Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Special Notice opportunity from Department Of State was posted on February 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Q&A for Swimming Pool Cover for an Official Residence (Shenandoah)

Closed
19SA7024Q0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of State → Embassy Riyadh

NAICS

23812

Place of Performance

Riyadh, DC, SAU

Set-Aside

NONE

Documents

1
PDF, Low priorityq-and-a
Low

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Notice type changed from Solicitation to Special Notice. The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of State → Embassy Riyadh
Contacts2 people available
OfficeWASHINGTON, DC, 20520, USA
Organization / Agency
Department Of State → Embassy Riyadh
Office AddressWASHINGTON, DC, 20520, USA

Full Description

Show more
QUESTIONS AND ANSWERS (Q&A) SOLICITATION # 19SA7024Q0011 (Shanandoah CMR Swimming Pool Cover) Q1: General specification on page 10 states that all metal steel structure and trusses must be powder coated in black. But these elements will be located below the top checkered plate and will not be visible. Please confirm if this black powder coating is really required? A1: Yes, it is required. Q2: General specification on page 10 states to provide 10mm thick heavy duty rubber insulators to be attached to the steel plates for all the steel structures which are in contact with the pool. Such rubber insulators will increase the thickness below the top cover plate which will rest on the perimeter wall of the pool causing trip hazard. Kindly confirm if these rubber insulators are mandatory requirement? A2: Yes. Q3: General specification on page 09 states that the top cover must be checkered plate aluminum with minimum thickness of 5mm powder coated with the same color of the floor surrounding the pool. But during site visit, we understood that the entire assembly of supporting structure and top cover must be stainless steel. Kindly confirm. A3: The top cover may be constructed from either aluminum or stainless steel with a minimum thickness of 5mm powder coated. Q4: Please confirm if we need to submit structural design calculation from a structural engineer for approval to show that our proposed structure can carry concentrated load of 100 kg / sqm? A4: Initial designs should be included in the submission documents as they are one of the criteria used in the technical evaluation process. Once the contract is awarded, the final designs and load calculations must be submitted for approval before commencing fabrication. Q5: Section 3 - Solicitation Provisions under point A.2 (2) states - Evidence that the offeror/quoter operates an established business with a permanent address and telephone listing in Saudi Arabia or plans to establish an office within 30 days of contract award. Kindly note that our company is established in Bahrain, and we will use Bahraini or Saudi based subcontractor to accomplish this task order. Kindly confirm. A5: All offerors can use a subcontractor(s). Q6: Section 3- Solicitation Provisions under point A.2 (6) states - The offeror shall address its plan to obtain all licenses and permits required by local law (see DOSAR 652.242-73 in Section 2). If offeror already possesses the locally required licenses and permits, a copy shall be provided. Kindly let us know if there are any specific licenses and permits which will be required to perform the scope under this project? A6: Please refer to Section 3, Solicitation Provisions, A.2(2).

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS