Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on February 9, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

T-AOE USNS ARCTIC MAINTENANCE AND REPAIR UPGRADE (MARUP)

Closed
N1024-11-0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation is soliciting proposals for the complete repower of a 30 foot Munson landing craft. The selected contractor will be responsible for the decommissioning and removal of two existing Honda BF250A outboard engines and the procurement and installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing structural transom inspections, the installation of Honda iST electronic control heads at dual helm stations, integration with the SeaStar Power Assist steering system, and a comprehensive fuel system overhaul using USCG Type A1-15 lines. The project concludes with NMEA 2000 network integration, digital gauge installation, and a minimum two hour sea trial to validate performance and safety protocols. To ensure factory warranty coverage, the contractor must maintain active Honda Marine Authorized Dealer or Service Center status. The vessel will be delivered via trailer to the contractor facility, which must provide a secure, fenced yard or indoor shop. Award evaluation is based on a weighted criteria of cost, technical expertise, and TERO status, with a preference for Colville Business Enterprises. Proposals must be submitted in PDF format by November 13, 2026. Final contracts are subject to tribal appropriation and may require a performance bond for values exceeding 100,000 dollars or a 25 percent retainage.
Confederated Tribes of the Colville Reservation

POSTED

about 3 hours ago

DEADLINE

in 24 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

VA

Set-Aside

NONE

Documents

1

NAVSEA+DWG+8287176++Test+Requirements++12+OCT.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Military Sealift Command
Contacts1 person available
OfficeNORFOLK, VA, 23511-2419, USA
Office AddressNORFOLK, VA, 23511-2419, USA
Contacts
Reyn C SchuttlerContract Specialist

Full Description

Show more
N1024-11-0001 February 8, 2010 From: COMSC N1024 Subject: Market Survey for the T-AOE USNS ARCTIC MAINTENANCE AND REPAIR UPGRADE (MARUP) Enclosure (1) NAVSEA DWG 8287176 Rev - This is a request for information only and your response is not an offer. This is not a solicitation or request for quotes and no contract or purchase order will be awarded from this notice. There is no solicitation, specifications or drawings, other than the Heavy Underway Replenishment (UNREP) Testing Guidance at Enclosure (1), available at this time. BACKGROUND/APPROACH The Military Sealift Command (MSC) operates four (4) T-AOE 6 Class ships with a primary mission of providing fast logistical support to the US Navy's fleet. The Military Sealift Command will operate the USNS ARCTIC (T-AOE 8) on a routine scheduled Dry-Dock period. The geographic area of consideration is the US East Coast or Gulf of Mexico. Beginning on/about 11 January 2012, MSC will put the T-AOE 8 into a Regular Overhaul and Dry-docking with a period of performance of approximately 270 days to install a new machinery controls system, habitability modifications (Habmods), heavy UNREP installation, dry-docking, normal maintenance & repair items, and alterations. The machinery control system is being installed as Government Furnished Equipment (GFE) and will be the main focus of the availability alterations. Another large set of alterations are the habmod requirements. The installation of a fully functional prototype Heavy UNREP System for Station No. 6 and backbone equipment for Station 12 (not functional) are also major alterations. The alterations are to enhance operational and control characteristics and consolidate disparate monitoring systems. The ship particulars are as follows: USNS ARCTIC (T-AOE-8) Length Overall - 753 FT. - 8 - IN Max Beam - 107 FT. - 0 IN Full Load Displacement -53,000 LT Enclosure 1 NAVSEA DWG 8287176 Rev - (Heavy UNREP Testing Guidance) While the finalized list of work items is still under development, a list of the notional work package items is as follows: Watertight Door Repair Lube Oil Unloader Valve Repair Gas Turbine Filter House Repair and Preservation LO Temp Regulating Valve Overhaul Shore Power Monitoring & Safety Mods SWBD Fuse Replacement Switchoard 1S, 1SA, & 1SB Bus Tie Auto Closure Removal RCC Vane Status Monitoring & Safety Mods Steering Local Control RCC Fill & Drain Valves Reefer Plant Monitoring HPAC Controller Replacement Refrigeration Plant Monitoring System Overhaul bleed air regulator valves Install Shipwide Fire Detection System Install JP 5 helo refueling fuel meter Valve Repair Boiler Inspection Renew Sea Water Pipe Overhaul Distillate Pump and Motor Overhaul Condensate Pump and Motor Overhaul Brine Pump and Motor Overhaul Feed Pump and Motor Cargo Reefer Compressor Repair Central Seawater Pump and Motor Repair AC Seawter Pump and Motor Repair Fuel Oil Stripping Pump and Motor Repair Repair JP-5 Stripping Piping Install MARPOL Fuel Drip Sampling Capability JP-5 Recirculation Piping Modification No. 2 JP-5 Pump and Motor Overhaul Cargo Fuel Oil Pump and Motor Overhaul Misc Leslie Valve Repair Fire Pump and Motor Overhaul Recondition No. 3 Elevator Hoist Motor Replace Sewage Piping Deck Compressor Installation Install Fire Dampers in Halon Spaces Annual Fire Fighting Certification SCBA Certification J Door Refurbishment Accommodation Ladder IMO Certification Replace Deck Covering Main Deck and Above AC Plant Refurbish Clean Ventilation System Ducting Replace vent Duct Insulation Install Independent Cooling Systems in Various Spaces Repair Cooling Coils Overhaul Vane Axial Fans and Motors Repair Steam Heating Coils Rip Out Existing Medical Spaces and Install 11 New SR and 2 T&S Spaces Refurbish and Rearrange all Crew Open Berthing Spaces- A total of 130 single high racks, 260 lockers, 130 desks, and Refurbishment of a total of 6 T&S Spaces Dry-Dock and Undock Ship Rudder Survey Stern Bearing Survey Sea Valve Overhauls Underwater Blast and Coat Clean and Polish Propellers Zinc Renewal Anchor and Chain Steel Renewal Blast and Coat Tanks Intermediate Hull Survey and UT Testing Main Propulsion Shaft Survey Oily Waste and Waste Oil Tank Preservation ABS Quadrennial Inspection HP Air Relive Valve Calibration Station No. 2 Spanwire Winch Main Electric motor bearings Upgrade Remaining 4 Hauling Winches to IC Drums/Farin Shoes Accomplish Solo Cable Upgrade on Legacy Stations Refurbish Station 11 Sliding Pad Eye Replace all Ram Tensioner Accumulator Floating Piston Seals HRAS Station No. 6 Installation HRAS Station No. 12 Installation Backbone Questions for Industry: Please prepare a capabilities statement to address the foregoing and at a minimum the items enumerated below: (1) Is the shipyard's dry-dock currently NAVSEA certified? If not, what certification does it currently hold? Has it ever been NAVSEA certified in the past? (2) This availability is currently anticipated to have a period of performance of approximately 270 beginning on/about 12 January 2012. The dry-docking will be restricted to the first 60 days of the availability. Is your dry-dock available in this timeframe? Do you have the capacity to manage this size availability given other workload anticipated for this same timeframe? (3) The machinery control system will be replaced during this availability by a Government Contractor. The shipyard will be responsible for removing the existing control consoles and supporting GFE installation. The time frame to accomplish this removal is within the first 60 days of the overhaul. What if any experience does the shipyard have with this type of work with imposed time frames of this sort? (4) A large alteration in this package is the installation of a new Heavy UNREP system for Station 6 which will be a fully functional prototype. The Station 12 Heavy UNREP requirements are a "backbone" of equipment which will have to be modified in the future to become functional. The Heavy Unrep alterations will require removal of machinery and installation of foundations and equipment while the ship is on dock to support installation and testing schedules. Also, significant pier testing will be required once the installation is completed by the shipyard. How has your shipyard tested new UNREP systems in the past? Can your facilities accommodate the stretch testing required for completion of this work? A guide to testing is provided as Enclosure (1). (5) This procurement will be solicited under NAICS 336611, Ship Building and Repair. Please indicate your business size status for this NAICS. Is your company a large or small business, and if a small business, do you fall within any of the further classifications (Hubzone, SDVOSB, WOSB, etc.) Please provide your response to this Request for Information by COB 23 February 2011. Submissions should be made by email to Reyn.Schuttler@Navy.Mil. MSC has limitations on file sizes, so if the attached files are larger than a total of 3M, please submit via separate emails. Submission of a capabilities statement is not a prerequisite to any potential future offerings, but participation will assist the Government as to the extent of shipyards available for this procurement. The Government is not obligated to and will not pay for any information received from potential sources as a result of this notice.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS