Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Synopsis for the Ground-Based Midcourse Defense (GMD) Sole Source Core Completion Contracts

Active
HQ0147-08-R-0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Missile Defense Agency plans to award a sole source contract to The Boeing Company for the Ground-Based Midcourse Defense (GMD) Core Completion Contract, covering the continuation and completion of critical GMD system development efforts through fiscal year 2013. This contract consolidates four main work areas: the transfer of ongoing activities from an existing contract, development and integration of Block 4 hardware and software, support for the European Interceptor Site integration, and completion of core weapon system activities essential to achieving required operational capabilities. Due to the specialized nature of the project and Boeing’s status as the incumbent prime contractor with unique technical expertise, the agency has determined that competition would present unacceptable risks, schedule delays, and duplicative costs. The contract encompasses a wide range of tasks including refurbishment of interceptors, improvements to hardware and software, enhancements at key missile defense facilities, and support to other system elements like radar upgrades and ballistic missile defense system testing. An extensive risk analysis highlighted multiple technical and logistical challenges that Boeing’s established knowledge base and experience uniquely mitigate. While the government is open to receiving capability statements from other parties, it currently intends to negotiate directly with Boeing under sole source authority to avoid disruptions in program timelines and maintain continuity of critical defense capabilities. The contract is anticipated to be a Cost Plus Award Fee type with performance from mid-2009 through late 2013, and this sole source action does not preclude future competitive procurements for other tasks within the GMD program.

General Info

Sole source contract awarded to Boeing for GMD system completion through 2013, ensuring continuity.

NAICS

541712 - Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)

Place of Performance

AL

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhasePresolicitation
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The response deadline was removed. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice title changed. The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Missile Defense Agency (mda)
Contacts2 people available
OfficeHUNTSVILLE, AL, 35898, USA
Office AddressHUNTSVILLE, AL, 35898, USA
Contacts
Chanda TallmanContract Specialist
John T PenleyContract Specialist

Full Description

Show more
As previously stated in the synopses posted March 21, 2008 and June 2, 2008, in regard to solicitation HQ0147-08-R-0001, the Missile Defense Agency intends to negotiate on a sole source basis with The Boeing Company a Ground Based Mid Course Defense System (GMD) Core Completion Development Contract (CCC). The original Justification and Approval dated May 27, 2008, defined the specific requirements that make up the CCC. An amended Justification and Approval is in process that adds the additional effort which the Government intends to negotiate on a sole source basis with The Boeing Company. The amended Justification and Approval also authorizes GMD Operation and Sustainment (O&S) requirements to be acquired under a separate contractual vehicle from the Core Completion Development Contract. The amended J&A will provide more specific details associated with each of the following requirements: -GMD Weapon System Operations and Sustainment (O&S) requirements to be awarded in a separate contract vehicle from the CCC Development requirements -GMD Weapon System O&S revised to include an option for CY 10 -Period of performance extension of Block 4 Hardware/Software development requirements from FY 09 to FY 13 -Period of performance extension of Ground-Based Interceptor (GBI) Refurbishment requirements from FY09 to FY13 -Ballistic Missile Defense System (BMDS) Testing Support revised to a FY 09 Basic effort with a 1 yr Option Period for FY 10 -Vandenberg Air Force Base (VAFB) and Fort Greely, Alaska (FGA) missile defense facility enhancements revised to include an option for CY10 -Period of performance extension for Ground Systems Block 3 Development requirements from FY09 to FY 13 -Period of performance extension for Modeling and Simulation upgrades from FY09 to FY13 -Addition of CY 09 development requirements for the Upgraded Early Warning Radar (UEWR) effort -Addition of FY 09 (Basic) and FY10 (Option) development requirements for the Sea Based X-Band Radar (SBX) In accordance with FAR 6.305, requests for the Justification and Approval for Other Than Full and Open Competition (J&A) may be sent to Ms. Renee Sprague at renee.sprague.ctr@mda.mil. If your request includes a request for the amended J&A, a copy will be provided upon approval and signature by the MDA Director. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ The purpose of this amendment is to provide further clarification relative to the - GMD Core Completion Contract (GMD CCC) for the Ground-Based Midcourse Defense Program, published March 21, 2008. This information is provided in response to comments/questions received in response to the original synopsis and describes the intended CCC requirements in additional detail. The new GMD CCC consists of four major work content elements as follows: (1) Transitioned Efforts from the Existing Contract; (2) Block 4 Hardware and Software; (3) European Interceptor Site (EIS) Integration Support by GMD; and (4) the Critical Core Weapon System Completion Activities. The first two elements were part of the overall GMD system requirements authorized for noncompetitive acquisition from Boeing by a previous Justification and Approval (J&A), signed by the Director, MDA, in 2000. The third element was described as a collateral supporting requirement to the separate EIS contract in the EIS J&A, signed by the MDA Director in 2007. The third element will provide essential support from the GMD system contract to the EIS contract to assure a fully integrated operational interceptor site in Europe. Further detail of this work is described below: (a) Transfer of Activity Currently Contracted under HQ0006-01-C-0001: This contract is for an extremely complex, major system that was awarded in 2001. Since that time significant work added to the contract has made the contract itself too complex to administer effectively. Affordability issues have also resulted in significant perturbations to technical content and schedule. As a result there have been numerous contract restructures which have precluded timely completion of the program. The intent is to complete the residual work remaining on this contract under a new contract structured to allow more favorable terms and conditions and more effective administration. All work content extending beyond December 31, 2008, will be transferred to the GMD Core Completion Contract. This work content is currently under contract to Boeing and was approved for noncompetitive acquisition by Lieutenant General Ronald T. Kadish, Director, Missile Defense Agency on February 4, 2000. (b) Block 4 Hardware and Software: The overall Ballistic Missile Defense System (BMDS) is being acquired under a spiral development methodology. Individual spirals are identified as blocks within a sequential block structure, ultimately leading to completion of the BMDS. This element includes Block 4 hardware, software, and related system engineering and integration activities. Currently Block 4 represents the last major GMD system development spiral. This block is intended to provide the necessary hardware and software to enable European Capability. Block 4 includes additional, improved versions of assets previously procured under the current GMD system contract with Boeing. Design and development of Block 4 improvements are being performed under the current GMD System prime contract with Boeing. The intent will be to procure enough hardware/software and related system engineering and integration to support and deliver ten (10) additional Ground Based Interceptors (extends through FY13), silos and related flight and ground test assets. Hardware/software for FY09 includes Launch Site Components (LSC) and Command Launch Equipment (CLE) hardware and related software, launch equipment and related Peculiar Support Equipment (PSE), Re-locatable In-Flight Interceptor Communications System (IFICS) Data Terminal and tactical/non-tactical communications capability (extends through FY10). This additional hardware/software will complete the currently-planned GMD production with a total of 54 operational interceptors at all sites. It is noted that up to 100 interceptors were authorized by the J&A of January 2000. (c) European Interceptor Site: This element includes GMD system development and site activation engineering and integration activities in support of the European Interceptor Site requirement. This element will provide for the integration of all Government furnished equipment (GFE) and contractor furnished equipment (CFE). It includes design, development, and installation of the hardware and software to support the European Missile complex; ensure facility-GBI launch equipment and communication component interfaces are coordinated; integration of tactical and non-tactical facilities and related infrastructure; and procurement and integration of communication links. A J&A for the design, development and construction of the EIS was approved for other than full and open competition by Lieutenant General Henry A. Obering on January 12, 2007, and a separate EIS contract was awarded to Boeing in April 07. The GMD system development, engineering and integration support covered by this element was specifically identified as an essential collateral element to the separate EIS contract authorized by that J&A. The EIS contract and the GMD contract are separate, but inter-related; support is required from the GMD System contract to the EIS contract for effective execution and integration of the overall EIS effort. Additional GMD specific systems engineering and integration support and program synchronization will be provided by Boeing to other European Missile Complex Contracts (i.e. European Midcourse Radar acquisition, as well as the Command and Control Battle Management and Communications (C2BMC) acquisition) as necessary to assure compatibility between separate European facilities/systems. (d) Critical Core GMD Weapon System Completion Activities: This effort provides for Critical Core GMD Weapon System Completion Activities. This consists of work specifically planned or contemplated for inclusion on the current contract if it were continued. It is essential to commence this work by second quarter FY09 in order to meet the required operational capability for this work content. This remaining Core GMD Completion work content will be comprised of critical acquisition activities necessary to complete GMD system spiral development including ongoing integrated acquisition logistics development activities and related element readiness testing. It will also include on-going agency requirements such as sustainment, operations, and support to Ballistic Missile Defense System (BMDS) systems integration and testing until completion and award of competitive breakout acquisitions which result from the ongoing GMD RFI Process. Specific content includes: (1) Block 3 Core Development: Completes Near Term Discrimination, Inertial Measurement Unit (IMU) upgrades/improvements, Divert & Attitude Control System (DACS) improvements, and completes close out of software discrepancy reports. (2) GMD Element Testing: Continues with the planning, execution, and analysis of GMD element readiness tests which include ground tests, simulations, and other appropriate activities against the Ground-Based Midcourse Defense segment of the BMDS as part of the - walk-up to BMDS integration and flight tests. The element readiness tests will be against Block 4 or earlier configurations. (3) GBI Refurbishment: Continue to procure and install refurbishment kits through FY09. Refurbishment after FY09 is a competition candidate activity and is to be addressed in the ongoing GMD RFI process. (4) Support to BMDS System Testing: Continue GMD-related flight and ground test activities for the broader BMDS until establishment and approval of the BMDS Acquisition Strategy for these test events is approved and implemented. (5) BMDS Development: Development of the following functions: Track Correlation, System Discrimination, Sensor Registration, Engagement Coordination, Hit/Kill Assessment: for the C2 portion of the service oriented architecture is not included in the Core Completion Contract and will be implemented as a part of the broader BMDS Acquisition Strategy. The integration of these common functions into the GMD element is included in the scope of this J&A. This also includes minimal GMD-specific development and integration support to other BMDS development efforts to include Command & Control Battle Management & Communications/Global Engagement Manager (C2BMC/GEM), Multiple Kill Vehicle (MKV), and Kinetic Energy Interceptor (KEI); future upgrades for Sea-Based X-Band Radar (SBX) and Upgraded Early Warning Radar (UEWR); Joint GM/Kinetic Interceptor (KI) Booster Avionics Commonality, Command & Control Battle Management & Communications/GMD Fire Control (C2BMC/GFC) System Track, Thermal Initiated Venting System (TIVS), Ground Systems Obsolescence, and BMDS future discrimination activities through FY09. BMDS Development, with the exception of Thermal Initiated Venting System (TIVS), after FY09 is a competition candidate activity and is to be addressed in the ongoing GMD RFI process. (6) Vandenberg Air Force Base (VAFB) / Fort Greely Alaska (FGA) Enhancements: Includes GMD-specific facility upgrades and re-designs through FY09. Enhancements after FY09 are a competition candidate activity and are to be addressed in the ongoing GMD RFI process. (7) Modeling and Simulation (M&S) development: Future GMD-specific test lab upgrades and M&S development through FY09. M&S development after FY09 is a competition candidate activity and is to be addressed in the ongoing GMD RFI process. In addition, GMD test lab sustainment and maintenance through FY09. It is contemplated that these will be separate line items due to differences in funding sources. (8) GMD Weapon System O&S: This includes analysis leading up to a performance based logistics (PBL) concept for all GMD weapon system components. It is anticipated that the actual PBL construct will be fully implemented in CY10 and beyond. Work beyond CY09 is a candidate for competition. O&S/PBL after CY09 is a competition candidate activity and is to be addressed in the ongoing GMD RFI process. (9) This element may include potential additional follow-on requirements for GMD specific support in the areas of development, integration, testing, operations and sustainment. The GMD RFI analysis is ongoing. If the RFI process confirms any of the RFI areas are not practicable for competition, this J&A will be amended and a modification will be initiated against the contract(s) vehicle resulting from this J&A. From August 2007 to January 2008, the Ground-Based Midcourse Defense (GMD) program performed a comprehensive acquisition risk analysis that addressed GMD work content planned for execution from January 2009 to September 2013. The risk analysis included participation by the Chief Engineer, as well as, Program Managers from Ground Systems (GS), Ground Based Interceptor (GBI), Test and Evaluation, Sensors, and Operations and Sustainment (O&S) Directorates. The analysis assessed impact to GMD cost, schedule and performance and correlated a risk's probability of occurrence to a system maturity criterion, data availability metrics and the criticality of Boeing's role in future efforts. Seven critical competition risk areas were identified for both the GMD Continuing Development and Operations and Sustainment programs. (a) Continuing Development: (1) Test laboratories and Embedded Test (ET) Availability (2) Interceptor Integration Facility Availability (3) GDIL Availability (4) Interoperability, delivery, and upgrade of operational hardware and software (5) Integration of incomplete capabilities into existing system (6) Boeing technical/corporate knowledge base (7) CONUS to EIS integration (b) Operations and Sustainment: (1) No configuration baseline (2) Future work/maintenance and repair relies on incomplete Logistics Data (3) Obsolete System Architecture (4) Training (5) Multiple Integrators and OEMs (6) Loss of investment (Trained Manpower and Infrastructure) (7) Facility infrastructure support based on incomplete TDP The Risk Analysis concluded that the Agency does not have the necessary technical data packages and associated data rights to adequately support competitive acquisition of the requirements under the GMD CCC J&A. Award to a source(s) other than Boeing would result in unacceptable schedule delays for any other source(s) to establish the necessary GMD System knowledge, expertise, and capabilities to successfully perform the requirements under the GMD CCC. Duplicative costs to the government would accompany the learning curve and schedule delays associated with award of these requirements to a source(s) other than Boeing. Further, GMD schedule delays would significantly impact other elements of the integrated BMDS. Significant cost and schedule delays would be incurred against other BMDS contracts due to delays in BMDS-level testing resulting from GMD schedule delays. The GMD Contracting Officer issued a Request for Information (RFI) to industry via the FedBizOpps on November 19, 2007. Modification 01 to the RFI was posted on November 20, 2007. The RFI identified the following GMD critical risk areas for government assessment: (1) System Test Capability (2) Simulated Combat Environment Capability (3) Ground-Based Interceptor (GBI) Integration Facility Capability (4) GBI Development and Integration Lab Capability (5) External Interface Capability (6) Sustainment and Upgrade of CONUS/OCONUS Operational HW/SW (7) Integration of Capability into the GMD System (8) Data Requirements (9) Any Additional Considerations (teaming arrangements) (10) Total System Integration (Late Addition Provided to All Current Respondents to Original RFI) Each potential source submitted a white paper detailing its approach to the GMD RFI. Industry briefings were held from January 16 through January 31, 2008. Follow-up questions were then sent to individual contractors to enable the government to better understand certain aspects of their presentations. Industry inputs are being utilized to develop the Government's risk assessment for the above critical acquisition risk areas and potential impacts against competition for the areas identified above. The white papers and associated briefs are being assessed by a panel of subject matter experts to determine if the proposed mitigation approaches are technically feasible and executable. Findings and conclusions are to be presented to a Senior Integrated Product Team in May 2008 as a prelude to developing a competitive Request for Proposal(s) for the competition candidate requirements. [END OF CLARIFICATION SYNOPSIS] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ The Missile Defense Agency Ground-Based Midcourse Defense Program (MDA/GMD) intends to negotiate on a sole source basis with The Boeing Company, Huntsville, Alabama, a new Core Completion Contract for the GMD program that will be comprised of four major work content elements. The four major work content areas that make up the Core Completion Contract include 1) the transfer of activity currently contracted for under HQ0006-01-C-0001 (critical activities necessary to complete the current spiral development), 2) Block 4 hardware and software, 3) European Interceptor Site integration support, and 4) Critical Core GMD Weapon System Completion Activities. The GMD Core Completion Contract will be a continuation of past and present BMDS development efforts to complete the current spiral development. Based on current operational schedules, this spiral must be completed by 4th quarter FY 13. The proposed acquisition is directed to Boeing pursuant to 10 USC 2304(c )(1), as implemented by FAR 6.302-1(a)(2)(ii). These four major work content areas cannot be performed by any source other than Boeing without substantial and unacceptable programmatic risk, duplicative cost, and schedule delays. Only Boeing, the incumbent GMD System Prime contractor, has the necessary engineering, manufacturing, and software knowledge and expertise to perform and manage multiple major sub system developments, hardware/software programs and related integration activities without unacceptable delay to program schedules and unnecessary duplication of sunk development costs which cannot be recouped via competition. Boeing, as the current prime contractor for the operational capability, continuing spiral development and test of the GMD element of the BMDS, is the only qualified source to perform this completion effort within cost and schedule constraints. Furthermore, Boeing is the only source with the institutional technical knowledge that is critical for managing and integrating the completion of the ongoing development and fielding of the GMD System. Boeing is the only source with the engineering, manufacturing, software and fielding experience and expertise to conduct, manage and integrate the multiple major sub system developments, site design/build activities and related integration efforts without resulting in unacceptable program delays and enormous duplication of costs that could not be recovered through competition. Duplication of prior development costs is unaffordable and would not be recoverable through competition for these requirements. There would be additional schedule and costs delays for the government to conduct extensive re-testing/re-validation to ensure the necessary GMD System capabilities, expertise and knowledge have been successfully transferred to any new system prime contractor. It is highly improbable that other sources are available to duplicate the work already accomplished by the incumbent, to meet the Government's critical schedule requirements and not disrupt current system operational capability. This proposed sole-source contract action does not preclude the on-going assessment of the future GMD potential competitive requirements which are a part of our current Request for Information (HQ0147-GMD-RFI-1). For the anticipated Core Completion Contract, a Cost Plus Award Fee type contract vehicle is contemplated. The anticipated period of performance to complete the current spiral development in the GMD Core Completion Contract covers 2nd quarter FY09 through 4th quarter FY13. Findings and conclusions from the on-going RFI are to be presented to a senior Integrated Product Team in the 3rd quarter FY 08 timeframe as a prelude to developing any competitive Request for Proposal(s) for competition candidate requirements. The proposed contract action is for work content for which the Government intends to solicit and negotiate with only one source under the authority of FAR 6.302. This notice of intent to award a sole source contract is not a request for competitive proposals. Interested parties are advised that the GMD program office is currently in spiral development and that adequate system documentation is not currently available. Interested parties who believe they can perform this requirement without substantial duplication of cost or schedule impacts to the Government are invited to submit a written narrative statement of capability, including detailed technical information sufficient to permit agency analysis in order to determine bona fide capability to meet the Government's requirements. The above stated information must be received no later than 15 days after publication of this synopsis, should cite GMD Sole Source Core Completion Contract Acquisition, and shall be emailed to Ms.Cathy Hill at cathy.hill@mda.mil and Ms.Chanda Tallman at chanda.tallman@mda.mil. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will be considered solely for the purpose of determining whether to conduct a competitive procurement. All responsible sources may submit a capability statement, as outlined above, which will be considered. This is NOT a formal notice of solicitation. Telephone or facsimile inquiries and/or responses will not be accepted. This action is not open to allied participation. See Notes 22 and 26.

Similar Contracts

Same NAICS industry code

NAICS: 541712
New
DIBBS
PISTON, INNER TUBE, A
Solicitation # SPE7M4-27-T-1466
Solicitation SPE7M4-27-T-1466 is a request for quotations issued by the DLA Weapons Support Fluid Handling Division for the procurement of 12,000 units of Piston, Inner Tube, A, identified by NSN 1710-01-478-1536 and Boeing part number 74A430839-2003. This is a restricted source item requiring engineering source approval by the government design control activity. The contract specifies a delivery timeframe of 154 days after receipt of order, with a need ship date of April 6, 2027, and an original required delivery date of March 6, 2028. Shipping is established as FOB Origin, with the final destination being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to quality and technical standards, including the DLA Master List of Technical and Quality Requirements, with specific prohibitions against the use of Class I ozone-depleting chemicals. Packaging must comply with ASTM D3951 and RP001, while marking and labeling must follow MIL-STD-129 and RQ017 for bare item marking. Inspection and acceptance will occur at the destination per FAR 52.246-2, utilizing sampling methods such as MIL-STD-1916 or ASQ H1331. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and compliance with DFARS 252.225-7001 regarding the Buy American and Balance of Payments Program.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

5 days ago

DEADLINE

in 8 days
View Details

More opportunities from Department Of Defense → Missile Defense Agency (mda)

Same awarding agency

NAICS: 541715
New
Federal
Missile Defense Agency - Nimble Options for Buying Layered Effects (NOBLE) Announcement
Solicitation # HQ0860-25-S-0001
The Missile Defense Agency Nimble Options for Buying Layered Effects (NOBLE) Announcement, solicitation number HQ0860-25-S-0001, is an overarching acquisition strategy active from March 27, 2025, through March 27, 2030. Rather than a single contract, it serves as a consolidated framework to rapidly develop, prototype, and field disruptive missile defense technologies across the entire kill chain. The program focuses on three primary technical areas: Kinetic and Hypersonic Defense for cost-efficient interceptors, Command, Control, and Battle Management utilizing AI and quantum computing, and Space-based Sensors, Interceptors, and Effectors to maintain space domain awareness. Under this framework, the MDA will release individual solicitations using various authorities, including FAR-based procurement contracts and Other Transaction (OT) agreements. Each individual solicitation will define its own specific technical requirements, evaluation criteria, funding levels, and submission deadlines. Interested parties must be registered in the System for Award Management (SAM) and are directed to monitor SAM.gov and the MDA Opportunity Marketplace for new opportunities, such as the Mobile Integrated Launch Capability, Low-Cost Kill Vehicle, and Shipborne Phased Array Instrumentation Radar. All offerors are subject to Organizational Conflict of Interest rules per FAR Subpart 9.5 and DFARS Subpart 209.5. Security requirements include compliance with NIST SP 800-171 and the Cybersecurity Maturity Model Certification (CMMC) program, with some efforts requiring secure interfacing with classified systems. All unclassified communications regarding the NOBLE program should be directed to MDA-NOBLE@mail.mil.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

4 days ago

DEADLINE

in over 3 years
View Details
NAICS: 541715
Federal
Mobile Integrated Launch Capability
Solicitation # 26-MDA-12366
The Missile Defense Agency (MDA) is soliciting innovative and cost-efficient alternatives to current air drop C-17 target launches through the Mobile Integrated Launch Capability (MILC) program. The objective is to develop mobile launch platforms capable of deploying short to long range target missile systems from any location worldwide to increase launch cadence and reduce costs. This effort is structured in two phases: Phase I focuses on detailed design, engagement analysis, and prototype costing with an objective performance period of three to six months; Phase II involves prototyping, ground testing, and the delivery of one launch platform for a target vehicle system launch, with an objective performance period of twelve to twenty-four months. The solicitation is open to large and small businesses, non-traditional defense contractors, and accredited educational institutions. Interested parties must submit white papers detailing their technical approach, design concepts, and a Rough Order of Magnitude cost estimate. Selection is based on a two-step process evaluating technical merit, innovation, potential utility to agency programs, schedule, and lifecycle cost. Awardees must possess an active Secret Facility Clearance and adhere to strict cybersecurity and Controlled Unclassified Information (CUI) marking requirements. The MDA will consider various contract types, including fixed price and cost reimbursement, as well as Other Transaction (OT) Agreements.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

16 days ago

DEADLINE

in almost 2 years
View Details
NAICS: 541715
Federal
Missile Defense Agency - Advanced Capability Concepts
Solicitation # HQ0860-25-S-C001
The Missile Defense Agency (MDA) Advanced Capability Concepts solicitation, HQ0860-25-S-C001, is an ongoing effort to identify and acquire innovative concepts, technological breakthroughs, prototype demonstrations, and scientific innovations to enhance the robustness and effectiveness of all Missile Defense System elements. This solicitation is open for a five-year period from May 9, 2025, to May 8, 2030, and utilizes a two-step competitive process. In the first step, industry partners submit white papers for evaluation based on technical merit, importance to agency programs, and funding availability. Selected offerors then proceed to a second step involving detailed negotiations. The agency is open to various contract types and authorities, including FAR-based procurements, Other Transaction (OT) agreements, Broad Agency Announcements (BAA), Prototype Entry Points (PEP), and Commercial Solutions Openings (CSO). White paper submissions must be sent electronically to MDA.ACC-WP@mail.mil and include a title page, executive summary, program description, program plan with a milestone chart, description of prior work, a Rough Order of Magnitude cost estimate, and a program summary quad chart. Evaluation is weighted heavily toward technical achievement (50%), with research capabilities (25%) and program management (25%) making up the remainder. Offerors must be registered in the System for Award Management (SAM) and are required to disclose any organizational conflicts of interest using MDA Form DA-78-F2. Security requirements include compliance with NIST SP 800-171 and the Cybersecurity Maturity Model Certification (CMMC) program where applicable.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

20 days ago

DEADLINE

in over 3 years
View Details
NAICS: 541715
Federal
**PRE-SOLICITATION NOTICE** Forward Based Mode Radar Next Prototype
Solicitation # MDA26SNSPN04
The Missile Defense Agency (MDA) Mobile Land-Based Sensors Project Office is seeking innovative prototype concepts for the Forward-Based Mode (FBM) Radar Next. This effort, conducted under the Nimble Options for Buying Layered Effects (NOBLE) Other Transaction Authority (OTA) pursuant to 10 U.S.C. 4022, aims to rapidly develop a highly mobile, rapidly deployable sensor system. The primary objective is to enhance the early warning, tracking, and discrimination of complex, high-speed, and maneuverable threats, including ballistic, cruise, and hypersonic missiles, while ensuring seamless integration into the existing Command and Control, Battle Management, and Communications (C2BMC) architecture. The prototyping process is structured into four phased cycles: Concept Development, Technology and Manufacturing Readiness and Extensibility, Subscale Prototype and Modeling and Simulation, and Full-Scale Prototype Development and Demonstration. Key technical requirements include C-17 military airlift and tactical ground vehicle compatibility, rapid setup and teardown capabilities, and a modular open-system architecture. Performance will be evaluated through a series of pass/fail gates focusing on hardware/software readiness, manufacturing feasibility, and operational utility. The government encourages collaborative teaming between prime contractors, non-traditional defense contractors, and small businesses, expecting a shared commitment through resource alignment or co-investment. All offerors must possess or obtain a Facility Security Clearance through the Defense Counterintelligence and Security Agency prior to the start of the first cycle. Performance will take place at Redstone Arsenal, Alabama. This notice serves as a pre-solicitation and does not constitute a formal request for proposal.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

about 1 month ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS