Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Tavistock Drain 1979 – The Glasgow Warehouse Inc. Minor Improvement

Active
EZT-RFQ-26-01International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Corporation of the Township of East Zorra-Tavistock has issued Request for Quotation EZT-RFQ-26-01 for the realignment of a portion of the Tavistock Drain 1979 located at 47 Hope Street East. The scope of work involves the installation of 127 meters of HDPE pipe, consisting of 95 meters of 750mm diameter and 32 meters of 375mm diameter, along with four new structures and the removal of existing pipes and structures. The project must adhere to technical drawings provided by K. Smart Associates Limited and follow specific standard specifications for drainage construction. Work is expected to commence on or around October 19, 2026, following written instruction from the township. Bids must be submitted electronically via the designated bidding portal by October 14, 2026, at 2:00 PM local time. The award will be based on the subtotal provided in the schedule of items and prices. Mandatory submission requirements include a 12,000 dollar bid deposit, a valid WSIB Certificate of Clearance, a Commercial General Liability insurance certificate, and a completed AODA Contractor Compliance Statement. Additionally, the successful contractor must provide a health and safety policy and secure performance and labour and materials payment bonds, each equal to 50 percent of the total contract price. Payment for the work will be made net 30 days following the submission of invoices.

General Info

East Zorra-Tavistock RFQ for Tavistock Drain 1979 realignment; bids due October 14, 2026.

Documents

(3)

Attachment B - Standard Specifications (200 General Conditions)

PDF•specifications

EZT-RFQ-26-01: Tavistock Drain 1979 – The Glasgow Warehouse Inc. Minor Improvement

PDF•rfq

Tavistock Drain 1979 - Plan & Profile Drawing Set

PDF•specifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTownship of East Zorra-Tavistock
ContactsNo contacts available
OfficeCAN
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
This Request for Tender (the “RFT”) is an invitation by the Corporation of the Township of East Zorra-Tavistock (“East Zorra-Tavistock ”) to prospective Bidders to submit bids for the realignment of a portion of the Tavistock Drain 1979, located at 47 Hope Street East. The work consists of 127m of HDPE pipe (95m of 750mm dia. and 32m of 375mm dia.), four (4) new structures, and removal of the existing pipe and structures, as further described in Section A of the RFT Particulars (Appendix D) (the “Deliverables”).

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure effort managed by James W. Fowler Co. for the Metropolitan Water District of Southern California. The scope of work includes the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, along with the excavation of cobbles and large boulders. This solicitation is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a bid deadline of September 29, 2026. J.W. Fowler provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement, and encourages the use of apprentices on the project.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch ductile iron pipe water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place, along with the abandonment of existing mains. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for these quotations is October 19, 2026, at 1:00 PM. Eligible subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. The solicitation specifically encourages participation from DBE, MBE, WBE, and SBE firms, including the use of consortiums for larger contract portions. Selected subcontractors will be required to execute a standard subcontract agreement and meet general insurance requirements. Additionally, W.A. Rasic Construction Company may require payment and performance bonds totaling 100 percent of the subcontractor bid, with bond premiums reimbursed up to a maximum of 1.5 percent. Primary contact for this project is Matt Metoyer, Estimating Manager.
W.A. Rasic Construction Company

POSTED

about 12 hours ago

DEADLINE

in 22 days
View Details

More opportunities from Township of East Zorra-Tavistock

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS