Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 8, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Task Order-Construction Agreement For Multiple Projects Master Enabling Agreement

Closed
CSUSB24-2-8State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes such as epoxy mortar flooring, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the work includes a full NFPA-compliant fire suppression system, electrical distribution and lighting upgrades, building automation controls, and site improvements including paving, drainage, and hazardous materials abatement. The estimated contract value is between 10 million and 25 million dollars, with a performance period of 730 days after award. The contract is awarded based on the lowest price, with pricing required for two primary exhibit line items: building renovation and paving removal and replacement. Bidders must adhere to strict bonding requirements based on proposal value, including bid, payment, and performance bonds for projects exceeding 150,000 dollars. Compliance with the Davis-Bacon Act, ADA accessibility guidelines, and specific military standards for piping and labeling is mandatory. Project administration will be managed through Wide Area WorkFlow for invoicing, and quality assurance will be enforced via a three-phase control process and a final acceptance inspection involving the Contracting Officer and a Quality Control Manager.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, mechanical and electrical utilities, and an underground stormwater retention system. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator services, fire protection, plumbing, mechanical, electrical, sitework, and crane operations. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform comprehensive water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. The project follows a fire sprinkler discharge and requires the restoration of the first, second, and third floors, including dormitories, offices, and conference rooms. The scope of work encompasses architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. Award will be based on Best Value, evaluated through a weighted system consisting of price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory pre-bid site visit and provide a detailed cost breakdown, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act and specific Executive Orders regarding minimum wage and paid sick leave. Compliance with OSHA, EPA, ADA, and NFPA-101 Life Safety Code is required, and the contractor must provide a one-year guarantee of workmanship.
Grafton Job Corps

POSTED

about 6 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation is seeking proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces, including sixteen residential rooms and bathrooms, common areas, and mechanical rooms, to return them to safe residential use. The scope of work involves drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that all restored mechanical, plumbing, electrical, fire/life-safety, and security systems are tested and approved. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing, a detailed work plan including project phasing and occupied-building protection, and evidence of relevant experience. Award requirements include payment and performance bonding for the full project value, as well as general liability insurance of 1 million dollars per occurrence and 3 million dollars general aggregate. A minimum one-year workmanship warranty is required upon final acceptance by CSD.
Career Systems Development Corporation

POSTED

about 6 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The contract involves a three-year master enabling agreement between the California State University, San Bernardino, and qualified General Contractors to provide design-build and construction management services for multiple projects. The process begins with the submission of Statements of Qualifications, after which the selected contractor collaborates with the university during the design and preconstruction phases to develop either a Lump Sum Price or a Guaranteed Maximum Price (GMP) for each project. Only upon mutual agreement on pricing will the university proceed with awarding the construction phase, ensuring cost certainty and project scope clarity. The total maximum budget for all projects under this agreement is capped at 30 million dollars, with individual projects not exceeding 7 million dollars, and the contract duration is set for three years. The agreement stipulates that all work must comply with prevailing wage laws monitored by the California Department of Industrial Relations, and both the general contractor and architect must be licensed in California and prequalified through the CSU Office of the Chancellor. The contract emphasizes flexibility, as there is no guarantee of a minimum volume of work, and the scope includes all design, preconstruction, site management, and construction costs within the total budget. The procurement process is managed through a formal solicitation, with a response deadline of September 11, 2024, and the primary contact for inquiries is Megann Martinez. This comprehensive approach aims to streamline project delivery, control costs, and ensure compliance with state regulations across multiple campus construction projects.

Documents

7
PDF, High priority: read this firstcontract-general-conditions
High
PDF, High priority: read this firstcontract-general-conditions
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia State University, San Bernardino
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION 1.0 INTRODUCTIONThe State of California, acting through the Board of Trustees of the California State University, hereinafter called Trustees, on behalf of California State University, San Bernardino, hereinafter called University, is requesting Statements of Qualifications (SOQ) from interested and qualified General Contractors (Respondents) to provide Design-Build and Construction Manager services with Lump Sum Price or GMP pricing for the design and construction of multiple projects under a master enabling agreement (MEA).The delivery method for this contract is Task Order-Construction Agreement for Multiple Projects—Master Enabling Agreement (TO-CA MEA). The TO-CA MEA will include two types of agreements for the multiple projects: a task order for the design and preconstruction phase services for each project, and individual project construction agreements for the construction phase. During the design and preconstruction phase and under a Trustees-issued task order, the selected Respondent will collaborate with the Trustees on the design, constructability, cost, and schedule of the Project and develop a Lump Sum Price or GMP proposal to construct the Project. Upon the Trustees’ acceptance of the Lump Sum Price or GMP, the Trustees will issue a Construction Agreement to the General Contractor for the construction phase. If the Trustees and the General Contractor do not agree upon a Lump Sum Price or GMP, the Trustees will not award the construction phase of a Project to the General Contractor.2.0 DESCRIPTION OF TO-CA MEA2.1 Description• The Trustees’ TO-CA MEA is a three-year contract.• The Total Maximum Budgeted Cost for all Projects is defined as the total cost for the Work for all projects, including all design, preconstruction and site management fees, and overhead and profit.. • The Total Maximum Budgeted Cost for all Projects shall not exceed $30,000,000.• The Budgeted Direct Construction Cost for all Projects is defined as the total cost of the work for all projects, excluding design, preconstruction, and site management fees, and overhead and profit.• No single project shall exceed $7,000,000 in Total Budgeted Cost. • Every project in this Contract is subject to prevailing wage rate laws as detailed in the Contract General Conditions; the California Department of Industrial Relations will be monitoring the projects under this Contract for payment of prevailing wage rates. • The Trustees shall not guarantee a minimum volume of Task (service) Orders or Construction Agreements to be awarded as part of the TO-CA MEA. • The General Contractor shall be licensed in the State of California with a ‘B’ license, and the Architect on the General Contractor’s team shall be licensed to practice architecture in the State of California. Both General Contractor and Architect must be prequalified with the Capital Planning, Design and Construction Department of the CSU Office of the Chancellor.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS