Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Sweetbrier Deck Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sweetbrier Deck Replacement Project, managed by the California Department of Transportation (Caltrans) District 2, involves the replacement of the Sweetbrier Overcrossing bridge deck on Interstate 5 at post mile 61.75 in Shasta County. Funded through a combination of state and federal resources, the project aims to restore bridge health, preserve structural integrity, and ensure a safe, reliable structure for all modes of travel and goods movement. The necessity for this work stems from deterioration caused by traffic, tire chain wear, freeze/thaw cycles, and rebar corrosion from deicing salts, alongside non-compliant guardrails and eroded steel girder paint. The project has been determined to be categorically exempt under Section 15301 (Existing Facilities) Class 1, as it involves minor alterations to existing facilities with no significant environmental impact. The comprehensive scope of work includes demolishing and replacing the bridge deck, applying a one-inch polyester concrete overlay, and installing link slabs using Caltrans Engineered Cementitious Material. Additional improvements feature widening the north side shoulder, upgrading the bridge rail, replacing bearings and joint seals, and spot blasting and painting the bridge girders. Pavement work will involve cold planing and installing hot mix asphalt on both sides of the bridge, while safety enhancements include replacing metal beam guardrails with permanent crash cushions and updating signs, pavement markers, and delineators. The project also incorporates traffic management upgrades, such as the installation of a CCTV camera, controller walkway, and maintenance vehicle pullout. Construction is expected to be completed within a single season, requiring approximately 166 working days, with staging activities located southeast of the bridge and minimal ground disturbance estimated at 0.2 acres.

General Info

Caltrans District 2 will replace the Sweetbrier Overcrossing bridge deck in Shasta County.

Agency

California → Caltrans, District 2 - Redding

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Interstate 5 at PM 61.75, CA

Set-Aside

NONE

Documents

(1)

Sweetbrier Deck Replacement Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 2 - Redding
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 2 - Redding
Office AddressN/A
Contacts
Carolyn SullivanSenior Environmental Planner

Full Description

Show more
The California Department of Transportation, using state and federal funding, proposes to replace the Sweetbrier Overcrossing (OC) bridge deck on Interstate 5 at PM 61.75 in Shasta County. Purpose The purpose of the project is to improve the bridge deck, preserve the structural integrity of the bridge, extend the useful life, reduce future maintenance and capital needs, decrease worker exposure, and provide a safe and reliable structure for all modes of travel and goods movement. The project will restore bridge health to a good condition. Need At the Sweetbrier OC (06-0115), traffic, tire chain wear, freeze/thaw exposure, and rebar corrosion from the use of deicing salts have resulted in deterioration of the bridge deck, which overall has resulted in poor bridge health. Additionally, the guardrail approaching the bridge does not meet current design standards and the paint on the steel girders has eroded. Project implementation would include the following improvements: Bridge Deck • Demolish and replace bridge deck • Overlay new deck with one inch of polyester concrete • Install link slabs using Caltrans Engineered Cementitious Material Ultra-High Strength • Remove sidewalk and widen shoulder on north side of bridge • Upgrade existing bridge rail • Replace bearings and joint seals • Spot blast and paint bridge girders Pavement • Cold plane/install 0.2 feet of hot mix asphalt on either side of the bridge • Widen the bridge deck approach northeast of the bridge • Install shoulder backing Traffic Management Systems Install a closed-circuit television (CCTV) camera, controller walkway, maintenance vehicle pullout, and utility hookups immediately north of the bridge. Safety Elements • Replace existing metal beam guardrail with permanent crash cushions at bridge approaches. Signs and Delineation • Replace signs, pavement markers, and roadway delineators in accordance with current standards. Disposal/Borrow Sites No disposal or borrow sites are proposed. Project implementation would include approximately 0.2 acres of ground disturbance. The maximum excavation depth is estimated at 10 feet. Excess soil material and construction debris would become the property of the contractor. Staging Staging activities would occur southeast of the bridge. Utilities No utility conflicts are anticipated. Right-of-Way Caltrans would acquire an encroachment permit east of the bridge to accommodate pavement conformity. No permanent right-of-way take is anticipated. Schedule The work would be completed in one construction season and would require approximately 166 working days.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS