Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on April 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sycamore Trail Extension (Phase III) Construction

Closed
26-035-ITBState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering site preparation, utilities, paving, and electrical systems, including specialized tasks such as asbestos abatement, micro-tunneling, directional drilling, and the installation of various piping materials. The project is partially funded by multiple grants from the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating strict adherence to DBE program requirements and the California Labor Code. Bidders must hold a valid California Contractor's license and provide acceptable insurance, with some subcontractors potentially required to provide bonding for 100 percent of their contract value. The project is subject to a Project Labor Agreement and prevailing wage rates, requiring firms performing onsite work to be signatory to collective bargaining agreements with specific trades including carpenters, laborers, and operating engineers. Interested firms must be certified through the Department of General Services and the Port of Long Beach PlanetBids portal. Invitations to bid and project specifications are managed electronically through the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The Sycamore Trail Extension (Phase III) Construction project aims to advance the development of a key non-motorized transportation corridor in West Sacramento by extending the existing active transportation network. This phase focuses on transforming a currently underutilized sewer right-of-way into a 2,900-foot Class I trail with park-like amenities, addressing the city’s barriers such as the UPRR railway, Highway 50, and the Deep Water Ship Channel. The project will improve safety and connectivity for pedestrians and cyclists of all ages, linking significant community assets including schools, parks, senior and low-income housing, and commercial areas. This solicitation is issued by the Capital Projects - Engineering agency of California, with a response deadline of May 15, 2026. Construction work includes trail building with lighting, utility adjustments, sidewalk and curb ramp upgrades, and the installation of signage and striping along the corridor from Westmore Oaks School to Park Blvd at Stone Blvd. The project builds on the completion of the first two phases and is a critical segment for the trail’s full development, reflecting extensive community input and prioritization to promote safer, more accessible active transportation options throughout West Sacramento. Contact points for the project are an Assistant Civil Engineer and a Financial Specialist provided for further inquiries.

General Info

Extend 2,900-foot non-motorized trail in West Sacramento with safety, lighting, and accessibility upgrades.

Agency

California → Capital Projects - EngineeringView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(12)

Sycamore Trail Phase II & III Categorical Exclusion Determination

PDFcategorical-exclusion

26-035-ITB Sycamore Trail Extension Phase III Construction

PDFitb

26-035-ITB Sycamore Trail Extension Phase III Construction

PDFitb

Sycamore_Trail_Extension_Phase_III_-_Final_Plans.pdf

PDF

Sycamore_Trail_Ph_II_&_III_-_NOD_(CEQA).pdf

PDF

Insurance Checklist for City of West Sacramento Contracts

PDFinsurance-checklist

Sycamore_Trail_Ph_II_&_III_-_MMRP_(1).pdf

PDF

City_of_West_Sacramento_QAP_2025_Executed_(1).pdf

PDF

Sycamore_Trail_Extension_Phase_III_-_Construction_Bid_Packet.pdf

PDF

Contract for Services - West Sacramento Federal Boilerplate RFP 5.1.24

DOCX23 pagescontract-document

FHWA-1273 Federal Aid Construction Contract Provisions Oct 2023

DOCX14 pagescontract-provisions

Construction Contract and Payment Bond - City of West Sacramento

DOCXcontract-document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Capital Projects - Engineering
Contacts2 people available
OfficeWest Sacramento, CA, 95691, USA
Organization / Agency
California → Capital Projects - Engineering
View Agency Profile
Office AddressWest Sacramento, CA, 95691, USA
Contacts
Kevin TanAssistant Civil Engineer
Allison WebsterFinancial Specialist

Interested Companies (36)

Show more
Psomas
Tacoma, WA
Creekside Commercial Builders
McClellan Park, CA

See All 36 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This Sycamore Trail is a 5-phase project that is intended to transform the City's existing active transportation network by creating a true spine for non-motorized users to have safe, and convenient access throughout the City. The Sycamore Trail was identified as a top priority by the City through over a decade of outreach with the community, driven primarily by parents and residents who desire to walk and bike more, but who are deterred by existing high stress routes. West Sacramento has many existing barriers to active transportation, including the bisecting UPRR railway, US Highway 50, and Deep Water Ship Channel. The Sycamore Trail Extension project will make progress toward overcoming these barriers by transforming a currently disused, blighted sewer right-of-way into a seamless Class 1 connection with park-like amenities for users of all ages and abilities, and will provide important connections between Westfield Village and Westmore Oaks Elementary schools, multiple existing and planned Park sites, Senior and Low-Income housing developments, and nearby shops and restaurants. With Phase 1 and Phase 2 already complete, the proposed Phase 3 extension project is a critical segment to catalyze the remaining trail build out. The Project location will utilize the Lower Northwest Interceptor (LWNI) sewer easement from the Westmore Oaks School site (1110 Clarendon Street) to Park Blvd at Stone Blvd. Project improvements include but not limited to constructing 2,900 feet of Class I Trail with lighting, lowering utilities, sidewalk and curb ramp improvements, signage and striping.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS