Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Sylvan Lake Regional Water/Wastewater Commission - Request for Proposal - PROJECT MANAGEMENT SERVICES: REGIONAL WASTEWATER LINE EXTENSION AND LIFT STATIONS

Active
AB-2026-05935International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sylvan Lake Regional Water/Wastewater Commission is seeking project management services for the construction of the Stage 5 wastewater line and associated lift stations. This project aims to connect the Town of Eckville, Lacombe County, and the Summer Village of Half Moon Bay to the regional network that transports wastewater to the City of Red Deer Wastewater Treatment Plant. The initiative is heavily supported by the Province of Alberta through a Water for Life grant, which covers 90 percent of the project costs. The project manager will be responsible for overseeing the construction and coordinating with member municipalities that are building internal systems to connect to the regional line. Successful proponents must provide proof of Workers Compensation Board coverage and a letter confirming no outstanding debts. Additionally, the contractor is required to maintain Professional Liability Insurance for Errors and Omissions of at least 5 million dollars per occurrence, with a minimum three year tail for claims asserted after policy expiration. The Commission must be named as an additional insured on the policy. Responses for this solicitation are due by September 14, 2026.

General Info

Project management for Stage 5 wastewater line construction, due September 14, 2026.

Agency

Sylvan Lake Regional Water/Wastewater CommissionView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

AB, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencySylvan Lake Regional Water/Wastewater Commission
Contacts1 person available
OfficeN/A
Organization / Agency
Sylvan Lake Regional Water/Wastewater Commission
View Agency Profile
Office AddressN/A
Contacts
Michael MinchinCommission Manager

Full Description

Show more
The Sylvan Lake Regional Water/Wastewater Commission is a regional services commission established in accordance with the Municipal Government Act and the Sylvan Lake Regional Wastewater Commission Regulation AR 53/2008(Repealed). The Commission was established in 2008 to transport wastewater from its member municipalities to treatment facilities at the City of Red Deer Wastewater Treatment Plant via a network of transmission lines connecting to several member municipalities. The current member municipalities include nine municipalities: Town of Sylvan Lake, Lacombe County, Red Deer County, Summer Village of Birchcliff, Summer Village of Half Moon Bay, Summer Village of Jarvis Bay, Summer Village of Norglenwold, Summer Village of Sunbreaker Cove, and the Town of Eckville. Over the past 18 years, the Commission has been expanding the system to connect all of its members. The last project was in 2021 when the Summer Village of Sunbreaker Cove was connected to the system. As part of its business plan review in 2025, the Commission conducted a review of a future connection (herein referred to as the Stage 5 line) to the Summer Village of Half Moon Bay, Lacombe County and new member, the Town of Eckville. This review resulted in a revised design and alignment that would connect all of these members. A copy of this study is referenced Appendix “B”. In November of 2025, the Commission submitted a Water for Life grant application to the Province of Alberta to fund construction of this wastewater line and related lift stations. In July of this year, the Province awarded the Commission a Water for Life Grant to complete this work. This grant, along with a previous announcement in 2023 would see the Province fund 90% of this project. In addition to the construction of the Stage 5-line, two member municipalities will be constructing internal systems to connect to the regional line. Coordination with the Summer Village of Half Moon Bay and Lacombe County will be an expectation of the project manager.
The Proponent shall provide certified copies of Professional Liability Insurance - Errors and Omissions coverage in an amount not less than $5,000,000 on a ‘per-occurrence’ basis. The policy shall provide coverage of all claims occurring during the term of the policy notwithstanding the fact that the claim may be asserted subsequent to the expiration of the policy for a minimum of three (3) years. The Proponent will add the Commission as an additional insured to their insurance policy. The Proponent shall at all relevant times carry Workers Compensation Board coverage of either of Alberta or of another AWCBC board that will extend the required amount of coverage to cover the employee outside of their home province. Proponents shall submit their WCB number together with a letter from the appropriate department indicating there are no outstanding fees, fines, claims, or debts due on the Successful Proponent’s account to the Commission prior to the commencement of the work.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. Filanc is soliciting quotes for a wide range of scopes, including pipeline infrastructure such as pipe, valves, welding, cathodic protection, and jack and bore operations; site work including paving, striping, flatwork, precast vaults, fencing, and potholing; and technical services such as surveying, videography, testing, inspections, settlement monitoring, and E&IC. Additional requirements include SWPPP implementation, traffic control and plans, and asbestos pipe demolition and removal. Bids are due by 2:00 PM on September 18, 2026. The solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, and VOSB, and strongly encourages participation from SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, and equipment if necessary. Interested parties can obtain plans and specifications at no cost by contacting Julia Masaitis. The project falls under NAICS code 237110 and emphasizes a strict commitment to equal opportunity and non-discrimination.
Filanc

POSTED

about 16 hours ago

DEADLINE

in 19 days
View Details