, Rectangular Rapid Flashing Beacons (RRFBs), and two bioretention basins. Additional work consists of minor grind and pave operations, traffic striping, and pavement markings. The engineer's estimate for the project is $550,000, with a required completion timeline of 35 working days. Bids must be submitted electronically via BidExpress by October 27, 2026. To be eligible, bidders must possess a valid Class A license and be registered with the Department of Industrial Relations (DIR) to perform public work. Submission requirements include a bid security of 10% of the base bid, a bidder's qualification statement, and various certifications, including compliance with CARB Off-Road Diesel-Fueled Fleets Regulations and federal debarment and suspension certifications. The contract award will be based on budget requirements and granted to the responsible and responsive bidder with the lowest total base bid. The project is governed by the 2025 Caltrans Standard Specifications (Divisions II through XII), the 2024 Green Book, and 2018 Marin Uniform Construction Standards. Contractors are required to provide a baseline schedule within 15 days of contract execution and maintain a comprehensive Quality Control program. Payment is processed monthly via payment requests submitted to the Engineer, with change order bills submitted through the Department's internet billing system. The contract also mandates strict adherence to prevailing wage rates per Labor Code Sec. 1720 et seq. and full compliance with ADA and Section 504 accessibility standards.
County of Marin

POSTED

2 days ago

DEADLINE

in 2 days
View Details
NAICS: 237310
New
SLED
RFB - REPAIR, REPLACEMENT, AND CONSTRUCTION OF SELECTED CONCRETE SIDEWALKS, CURBS, AND GUTTERS (FY24-25)
Solicitation # BPM013439
The County of San Diego Department of Public Works is soliciting bids for the repair, replacement, and construction of selected concrete sidewalks, curbs, and gutters for the FY24-25 period. The scope of work includes the installation of sidewalks, curb and gutter, cross gutters, driveways, and curb ramps, with specific project areas including Old Hwy 80 and Agua Dulce. All work must adhere to the 2015 Caltrans Standard Specifications and San Diego County Design Standards, specifically DS-21L for detectable warning surfaces. The contract requires strict compliance with the Americans with Disabilities Act of 1990, Buy America requirements, and state prevailing wage rates under Labor Code Section 1720. Proposals will be evaluated based on the total sum of all contract bid items, and the owner reserves the right to reject obviously unbalanced bids. Bidders must provide a bid security of ten percent of the bid amount via cash, certified check, or bidder's bond, while the successful awardee must furnish performance and payment bonds for one hundred percent of the contract value. Submission requires a complete original bid, including representations and certifications, a Small-Local Business Utilization Plan, and a noncollusion affidavit. The deadline for submission via the BuyNet portal or sealed envelope is December 03, 2026, at 2:00 PM local time. The contractor is required to appoint a quality control manager and must notify the Engineer of any noncompliance within 24 hours. Project management milestones include a preconstruction conference within 15 days of contract approval and the submission of a final as-built schedule within 30 days of completion. The solicitation emphasizes nondiscrimination and affirmative action, incorporating various federal regulations and executive orders, and provides specific preferences and certification paths for small, local, and disabled veteran business enterprises.
San Diego County

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS