Taylors Point Marina Dredge Project

Closed
BD-24-1247-ENG06-THALL-123313State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 11 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 17 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The Taylors Point Marina Dredge Project, solicited by the Town of Bourne, Massachusetts under solicitation number BD-24-1247-ENG06-THALL-123313, involves the removal of approximately 225 cubic yards of sediment from the approach channel at Taylors Point Marina to improve navigability and marina access. Contractors are given the option to use either a barge or a dewatering pit method for dredging and sediment handling. The project must be completed by January 15, 2025, unless an extension is granted. Bidders are required to submit sealed bids by December 18, 2025, with materials and detailed specifications becoming available on December 1, 2025. The anticipated contract award date is December 26, 2025. The place of performance is fixed at the Taylors Point Channel in Bourne, and inspection and acceptance of the work are expected to take place on-site under the oversight of the Town of Bourne. The solicitation does not provide specific contract clauses, pricing details, or evaluation criteria and lacks formal representations and certifications or socioeconomic status information. Administrative points of contact include Timothy Lydon, serving as the technical contact for inquiries, and Kathleen Thut, managing bid submissions at the Town of Bourne Administration Office. While the contract type is not explicitly defined, the procurement follows an Invitation for Bids (IFB) process under Massachusetts General Laws governing public contracting. Payment, invoicing instructions, and contracting officer designations have not been disclosed. Further technical requirements and exact performance standards referenced in the solicitation are available on the Town’s procurement website. The contract emphasizes timely completion and adherence to approved dredging methods but does not elaborate on packaging, shipping terms, or specific environmental compliance criteria within the provided documentation.

General Info

Dredging 225 cubic yards sediment at Taylors Point Marina, bid deadline December 18, 2025.

Place of Performance

Perry Avenue Buzzards Bay, MA, 02532, USA

Set-Aside

NONE

Documents

1

FY26 010 - Taylors Point Dredge - LEGAL NOTICE.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → Town of Bourne
Contacts1 person available
OfficePerry Avenue Buzzards Bay, MA, 02532, USA
Office AddressPerry Avenue Buzzards Bay, MA, 02532, USA
Contacts

Full Description

Show more
Dredge 225 cy of material in the approach to Taylors Point Marina in Bourne. Barge or dewatering pit option. Dredge operations must be complete by 1/15/2025 unless extended.

More opportunities from Massachusetts → Town of Bourne

Same awarding agency

SLED
Rec Shade Structures
Solicitation # BD-26-1247-TADMI-THALL-134480
The Town of Bourne is soliciting bids for the purchase and installation of cantilever shade structures and associated site furnishings, including ADA-accessible picnic tables, for three municipal recreation areas in Massachusetts. The contract will be awarded to the lowest responsible eligible bidder based on the base bid and any selected alternates. To be eligible, bidders must demonstrate financial stability, provide at least five references for similar projects completed within the last five years, and submit technical drawings in PDF format for evaluation. The project must be completed within 60 days of receiving the Notice to Proceed. The contractor is required to provide structural drawings and calculations sealed by a Professional Engineer licensed in Massachusetts and ensure all installations meet wind design criteria and ADA accessibility standards. Key financial requirements include a bid security of at least 5 percent of the bid price, and the successful bidder must furnish performance and payment bonds for 100 percent of the contract value. Payment is issued upon project completion, subject to a 5 percent retainage and the submission of certified weekly payroll records to ensure compliance with prevailing wage laws. Bidders must also provide OSHA certification and sign a combined certificate of compliance covering non-collusion, tax compliance, and labor harmony.

POSTED

14 days ago

DEADLINE

in 12 days
View Details
SLED
Taylors Point Dredge
Solicitation # BD-26-1247-TADMI-THALL-134253
The Town of Bourne is soliciting bids for the dredging of approximately 105 cubic yards of sediment at Taylors Point Marina in Buzzards Bay, Massachusetts. This open market solicitation, numbered BD-26-1247-TADMI-THALL-134253, requires the selected contractor to dredge, dewater, and dispose of sediment according to specific dredge limits. The contract will be awarded to the lowest eligible responsible bidder who meets the technical requirements and demonstrates a proven track record of satisfactory performance on at least five different contracts, with at least two being similar in size and scope to this project. The project is subject to strict regulatory and safety compliance, including adherence to USACOE Dredge Quality Management systems and Massachusetts General Law requirements for prevailing wages, labor harmony, and corporate disclosures. All employees must complete a 10-hour OSHA-approved construction safety course prior to starting work. Bidders must provide a bid security of at least 5 percent of the bid price, and the successful awardee must furnish performance and payment bonds for 100 percent of the contract amount. Payments are made monthly via itemized applications, subject to a 5 percent performance security retention and a 5 percent deduction for items painted in ground until final acceptance. All bids must remain firm for two months following the bid opening.

POSTED

21 days ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS