Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Technology Drive and Ada Recycled Water Pipeline Replacement

Closed
12979State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The project involves the removal of an existing 6-inch AC recycled water pipeline and the installation of a new 6-inch PVC recycled water pipeline at key intersections along Technology Drive, specifically where it crosses Alton Parkway and Ada Street between Alton Parkway and Barranca Parkway. The scope includes connecting the new pipeline to the existing distribution system to ensure continued service to customers, along with minor excavation, trenching, and backfilling activities. The work also encompasses landscape and hardscape restoration once the pipeline installation is complete. Approximately 4,600 linear feet of trenching will be performed at depths ranging from 6 to 12 feet, with trenches about 2 feet wide, and backfilled using native soil. Additionally, the project includes the application of slurry seal pavement over an area of roughly 137,300 square feet to restore the surface after construction. The contract, titled "Technology Drive and Ada Recycled Water Pipeline Replacement," was posted on June 16, 2025, with a response deadline of July 10, 2025. It is managed by the Irvine Ranch Water District in California and is valued between 1.5 million and 3 million dollars. The project aims to improve recycled water infrastructure, ensuring reliable service and system integrity. Interested contractors can contact the primary point of contact, Brian Ige, via email or phone for additional details.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Irvine Ranch Water District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The proposed project includes the abandonment of the 6-inch AC recycled water pipeline and installation of new 6-inch PVC recycled water pipe where Technology Drive intersects Alton Parkway and Ada between Alton Parkway and Barranca Parkway. The proposed work also includes appurtenances to reconnect to the distribution system and service customers, in addition to minor excavation, trenching, and backfilling. Restoration of landscape and hardscape will be performed by the contractor towards the end of the project. Approximately 4,600 LF of soil would be trenched 6 to 12 feet deep, 2 feet wide and then backfilled with native soil. Approximately 137,300 square feet of slurry seal pavement will be included.

More opportunities from California → Irvine Ranch Water District

Same awarding agency

NAICS: 237990
SLED
Syphon Reservoir Improvement Project
Solicitation # 2019080009
The Syphon Reservoir Improvement Project, managed by the Irvine Ranch Water District in Orange County, California, involves replacing an existing 59-foot engineered dam with a new 138-foot dam. This upgrade will increase the recycled water storage capacity from 500 to 5,000 acre-feet, with the dam crest elevation rising to 468 feet above mean sea level. Key infrastructure components include a new spillway to prevent overtopping, a seepage control drainage system, a circulation and aeration system, and the demolition and expansion of strainer and disinfection facilities for filtration, chlorination, and de-chlorination. The project also includes the construction of new onsite access and maintenance roads. All construction must meet or exceed the safety and design requirements of the California Department of Water Resources, Division of Safety of Dams. Environmental compliance is a critical component of the project, as it requires adherence to the NPDES General Permit for stormwater runoff and the implementation of a Stormwater Pollution Prevention Plan. Additionally, the project is subject to an Incidental Take Permit from the California Department of Fish and Wildlife due to the permanent removal of 64.21 acres and temporary impact on 26.76 acres of Crotch's bumble bee habitat. Mitigation measures, including worker education and habitat preservation, have been established to ensure impacts to this candidate species remain below significance.
Other Heavy and Civil Engineering Construction

POSTED

11 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS