This Solicitation opportunity from Washington was posted on September 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SWR - Stimson Crossing Switching Station Site Improvements

Closed
26-1711-KPState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Snohomish County PUD is soliciting proposals under solicitation number 26-1711-KP for site improvements at the Stimson Crossing Switching Station located in Marysville, Washington. With an engineer's estimate of 89,200.00 dollars, the project scope encompasses comprehensive site construction including the demolition and removal of reinforced concrete foundations, earthwork, site preparation, cast-in-place concrete drilled pier foundations, substation rock resurfacing, and site disturbance restoration. Work is scheduled to take place between October and November 2026. Bidders must be currently listed on the District's Small Works Roster under the Substation General Site Construction category to be eligible. Because the switching station will remain energized during construction, strict safety protocols are in place. All contractor and subcontractor personnel are required to undergo hazard recognition training provided by the District and attend documented tailgate meetings. In compliance with WAC 296-45-475 part 6, the District will provide a qualified employee to serve as a Safety Watch. Technical requirements are governed by Specification No. 2480 and specific project drawings, with Addendum No. 1 providing critical revisions to anchor bolt lengths for specific foundations. All inquiries must be submitted via email to [email hidden], as other forms of communication will not be guaranteed a response.

General Info

Snohomish County PUD site improvements at Stimson Crossing, Marysville, estimated at 89,200 dollars.

Place of Performance

WA, USA

Set-Aside

NONE

Documents

6

RFP 26-1711-KP Addendum No. 1 - SWR Stimson Crossing Switching Station

PDF, High priority: read this firstamendment
High

RFP 26-1711-KP: Stimson Crossing Switching Station Site Improvements

PDF, High priority: read this firstrfp
High

RFP 26-1711-KP - SWR Stimson Crossing Switching Station Site Improvements Supplementary Conditions

PDF, High priority: read this firstspecifications
High

Specification No. 2480 - Substation Construction

PDF, High priority: read this firstspecifications
High

Stimson Crossing Switching Station Geotechnical Engineering Report

PDF, High priority: read this firstspecifications
High

Stimson Crossing Switching Station Site Improvements Drawings

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Snohomish County PUD
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Engineer's Estimate: $89,200.00 Project Description: This contract work consists of providing all labor, materials, equipment, supplies and supervision to construct site improvements to an existing electrical transmission switching station located at 3132 148th ST NE, Marysville, WA, 98271, in Snohomish County, Washington. Site construction includes but is not limited to demolition and removal of reinforced concrete foundations, temporary erosion and sedimentation controls; site preparation; earthwork; removal of surplus and unsuitable soil; cast-in-place concrete drilled pier foundations; substation rock resurfacing within the work area; and site disturbance restoration. The switching station will remain energized during construction; however, the District will provide a qualified employee to serve as a Safety Watch in the switching station as defined by WAC 296-45-475 part 6 – Substation Entry. All Contractor and Subcontractor personnel must have hazard recognition training and attend a documented tailgate meeting prior to entering the switching station. The District will provide the hazard recognition training prior to the start of construction. in Snohomish County, Washington. Contractors must be currently on the District’s Small Works Roster category “Substation General Site Construction” prior to bidding. All requests for clarification or additional information regarding this RFP must be submitted to the District via e-mail to contact@example.gov. The District will not guarantee responses to questions received via other forms of communication (phone, voicemail, text, IM, etc.). Do not submit questions via Public Purchase.

More opportunities from Washington → Snohomish County PUD

Same awarding agency

NAICS: 541614
SLED
Supply Chain Management Consulting
Solicitation # 26-1644-SR
Public Utility District No. 1 of Snohomish County is seeking qualified consultants through RFQ 26-1644-SR to establish a roster of experts for supply chain management consulting. The primary objective is to analyze the District's supply chain across multiple domains, including demand and supply planning, sourcing, contracting, logistics, inventory management, and risk and compliance. Selected consultants will assess current maturity levels, identify gaps against industry best practices and regulatory standards such as NERC CIP, FERC, and NIST, and provide prioritized remediation roadmaps. The scope specifically emphasizes experience with SAP MRP operations and a preference for consultants with a history of working with comparable electric, water, or generation utilities. The selection process is based on best evaluated qualifications, utilizing a three-stage evaluation that includes pass/fail gates for completeness and responsiveness. Key evaluation factors include the ability to meet requirements, professional expertise, and the quality of the response. The contract structure allows for varying engagement terms and on-call services, with work performed within the District's service area in Snohomish County and Camano Island, Washington. Consultants must meet stringent insurance requirements, including professional liability and workers' compensation, and adhere to strict confidentiality and non-disclosure agreements regarding critical energy infrastructure information. Submissions are accepted electronically through December 31, 2026.
Process, Physical Distribution, and Logistics Consulting Services

POSTED

8 months ago

DEADLINE

in 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS