This Solicitation opportunity from Maine was posted on August 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
T8 R3 NBPP — Big Meadow Bridge Replacement in the Township of T8 R3 NBPP Big Meadow Bridge over Meadow Brook approximately 0.52 of a mile north of Prentiss T7 R3 NBPP township line.
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Maine Department of Transportation is soliciting bids for the Big Meadow Bridge Replacement (WIN 027270.00) in Washington County. The project involves the replacement of Bridge No. 0064 over Meadow Brook, located approximately 0.52 miles north of the Prentiss T7 R3 NBPP township line. The scope of work includes the construction of a precast concrete box culvert, maintenance of traffic via a special detour, and the installation of roadway items such as guardrails, plain riprap, and pavement markings. The project is governed by the March 2026 edition of the MaineDOT Standard Specifications and Standard Details, with a required completion date for all work, excluding warranty, by June 23, 2028. Bids are due by 11:00 A.M. on September 16, 2026, and can be submitted either as paper bids to the MaineDOT Building in Augusta or electronically via Bid Express. The contract will be awarded to the lowest responsive bidder who has successfully completed a bridge, highway, or project-specific prequalification. Bidders must provide a bid bond and a DBE Proposed Utilization form. The contractor is responsible for all supervision, labor, equipment, and quality control, including inspection and testing. Acceptance of the work will be based on visual inspection by the Resident and test results, particularly for hot mix asphalt pavement.
General Info
Place of Performance
T8 R3 NBPP, ME, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Big Meadow Bridge over Meadow Brook approximately 0.52 of a mile north of Prentiss T7 R3 NBPP township line.
More opportunities from Maine Department of Transportation
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
