Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on November 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SWITCH ASSEMBLY, TOUCH TAPE - REF 2095936

Awarded
2095936State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Dallas Area Rapid Transit has issued solicitation number 2095936 for the procurement of Switch Assembly, Touch Tape (Ref 2095936). The solicitation was posted on November 20, 2025, with a response deadline of November 25, 2025. The scope of work requires the supplier to provide goods that conform to all referenced drawings and technical specifications, ensuring they are of merchantable quality and suitable for their intended use. Performance and delivery are expected within Texas, specifically serving the Dallas area. The agreement is governed by the Authority's Purchase Order Terms and Conditions, which mandate that inspection and acceptance occur at the destination. The seller is responsible for verifying conformity with specifications and providing favorable commercial warranties. Key administrative requirements include submitting invoices in triplicate for payment within 30 days and adhering to strict certifications regarding the non-boycott of Israel and no association with foreign terrorist organizations. Additionally, the seller must acknowledge that the Authority is exempt from Texas state and local sales taxes. The Contracting Officer retains the authority to modify the contract, and any subcontracting or assignment of the agreement requires prior written consent.

General Info

Contract Value

$95.4

NAICS

N/A

Place of Performance

TX, USA

Set-Aside

NONE

Award Issued Date

Documents

1
PDF, High priority: read this first4 pages · contract-document
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Dallas Area Rapid Transit
ContactsNo contacts available
OfficeTX, USA
Office AddressTX, USA
ContactsNo contact information available

Full Description

Show more
SWITCH ASSEMBLY, TOUCH TAPE - REF 2095936

More opportunities from Texas → Dallas Area Rapid Transit

Same awarding agency

NAICS: 541330
SLED
Trinity Railway Express (TRE) 2MT IH-35E Design
Solicitation # P-2096182
Dallas Area Rapid Transit is soliciting professional engineering design services for the Trinity Railway Express Second Main Track project in Dallas, Texas. The scope of work involves preparing construction documents for 1.95 miles of double track from I-35E to the Mockingbird Lane grade separation. Key technical requirements include the replacement of the DART Rail Bridge at I-35E and SH 183 Lower Stemmons, the relocation of the historic Tresse Bridge, and the construction of new bridges over Inwood Boulevard and the Knights Branch and Noble Branch stream crossings. The design must adhere to a 18.5 foot vertical clearance requirement for the I-35E freight corridor and accommodate design speeds of 60 mph for freight and 79 mph for passenger rail. The project integrates with the Harry Hines Boulevard Transportation Master Plan, requiring the evaluation of multiple intersection layout alternatives to improve connectivity, accessibility, and safety for multimodal users. Deliverables include detailed design schematics, conceptual phasing plans, and technical specifications for steel and concrete materials. The winning bidder must sign a confidentiality agreement and ensure all personnel complete specialized training on new bridge design and construction methods. Coordination with the Texas Department of Transportation Dallas District is required to manage traffic control and track alignment shifts during the phased construction process.
Engineering Services

POSTED

21 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS