Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Massachusetts was posted on July 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sword Street Force Main Rehabilitation

Closed
BD-25-1242-ARN02-ARN02-130896State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 13 hours ago

DEADLINE

in 29 days
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 13 hours ago

DEADLINE

in about 19 hours
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 13 hours ago

DEADLINE

in 7 days

General Info

Agency

Massachusetts → ARN02 - Sewer DivisionView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Millbury Street Auburn, MA, 01501, USA

Set-Aside

NONE

Documents

(13)

BD-25-1242-ARN02-ARN02-130896: Sword Street Force Main Rehabilitation

HTML3 pagesitb

BD-25-1242-ARN02-ARN02-130896: Sword Street Force Main Rehabilitation

HTML3 pagesitb

BD-25-1242-ARN02-ARN02-130896: Sword Street Force Main Rehabilitation

HTML3 pagesitb

BD-25-1242-ARN02-ARN02-130896: Sword Street Force Main Rehabilitation

HTML3 pagesitb

BD-25-1242-ARN02-ARN02-130896: Sword Street Force Main Rehabilitation

HTML3 pagesitb

BD-25-1242-ARN02-ARN02-130896: Sword Street Force Main Rehabilitation

HTML3 pagesitb

BD-25-1242-ARN02-ARN02-130896: Sword Street Force Main Rehabilitation

HTML3 pagesitb

BD-25-1242-ARN02-ARN02-130896: Sword Street Force Main Rehabilitation

HTML3 pagesitb

BD-25-1242-ARN02-ARN02-130896: Sword Street Force Main Rehabilitation

HTML3 pagesitb

Invitation to Bid - Sword Street Force Main Rehabilitation

PDFitb

BD-25-1242-ARN02-ARN02-130896: Sword Street Force Main Rehabilitation

HTML3 pagesitb

BD-25-1242-ARN02-ARN02-130896: Sword Street Force Main Rehabilitation

HTML3 pagesitb

BD-25-1242-ARN02-ARN02-130896: Sword Street Force Main Rehabilitation

HTML3 pagesitb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → ARN02 - Sewer Division
Contacts1 person available
OfficeMillbury Street Auburn, MA, 01501, USA
Organization / Agency
Massachusetts → ARN02 - Sewer Division
View Agency Profile
Office AddressMillbury Street Auburn, MA, 01501, USA
Contacts
Administrator SystemPurchaser

Full Description

Show more
The Work under this Contract includes, but is not necessarily limited to, cleaning, CCTV inspection, system bypass setup and break-down, rehabilitation of approximately 2,700 linear feet of 16-inch sewer ductile iron (Class 52) force main, rehabilitation of 1 blowoff structure, replacement of 1 air release structure, installation of 2 permanent bypass pumping locations. All proposed work is suggested to be sequenced as described in the Contract Drawings.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS