Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on March 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SWEETWATER AVENUE SEWER RELIEF DESIGN-BID-BUILD

Closed
WS90500317State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Phoenix is soliciting bids for the Sweetwater Avenue Sewer Relief project under a design-bid-build contract structure. The solicitation, identified as WS90500317, was posted on March 12, 2026, and requires all bid submissions to be delivered before 9:00 PM on April 7, 2026, to the Design and Construction Procurement Bid Box at Phoenix City Hall. The project is managed by the city's Design and Construction Procurement office, located at 200 W. Washington Street, Phoenix, AZ, with Heather Roye serving as the primary contracts specialist contact. This project focuses on sewer infrastructure improvements aimed at relieving existing conditions on Sweetwater Avenue in Arizona. An important update to the procurement process includes Addendum No. 1, which amends the original bidding and contract documents by incorporating necessary clarifications, technical specification changes, and revisions to plan sheets. Bidders must acknowledge receipt of this addendum in their proposals to ensure compliance with updated requirements. These modifications are intended to provide clearer guidance and address any issues prior to the submission deadline, ensuring the project proceeds with accurate and comprehensive contractor information.

General Info

City of Phoenix seeks bids for Sweetwater Avenue sewer relief project, bids due April 7, 2026.

Documents

4
DOC, High priority: read this first2 pages · amendment
High
PDF, High priority: read this first2 pages · cfb
High
PDF, High priority: read this first27 pages · contract-document
High
PDF, High priority: read this first194 pages · ifb
High

Read all 4 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 10 days
  • Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 20 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Design and Construction Procurement
Contacts1 person available
OfficePHOENIX, AZ, 85003, USA

Full Description

Show more
The City of Phoenix is seeking bids for Project Title . Bids are to be submitted into the Design and Construction Procurement Bid Box located on the first floor of Phoenix City Hall at 200 W. Washington Street, Phoenix, AZ 85003 before Response Submission Time on Response Submission Date .

More opportunities from Arizona → Design and Construction Procurement

Same awarding agency

NAICS: 237110
New
SLED
ARIZONA SCIENCE CENTER STORMWATER AND SEWER PIPE REPLACEMENT CONSTRUCTION MANAGER AT RISK SERVICES
Solicitation # PW26740069
The City of Phoenix is seeking a Construction Manager at Risk (CMAR) for the Arizona Science Center Stormwater and Sewer Pipe Replacement project, with an estimated construction cost of $8.2 million. The scope of work involves the replacement or approved remedy of all existing drain, waste, vent, and storm drainage systems to address aging infrastructure. The selected CMAR will provide preconstruction services, including detailed cost estimating and budget validation, and will be required to submit two Guaranteed Maximum Price (GMP) proposals in MAG or CSI format. Construction services include safety oversight, quality control, and a requirement for 24-hour, 7-day emergency response coverage with an on-site response time of two hours. Additionally, the project includes an add alternate for ADA upgrades, specifically adult changing stations. Interested firms must submit a Statement of Qualifications (SOQ) and a separate bonding statement from a surety company rated A- or better via the City's Procurement Portal by December 11, 2026. The SOQ is limited to 12 pages and must include an information sheet, an organization chart of key personnel, and evidence of at least three comparable CMAR projects. Evaluation is based on a 1,000-point scoring system and reference checks. The project emphasizes Small Business Enterprise (SBE) participation, requiring that eligible SBE subcontractors be located within Maricopa County and provide Letters of Intent. There is no set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 17 days
View Details
NAICS: 237110
New
SLED
SANITARY SEWER REHABILITATION PROGRAM JOB ORDER CONTRACT
Solicitation # JOC261
The City of Phoenix is seeking up to five qualified contractors for the Sanitary Sewer Rehabilitation Program Job Order Contract (JOC261). This on-call program focuses on the rehabilitation of sanitary sewer pipes, primarily those with diameters between 8 and 15 inches, using cured-in-place pipe (CIPP) lining, though it may also include manhole repair, PVC-liner repair, and occasional dig-and-replace operations. The contract has a duration of 36 months with a potential value of up to $30,000,000 per JOC, with options for renewal based on performance and funding. All work will be performed within the state of Arizona, and contractors must hold appropriate licenses from the Arizona Registrar of Contractors. Selection is based on a qualifications-based process using Statements of Qualifications (SOQs), with no formal interviews. Evaluation criteria include general firm information and performance reference checks, which are scored on a scale of 1 to 4. Submittals must be electronic PDFs submitted via the City's procurement portal by November 30, 2026, and must adhere to a 10-page limit. Required documentation includes an information sheet, a bonding capacity statement from a surety company rated A- or better, and the firm's current Experience Modification Rate (EMR). While the contract includes Small Business Enterprise (SBE) clauses and reporting requirements, the SBE goal for this specific project is set at 0.00%. There is no specified set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
SLED
ESTRELLA CIVIC SPACE BRANCH LIBRARY (GO BOND) AND ROAD IMPROVEMENTS CONSTRUCTION MANAGER AT RISK SERVICES
Solicitation # PA75200751 & LS71200119
The City of Phoenix is seeking a Construction Manager at Risk (CMAR) to provide preconstruction and construction services for the Estrella Civic Space Branch Library (GO Bond) and Road Improvements project. The scope of work involves the construction of a new 12,000 square foot branch library and significant street improvements at 99th Avenue and Lower Buckeye Road, including a new traffic light at 95th Avenue, bike lanes, and sidewalks. The estimated construction cost for the project is $9.7 million, and the CMAR will be responsible for delivering the project via a Guaranteed Maximum Price (GMP) contract submitted in MAG or CSI format. The selection process is qualifications-based, requiring the submission of a Statement of Qualifications (SOQ) by December 4, 2026, via the City's Procurement Portal. Applicants must be registered in the City's Vendor Management System and provide a bonding capacity statement from a surety company rated A- or better, along with their current Experience Modification Rate (EMR). The evaluation process includes a points-based SOQ review and subsequent interviews for finalists. Additionally, the project mandates strict Small Business Enterprise (SBE) utilization requirements, where certified firms must perform at least 75% of their contract cost with their own workforce to be considered as performing a Commercially Useful Function.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 10 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS