Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

As-Needed Specialty Field Support, Analysis And Engineering Services For Hydroelectric Turbine Generator Equipment

Active
20260805031State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract solicits as-needed specialty field support, analysis, and engineering services for hydroelectric turbine generator equipment at facilities operated by the San Diego County Water Authority in San Diego County, California, with performance primarily at the Lake Hodges Pumped Storage and Hydroelectric Facility, Rancho Peñasquitos Pressure Control and Hydroelectric Facility, and Alvarado Hydroelectric Facility. The contract is structured as a professional services agreement with a three-year base term and an option to extend for two additional years, operating under a not-to-exceed ceiling of $150,000 through task orders issued as work is required. Proposals must be submitted electronically via BidNet by August 27, 2026, and must include an executive summary, detailed experience with similar projects, organization and key personnel resumes with California-licensed Professional Engineer credentials, and a cost proposal listing hourly rates and other direct costs. Award will be made through a trade-off process, prioritizing technical competence at 30%, followed by scope understanding, organization and schedule, past performance, subcontractor qualifications, and cost, with technical factors collectively accounting for 70% of the evaluation weight. Key personnel must be pre-approved, with no substitutions permitted without written consent, and must possess demonstrated experience on comparable hydroelectric and pumped storage projects. Contractors are required to maintain substantial insurance coverage, including $4 million general liability, $2 million professional liability (retained for five years post-completion), and workers’ compensation as mandated by California law, with policies that are primary and non-contributory. The use of artificial intelligence is strictly prohibited unless explicitly approved in writing, and even then, data upload into AI systems is forbidden, requiring encryption, secure network controls, and separate email infrastructure independent of the Water Authority. All deliverables—including engineering reports, as-built drawings, and test results—must be signed and sealed by a California-licensed PE and submitted in approved electronic formats, adhering to IEEE, IEC, ASME, ASTM, and OSHA standards. Subcontracting requires prior approval, and the prime contractor bears full responsibility for subcontractor compliance. The contract includes strict provisions against conflicts of interest, collusion, and unauthorized assignment, and mandates compliance with immigration laws and IRS travel reimbursement rates. Invoices must be submitted electronically as PDFs to a designated email, referencing task order numbers and detailed cost breakdowns, with no federal accounting codes applicable. Legal notices must be delivered via certified mail, overnight delivery, or email to the Water Authority’s Escondido

General Info

As-needed engineering services for hydroelectric turbines in San Diego, contract value $19, deadline August 27, 2026.

Agency

California → San Diego County Water AuthorityView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

San Diego, CA, USA

Set-Aside

NONE

Documents

(4)

SCOOP Schedule A-1: Designation of All Subcontractors (New Contract)

PDFcontract-document

RFP for Specialty Field Support and Engineering Services for Hydroelectric Equipment

PDFrfp

Exhibit A - Scope of Work for Hydroelectric Turbine Services

PDFsow

Exhibit B Sample Professional Services Contract - San Diego County Water Authority

PDFcontract-document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego County Water Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Diego County Water Authority
View Agency Profile
Office AddressN/A
Contacts
Suzan Fonseca

Full Description

Show more
$19

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms for the Corydon Well Replacement Project on behalf of the Elsinore Valley Municipal Water District. The project involves the design of a new municipal groundwater production well to replace and abandon the existing Corydon well in California. The scope is divided into two phases: Phase 1 focuses on technical specifications, civil site design, bidding assistance, and full-time on-site construction management; Phase 2 covers the architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping, testing, and commissioning the well. Key technical requirements include the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA, SWRCB-DDW, and DWR standards. The total estimated project cost is 2,260,788 dollars, which includes 2,000,000 dollars for construction, while the professional services fee will be negotiated with the selected firm. Award decisions are based on demonstrated competence and professional qualifications, with weighted factors including relevant experience (25%), project approach (25%), scope and schedule (20%), innovation (10%), cost (10%), and overall proposal quality (10%). Proposals must be submitted via the PlanetBids portal by September 1, 2026. The contract is subject to stringent federal and state regulations, including Build America Buy America (BABA) requirements, the Iran Contracting Act, and various non-discrimination and ethics clauses. Payment must be processed through the Department of Treasury Automated Standard Application for Payments (ASAP) system.
Ardurra Group, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project, managed by GEI Consultants, Inc. for the Elsinore Valley Municipal Water District in California, is a professional services engagement with a total estimated project cost of 2,260,788 dollars. The project is divided into two primary phases: Phase 1 focuses on the technical specifications, civil site design, and abandonment of the existing Corydon Well, including bidding assistance and full-time on-site construction management. Phase 2 involves the design, equipping, testing, and commissioning of the new groundwater production well, encompassing architectural, civil, mechanical, structural, electrical, and instrumentation and controls engineering. The project is partially funded by a Department of the Interior Bureau of Reclamation WaterSMART grant, requiring strict adherence to federal procurement standards, including the Build America, Buy America Act and 2 CFR Part 200. Qualified firms, including certified DBE and small businesses, are sought to provide a wide array of specialized services such as hydrogeology, geotechnical investigation, SCADA systems, and environmental permitting. The contract is governed by the laws of the State of California with venue in Riverside County. Key requirements for the selected consultant include providing a 100 percent performance and payment bond, maintaining specific commercial general liability and automobile insurance limits, and complying with California prevailing wage laws. Proposals must be submitted via the PlanetBids Vendor Portal by September 1, 2026, and will be evaluated based on the most advantageous terms, considering qualifications, experience, and pricing. Performance is scheduled to begin on November 2, 2026, with a final report due by January 28, 2028.
GEI Consultants, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
SLED
12A2404 A&E On-Call Traffic Operation and Traffic Management Planning Services, District 12
Solicitation # 12A2404
The California Department of Transportation (Caltrans) is soliciting Statements of Qualifications (SOQs) for an on-call contract to provide Architectural and Engineering (A&E) Traffic Operation and Traffic Management Planning Services within District 12. The estimated contract value ranges from $2,000,000 to $3,200,000 with an anticipated term of three years. Work will be assigned via individual task orders for specific locations throughout the district. The procurement follows a dual-phase evaluation process consisting of an initial technical screening of the SOQ, which accounts for 25% of the final score, followed by interviews involving an example task order presentation, technical scenario questions, and a closing statement. Qualified firms must submit their SOQs in strict accordance with Caltrans formatting guidelines, utilizing GSA SF330 forms and adhering to specific page limits for prime consultants and subconsultants. Key requirements include providing ten representative project examples, resumes for key personnel, and proof of registration with the California Department of Industrial Relations for prevailing wage compliance. While there is a 0% participation goal, firms claiming Disadvantaged Business Enterprise (DBE) or Disabled Veteran Business Enterprise (DVBE) status must provide the required ADM and DGS certification forms. Submissions must be delivered via mail or hand delivery to the Division of Procurement and Contracts in Sacramento by the specified deadline.
California Department of Transportation

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → San Diego County Water Authority

Same awarding agency

NAICS: 238910
New
SLED
Subsurface Excavation Drilling Services For Cathodic Protection Anode Installation
Solicitation # 20260805032
The contract solicitation 20260805032 issued by the San Diego County Water Authority seeks subsurface excavation drilling services for the installation of cathodic protection anodes at a site in San Diego, California, with a performance deadline of December 31, 2026. The work involves completing one auger drill hole in strict accordance with specified plans and requirements under a lump sum fixed-price arrangement, with all work requiring execution in a workmanlike manner and full compliance with Cal/OSHA safety regulations, CARB emissions standards, California Contractor Licensing Law (Class C-57), and federal and state nondiscrimination statutes. Contractors must hold a valid C-57 license, designate a qualified on-site representative present during all work hours, and demonstrate at least five years of relevant experience. Compliance is enforced through mandatory submission of complete exhibits including a signed bid form, contractor questionnaire, subcontractor and vendor disclosures, fleet compliance certifications tied to California Air Resources Board regulations, and proof of insurance totaling $4 million general liability, $2 million auto liability, $2 million pollution legal liability, and workers’ compensation coverage as required by state law. Bonding requirements are explicitly referenced, though specific bond types and amounts are not detailed in the available materials. All proposals must be submitted electronically through the BidNet portal by the deadline of September 14, 2026, preceded by a mandatory pre-bid meeting on August 12, 2026, and site visits completed prior to submission. Invoices must be sent electronically to invoices.om@sdcwa.org and are subject to payment within 30 days of receipt. The Water Authority retains full authority to inspect, reject, or require corrections to non-compliant work at any time, including after initial acceptance, with all workmanship guaranteed for one year from final acceptance. No formal FAR clauses are listed, but the solicitation incorporates specialized requirements including permanent marking of well identification numbers, retention of material samples for 90 days for traceability, and detailed reporting obligations if exemptions are claimed for renewable diesel fuel usage. No contract value or CLINs are disclosed as the bid form remains unfilled, and financial tracking will rely on invoice substantiation rather than federal appropriation codes. The primary point of contact is Brian DiLuca, who serves as the administrative liaison, though no official COR, COTR, or PCO designations are provided.
Site Preparation Contractors

POSTED

6 days ago

DEADLINE

in about 1 month
View Details