Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on April 26, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Notice of Intent for Geophysical Transient Electromagnetic (TEM) Survey within the Everglades Agricultural Area (EAA) A-2 Reservoir Footprint

Closed
W912EP21Z0023Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 14 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

Belle Glade, FL, USA

Set-Aside

NONE

Documents

1

PWS+Waste+Collection+Talleyrand+Depot.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Notice type changed from Sources Sought to Special Notice. Response deadline changed from May 7, 2021 to May 12, 2021. The notice title changed. NAICS code changed from 5621 to 541330. Set-aside removed. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA

Full Description

Show more
THIS IS A NOTICE OF INTENT TO SOLE SOURCE, NOT A REQUEST FOR A PROPOSAL. A SOLICITATION DOCUMENT WILL NOT BE ISSUED AND PROPOSALS WILL NOT BE REQUESTED. The US Army Corps of Engineers, Jacksonville District, intends to negotiate on a noncompetitive, sole source basis, under the authority of FAR 6.302-1(a)(2) - Only one or a limited number of responsible sources and no other supplies or services will satisfy agency requirements, to Collier Geophysics, LLC, to serve as the expert consultant for Geophysical TEM Survey. This service will be delivered to the Jacksonville District, USACE. NAICS Code is 541330, and size standard is $16.5 Million. This procurement requires a geophysical TEM survey with an AgTEM cart along approximately 245 miles of serpentine transects within the proposed Everglades Agricultural Area (EAA) A-2 Reservoir footprint. This procurement also requires a vendor to provide a series of conventional ERT ground truthing transects based on field observations totaling up to 8.5 miles. The project area is located south of the City of Belle Glade in Palm Beach County, Florida on the western side of U.S. Route 27 between the Miami and New River canals. This procurement requires geophysical investigation to: Characterize the pre-construction subsurface conditions in 3D within and directly adjacent to the project area; More precisely map variations in groundwater quality and lithostratigraphy within, and adjacent to, the project area based on TEM data calibrated to existing borings; Collect high resolution 3D terrestrial resistivity data; Characterize the depth to, and lateral extent of brackish groundwater to a minimum depth of 200 ft below ground surface (bgs). USACE's traditional means of evaluating the occurrence of brackish groundwater is based on periodic geophysical logging of monitoring wells. A geophysical monitoring program adjacent to the Herbert Hoover Dike seepage cutoff wall is ongoing, as required by the State of Florida. Geophysical logging of 39 monitor wells provides depths of brackish groundwater at discrete points along the 100-mile circumference of Lake Okeechobee. This approach is appropriate for a large geographic area but does not provide the spatial resolution to define subsurface conditions beneath a much smaller footprint (12,000 acres, 17-mile periphery) at the EAA A-2 reservoir. Data acquired using the AgTEM system will result in a detailed characterization of hydrogeologic conditions to depths of up to 300 ft bgs. This data will be critically important for the development of a long-term groundwater monitoring program, and characterization of brackish groundwater for subsequent groundwater flow model development efforts. The AgTEM system is available in the CONUS only through Collier Geophysics, LLC (590 E South Loop Stephenville, TX 76401). Collier Geophysics, LLC has a three-year exclusivity agreement with Groundwater Imaging to be the sole provider of the technology in the CONUS. All Sub-licensees will be subject to the terms and conditions of this agreement. Collier Geophysics, LLC has significant specific geophysical and system knowledge that is required for properly operating and interpreting that data collected by the AgTEM system and its implications for the project area. In consideration of the above, Collier Geophysics, LLC is uniquely qualified for the award of the new USACE-SAJ contract to collect subsurface resistivity data at the EAA A-2 Reservoir. This Notice of Intent is NOT a request for competitive proposals. Parties may express their interest; accompanied by supporting literature, to the Contracting Officer no later than 12 May 2021 C.O.B. Responses should be sent to sherelle.n.barber@usace.army.mil. Telephone responses will not be accepted. Information received will be for the purpose of determining whether or not to conduct a competitive procurement. The determination to conduct a competitive procurement based on responses to this notice is solely within the discretion of the Contracting Officer.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
Other Heavy and Civil Engineering Construction

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, Florida
Solicitation # W912EP26BA019
The US Army Corps of Engineers, Jacksonville District, is soliciting bids for the rehabilitation of the South Jetty at Palm Beach Harbor in Palm Beach County, Florida. This firm-fixed-price construction project, identified by solicitation number W912EP26BA019, has an estimated magnitude between $1,000,000 and $5,000,000. The scope of work involves substantial manipulation of new and existing stones to achieve required interlocking and the execution of concrete repairs. All mobilization and construction activities must be water-based using marine construction methods and equipment, as land-based access to the project site is strictly prohibited. The project has an estimated period of performance of 330 calendar days following the Notice to Proceed, which includes 60 days to commence work. Critical environmental and safety requirements include a mandatory pre-construction benthic community survey and the relocation of corals by Florida Fish and Wildlife Conservation Commission qualified contractors prior to the start of jetty work. The project adheres to EM 385-1-1 safety standards and requires the use of Coast Guard-certified equipment. Contractual terms include liquidated damages of $2,818 per calendar day of delay and a bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less. This unrestricted procurement falls under NAICS code 237990, and all eligible offerors must be registered in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS