Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Part-Time Construction Inspection

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

A part-time construction inspection role is available for a two-month project under Public Works in Connecticut, requiring periodic field inspections to ensure adherence to approved plans during excavation, formwork, and accessibility compliance with ADA standards. The position is classified as a subcontract under NAICS code 541330, with a response deadline of August 27, 2026, and was posted on August 6, 2026. The inspections must be conducted with precision to confirm that all construction activities meet regulatory and design requirements, focusing specifically on structural and safety elements during the critical construction phase. The place of performance and contact details are not specified, but the work is tied to a project managed through the Berlin, Connecticut public works jurisdiction, accessible via the provided online portal.

General Info

Part-time construction inspection role in Connecticut, two months, ADA compliance, field inspections during excavation and formwork.

Agency

Connecticut → Public WorksView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CT, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConnecticut → Public Works
ContactsNo contacts available
OfficeN/A
Organization / Agency
Connecticut → Public Works
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Conduct periodic field inspections during the 2-month construction phase to verify compliance with plans, focusing on excavation, formwork, and ADA requirements.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms to provide comprehensive design, bidding support, and engineering services during construction for the Corydon Well Replacement Project, a municipal groundwater well initiative in California to replace and decommission the existing Corydon well. The project is divided into two phases: Phase 1 focuses on civil site design, technical specifications, line-bid items for drilling and abandonment, and full-time on-site construction management oversight compliant with Riverside County and California State Water Resources Control Board requirements; Phase 2 involves detailed architectural, structural, mechanical, electrical, and instrumentation and controls design for equipping, testing, and commissioning the new well. Key technical specifications require a 24-inch stainless steel Ful-Flo louvered screen matching the existing casing depth, vertical turbine pump equipment, and discharge piping tied to the Corydon Blend station and Malaga blending location, all in accordance with AWWA, SWRCB-DDW, DWR, and EVMWD standards. Proposals must include a Preliminary Design Report with up to 30% design effort, review of approximately 200 submittals, assistance with a Domestic Water Supply Permit Amendment, and record drawing development along with commissioning and operator training support. The solicitation is structured as a Request for Proposals with evaluation weighted toward demonstrated competence and professional qualifications, where relevant experience and team qualifications account for 25%, understanding of project scope and approach for another 25%, scope and schedule feasibility for 20%, innovation for 10%, cost value for 10%, and overall proposal quality for 10%. Cost is not the sole determinant; the highest-ranked firm will be negotiated with for a mutually agreeable scope and fee, with a not-to-exceed dollar limit expected. Respondents must submit all required certifications and forms through Attachment “2”, including American Iron and Steel Certification, Debarment and Suspension Certification, System for Award Management (SAM) Information, Conflict of Interest Disclaimer, Insurance Acknowledgment, Public Works Registration, and Executive Order N-6-22 Certification for Russia sanctions compliance. Subcontractors must be identified and their DBE status documented, along with explanations if not selected. The proposal must conform to Build America Buy America Act requirements, including sourcing documentation and waiver procedures for non-compliant materials, and adhere to telecommunications restrictions under Section 889, prohibiting Huawei and ZTE equipment. Proposals must be submitted via the PlanetBids
Ardurra Group, Inc.

POSTED

about 4 hours ago

DEADLINE

in 26 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project entails the design, construction support, and comprehensive engineering services required to replace the existing Corydon groundwater production well with a new facility while permanently abandoning the old well in full compliance with California State Water Resources Control Board and Riverside County regulations. The scope includes hydrogeological evaluation, aquifer analysis, municipal well design, borehole geophysical logging, site civil and structural engineering, utility coordination, environmental permitting, water quality sampling, and full-time construction management during the drilling phase, followed by engineering oversight during the well equipping and commissioning phase. Technical specifications mandate a 24-inch diameter stainless steel Ful-Flo louvered well screen matching the existing casing depth, with sanitary seal placement consistent with AWWA standards. The project is divided into two phases: Phase 1 focuses on technical specifications, civil design, line-bid items, bidding support, and on-site construction management, while Phase 2 covers architectural, mechanical, electrical, instrumentation, and controls design for final facility equipping. All work must adhere to the Build America, Buy America Act and 2 CFR Part 184, requiring domestic sourcing of iron, steel, and manufactured products, along with rigorous certification and documentation of origin. The project is funded by a $400,000 Bureau of Reclamation grant and non-Federal cost share, subjecting it to the full scope of federal compliance requirements including 2 CFR Part 200, Davis-Bacon, Clean Air Act, and Federal Water Pollution Control Act provisions, which must be flowed down to subconsultants exceeding $150,000. Proposals must include detailed cost breakdowns by task, hourly rates, travel expenses, and a not-to-exceed total fee capped at $1,000,000, submitted via the PlanetBids portal by September 1, 2026, with mandatory certifications for debarment status, SAM registration, executive order N-6-22 compliance, lobbying restrictions, insurance, conflict of interest, and DBE subcontractor participation. Evaluation prioritizes demonstrated qualifications and project experience (25%), technical understanding and approach (25%), schedule and scope clarity (20%), innovation (10%), cost value (10%), and overall proposal quality (10%), with award based on competence rather than lowest price. Successful contractors must maintain accurate records for four years post-final payment, submit monthly itemized invoices with progress reports, and adhere to a project timeline running from November
GEI Consultants, Inc.

POSTED

about 4 hours ago

DEADLINE

in 26 days
View Details

More opportunities from Connecticut → Public Works

Same awarding agency