Switchgear & Transformer Maintenance

Closed
2109388State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 10 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract involves providing preventative maintenance and testing services for electrical switchgear and transformers at the Highland Residential Facility in Highland, NY. The scope includes servicing six vertical sections of switchgear, five VCP-W breaker cells, four VCP-W breakers, two relays, nine pad-mount transformers, and an optional spare breaker. The work requires four mobilizations, with all tasks to adhere to manufacturer standards and safety protocols, including supervision by a licensed NYS Professional Electrical Engineer. The contractor will supply skilled personnel, tools, and test equipment, ensuring safety measures such as lockouts, grounding, and proper identification of circuits. The project must be completed by August 31, 2024, with scheduling coordinated between the facility and the contractor. Pricing details are based on performing work during regular weekday hours, with additional charges applicable for work outside these hours, overtime, or unforeseen delays. The contractor is responsible for minor repairs and deficiencies, while major repairs or additional material costs require prior approval. Testing will follow standard manufacturer guidelines, and all personnel must meet OSHA and NFPA safety standards, including PPE requirements. The customer is responsible for providing access, equipment availability, outage coordination, and necessary electrical plans. The contract emphasizes MWBE participation goals and specifies that the work is a one-time service, with the response deadline set for May 17, 2024.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → NYS Office of Children & Family Services
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Phil IngramChildren & Family Service Specialist 3

Full Description

Show more
1.    PROJECT SUMMARY Provide a proposal to perform preventative maintenance and testing on the equipment outlined below at the Highland Residential Facility as noted herein. 2.    EQUIPMENT BILL OF MATERIAL AS MANUFACTORED BY EATON CORPORATION Switchgear in IPA (6) Vertical Sections (5) VCP-W Breaker Cells (4) VCP-W Breakers (4) SEL-751A Relays (1) SEL-700G Relay CPT and PTs   Pad-mount Transformers (9) Transformers,   Optional Spare VCP-W Breaker (1) 150VCP-W25-1200A Breaker 48VDC Motor, Close, and Trip ROF Wheel Kit 3.    SCOPE OF WORK Provide the necessary field service personnel, tools, materials, and approved test equipment to perform the scope of work as described herein. Perform preventative maintenance and testing on the equipment outlined above per manufacture standards and preventive maintenance guidelines. It is expected that a total of (4) mobilizations will be required to complete this work.   A comprehensive engineering report including findings, test data, and recommendations must be furnished to OCFS Bureau of Capital Facilities and Services within 10 business days completion of work. 4.    PRICING Price for the above scope of work regarding the maintenance of switchgears outlined above is $ based on performing site work on a weekday-day shift, during regular working hours 7am-4 pm Monday – Friday.   Price for the above scope of work for the maintenance of the (9) transformers outlined above is $ based on performing site work on a weekday-day turn. If the work cannot be performed during regular working hours 7am-4 pm Monday – Friday.   Optional add price to provide a spare 1200A VCP-W circuit breaker is $ .    5.    DELIVERY This entire scope of work is requested to be completed by August 31, 2024 or sooner. The scheduling of work will be mutually agreed upon between OCFS Highland Facility and the successful Contractor’s Electrical Engineer of record.   Lead time of the new VCP-W circuit breaker is anticipated to be weeks after award. 6.    QUALIFICATIONS / CLARIFICATIONS All work to be completed at straight time, Monday through Friday, 6am-5pm. Eaton has not included any training for the first workday. Minor repairs and adjustments taking a minimal amount of time will be included in our base price. If additional time or material is required, it will be charged as an extra.  Any significant delays due to adverse weather will result in additional charges. If straight time work is required to be performed on an overtime basis, Customer will be billed the difference between the straight time and overtime rate. Stand-by power needs, if deemed necessary, are not included. Applicable fees for outage related costs including stand-by and re-connect services are not included. Eaton will correct minor deficiencies. Minor deficiencies are those that require no special tools, parts, etc. and take a minimal amount of time to perform.  Repair labor beyond this, and all material, will be considered as extra. Method of procedure (MOP) development or meeting time not outlined in the scope of work will be treated as an extra. Replacement parts and additional labor required to perform any repairs necessary for proper operation of your equipment will be accomplished exclusively at your written direction and authorization. 7.    TESTING CLARIFICATIONS: All testing will be performed under manufacture’s standard testing guidelines unless otherwise specified. 8.    NOTE: All work shall be supervised/certified by a licensed NYS Professional Electrical Engineer.   9.    SAFETY TRAINING OF FIELD PERSONNEL: All field personnel training must be current and comply with OSHA CFR1910 Electrical Safety Standard, which sets minimum safety rules and practices for the design, operation, and maintenance of high-voltage systems (over 600 volts). Safety standards must be in place to meet or exceed NFPA 70E requirements; and shall utilize appropriate Personal Protective Equipment (PPE).  10.  DIVISION OF RESPONSIBILITY Contractor Responsibilities: Contractor will perform necessary adjustments, which are required to bring equipment to satisfactory operating condition, or review these with you prior to commencement of any additional work. Contractor shall furnish test engineers, field technicians, support personnel, tools, equipment, materials, supplies and transportation as required. Contractor will provide and install safety locks, as required, and in accordance with the facility safety guidelines. Contractor will perform voltage test and install necessary circuit / equipment safety grounds to assure safe working conditions. Contractor to ensure that all circuits to be de-energized have been clearly identified and that all plant personnel and downstream operations are aware of the required outage date, time and duration. This includes maintaining power to vital or necessary plant equipment and processes during the performance of this scope of work. Supply a suitable and stable source of power for operation of test equipment. Provide and service as required any temporary power generation equipment as needed by this scope and testing throughout duration of this proposal’s scope. Upon completion of work: Contractor will remove safety grounds installed by Contractor will remove safety locks installed by Contractor.   Customer Will Be Responsible for The Following:  Providing free access to equipment within their facility. Ensuring that all equipment is available upon arrival of Contractor personnel, including removal from service to permit continuous progression of work. Identifying site contact for this project. Coordinating all outages and perform all switching to de-energize and isolate equipment to be serviced. Supplying the current electrical plans, including the plant single-line diagram and specifications. Providing a place to receive and unload replacement equipment, test equipment or other supplies. . Service-Disabled Veteran-Owned Set Aside: No Total MWBE Participation Goals: 30% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Due date:05/17/2024 12:00 PM Contract term: One Time Service County(ies): Ulster Location: Highland Residential Center, 629 North Chodikee Lake Road, Highland, NY 12528 Business entities awarded an identical or substantially similar procurement contract within the past five years: None

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS