Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Technical Reporting and Documentation Services

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → San Diego County Water AuthorityView Agency

NAICS

541690 - Other Scientific and Technical Consulting ServicesView NAICS

Place of Performance

San Diego, CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260805031.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

As-Needed Specialty Field Support, Analysis And Engineering Services For Hydroelectric Turbine Generator Equipment

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego County Water Authority
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → San Diego County Water Authority
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Develop and format technical reports, test protocols, and performance summaries following Water Authority standards.

Similar Contracts

Same NAICS industry code

NAICS: 541690
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # C2305
The Elsinore Valley Municipal Water District (EVMWD) is soliciting proposals for the Corydon Well Replacement Project, which involves the professional design, bidding support, and engineering services required to replace and abandon the existing Corydon well in Wildomar, California. The project is divided into two primary phases: Phase 1 focuses on the drilling and construction of the new well and the abandonment of the old one, while Phase 2 covers the architectural, civil, mechanical, structural, electrical, and instrumentation design for equipping, testing, and commissioning the new groundwater production well. Funding is provided through District funds and a Department of the Interior Bureau of Reclamation WaterSMART Planning and Project Design Grant. TKE Engineering, Inc. is seeking qualified firms, specifically DBE, MBE, and WBE entities, providing hydrology/hydraulic consulting, structural and electrical engineering, geotechnical investigations, and utility potholing services. The contract is estimated at a total project cost of 2,260,788 dollars, though the specific professional services fee will be negotiated as a not-to-exceed limit. Proposals are due by 10:00 a.m. on September 1, 2026, via the PlanetBids Vendor Portal. Evaluation is based on a weighted scale prioritizing relevant qualifications and project approach (25% each), scope and schedule (20%), innovation (10%), cost (10%), and overall proposal quality (10%). Awarding is based on demonstrated competence rather than the lowest cost. The project must adhere to strict federal and state regulations, including the Build America Act, Buy America Preference, and California State Water Resources Control Board requirements. Administrative oversight includes monitoring by the Bureau of Reclamation, and payments for federal funds must be processed through the Automated Standard Application for Payments (ASAP) system.
TKE Engineering, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details

More opportunities from California → San Diego County Water Authority

Same awarding agency

NAICS: 238910
New
SLED
Subsurface Excavation Drilling Services For Cathodic Protection Anode Installation
Solicitation # 20260805032
The contract solicitation 20260805032 issued by the San Diego County Water Authority seeks subsurface excavation drilling services for the installation of cathodic protection anodes at a site in San Diego, California, with a performance deadline of December 31, 2026. The work involves completing one auger drill hole in strict accordance with specified plans and requirements under a lump sum fixed-price arrangement, with all work requiring execution in a workmanlike manner and full compliance with Cal/OSHA safety regulations, CARB emissions standards, California Contractor Licensing Law (Class C-57), and federal and state nondiscrimination statutes. Contractors must hold a valid C-57 license, designate a qualified on-site representative present during all work hours, and demonstrate at least five years of relevant experience. Compliance is enforced through mandatory submission of complete exhibits including a signed bid form, contractor questionnaire, subcontractor and vendor disclosures, fleet compliance certifications tied to California Air Resources Board regulations, and proof of insurance totaling $4 million general liability, $2 million auto liability, $2 million pollution legal liability, and workers’ compensation coverage as required by state law. Bonding requirements are explicitly referenced, though specific bond types and amounts are not detailed in the available materials. All proposals must be submitted electronically through the BidNet portal by the deadline of September 14, 2026, preceded by a mandatory pre-bid meeting on August 12, 2026, and site visits completed prior to submission. Invoices must be sent electronically to invoices.om@sdcwa.org and are subject to payment within 30 days of receipt. The Water Authority retains full authority to inspect, reject, or require corrections to non-compliant work at any time, including after initial acceptance, with all workmanship guaranteed for one year from final acceptance. No formal FAR clauses are listed, but the solicitation incorporates specialized requirements including permanent marking of well identification numbers, retention of material samples for 90 days for traceability, and detailed reporting obligations if exemptions are claimed for renewable diesel fuel usage. No contract value or CLINs are disclosed as the bid form remains unfilled, and financial tracking will rely on invoice substantiation rather than federal appropriation codes. The primary point of contact is Brian DiLuca, who serves as the administrative liaison, though no official COR, COTR, or PCO designations are provided.
Site Preparation Contractors

POSTED

6 days ago

DEADLINE

in about 1 month
View Details