Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on November 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tamiami Park - Pool Substrate Pump Room and Filtration System Renovation Rebid

Closed
RPQ No 2025TPGC-RState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 325180
New
SLED
The Supply Of Aluminum-Based Coagulants And Polymers For Wastewater Treatment
Solicitation # 27COAG
The City of Woodland is soliciting proposals for the supply of aluminum-based coagulants and polymers for its Water Pollution Control Facility in Woodland, California. The contract involves the delivery of aluminum chlorohydrate solution in bulk, estimated at 250,000 pounds annually with loads between 32,000 and 35,000 pounds, as well as approximately 10 totes of polymer or aluminum chlorohydrate solution per year. The base term of the agreement is five years, running from December 16, 2026, to December 15, 2031, with two optional one-year extensions. Deliveries are requested on an as-needed basis and must be completed within five working days of a request, with bulk offloading requiring compressed air supplied by the tractor-trailer. Award selection is based on the most advantageous proposal, considering price, qualifications, experience, and the proposer's operational resources. Mandatory requirements for consideration include California licensing, completion of jar testing, and a lack of conflicts of interest. The selected contractor must provide at least three site visits per year, offer technical support for testing and analysis, and ensure products meet EPA, ASTM, NSF, and ANSI standards. Proposals must be submitted in a sealed envelope by November 12, 2026, and include a firm, irrevocable offer valid for 120 days. Evaluation factors emphasize the ability to meet emergency delivery requirements and the overall capacity to maintain a reliable supply chain.
City of Woodland

POSTED

1 day ago

DEADLINE

in 16 days
NAICS: 325180
New
DIBBS
CARTRIDGE, TONER
Solicitation # SPE7M2-27-T-0175
Solicitation SPE7M2-27-T-0175 is a fixed-price request for quotations issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of 211 toner cartridges. The item is identified as a Commercial Off The Shelf product, specifically Xerox Corporation part number 006R04686 and NSN 3610017251180. This procurement is designated as a Service-Disabled Veteran-Owned Small Business set-aside cascade. Delivery is required at the DDSP New Cumberland Facility in Pennsylvania, with a need ship date of May 18, 2027, and an original required delivery date of June 5, 2027. Terms are FOB Origin under the First Destination Transportation program, with inspection and acceptance occurring at the destination. The contract mandates strict adherence to quality and packaging standards, including MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. The toner cartridges are classified as Type I Code M items with a non-extendable shelf life of 24 months, requiring the vendor to clearly annotate the shelf-life date on all individual item labels and material packaging. Additionally, the contract prohibits the intentional addition of mercury or mercury-containing compounds. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment, and compliance with the Buy American Act and Berry Amendment regarding domestic sourcing. Cybersecurity requirements are governed by DFARS 252.204-7012 for the safeguarding of covered defense information.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

4 days ago

DEADLINE

in about 15 hours

AI Contract Overview

Show more

The contract involves a comprehensive renovation of the pool substrate, pump room, and filtration system at Tamiami Park, with a focus on replacing critical components to meet current safety and building standards. The contractor is responsible for obtaining all necessary permits before commencing work, which includes reviewing all provided documents, specifications, and scope of work. The scope encompasses removal and replacement of the entire pool filter system, chlorine and C/O 2 systems, pump room structures, electrical panels, pool decking, coping, ladders, handrails, and windows facing the pool deck. Additionally, all piping must be replaced with noncorrosive PVC/aquatic mechanical-rated products compliant with Florida building and Department of Health codes, including valves and other related components. The contractor must perform onsite measurements, review shop drawings, and ensure all work aligns with the provided specifications and permitting requirements, including aquatic calculations. All materials and workmanship are subject to inspection, and any defects identified by manufacturer representatives or the owner must be repaired prior to project completion. The contract also stipulates that all design, plan, and permitting documents be sealed and submitted for approval, with associated fees reimbursed through a dedicated allowance after permits are issued. The project is set within a budget range of $500,000 to $1,500,000, with the primary point of contact being Roberto Ciprian from Miami-Dade County Strategic Procurement.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Miami Dade County Strategic Procurement
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Roberto Ciprian

Full Description

Show more
(Contractor must obtain and submit all permits prior to performing any work.) CONTRACTOR shall review all documents, specifications, and scope of work provided by Miami-Dade County Parks, Recreation, and Open Spaces Department for work to be completed. Furnish all labor, equipment, and materials required to comply with the intent of the WORK described in the contract documents including but not limited to: Scope of work to remove all pool filter system to replace with new, all chlorine related system and replace with new, all c/o 2 system and replace with new, all pump room structures to be removed and replaced with new, all electrical panels to be replaced to match existing pending design changes and replace with new, pool substrate resurfacing, pool substrate coping replacement, pool ladder handrail removal and replacement, pool deck drain replacement, pool bldg. full view windows and door facing pool deck. Contractor shall remove existing and replace with PVC/aquatic mechanical rated products for all pool piping as required to meet current Florida building/DOH codes to include all ball, gate, butterfly, multiport, diverter, check valves, etc. All materials shall be noncorrosive as applies to use/location of item(s). Pipe Replacement (main drain, gutter/return lines, all filter components/piping from pool substrate to retention tank, valves, etc. Prior to submitting bid, the contractor is to visit site and become familiar with areas and requirements as per scope of work needed in RPQ and shop drawing provided by owner to complete project. Contractor shall be required to complete/responsible for onsite measurements as applies for submission per building code requirements for permitting (Aquatic calculated Required), contractor shall reference shop drawing, specifications by owner. Contractor shall furnish all documents to include sealed plan/drawings, calculations, manufactures specifications, detailing scope of work as required for permitting, all associated fees for design, plan processing and permitting cost will be reimbursed through dedicated allowance upon permit issued. Contractor shall reference owner shop drawings, specifications and documents to complete plans for permitting (Aquatic calculated Required). Contractor shall provide a representative for all manufactured products to determine the preparation and installation of all areas as applies in scope of work. Any imperfection’s workmanship detected by the manufacturer representative and/or owner shall be repaired prior to completion of project. Prior to submitting bid, contractor is to visit site and become familiar with areas and requirements as per scope of work needed in RPQ and shop drawings/attachments provided by owner to complete project as reference only. Contractor will be required to complete on site measurements as applies for submission per building code requirements for permitting as per shop drawing/attachments by owner as reference only.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS