Syphon Reservoir Improvement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Syphon Reservoir Improvement Project, managed by the Irvine Ranch Water District in Orange County, California, involves replacing an existing 59-foot engineered dam with a new 138-foot dam. This upgrade will increase the recycled water storage capacity from 500 to 5,000 acre-feet, with the dam crest elevation rising to 468 feet above mean sea level. Key infrastructure components include a new spillway to prevent overtopping, a seepage control drainage system, a circulation and aeration system, and the demolition and expansion of strainer and disinfection facilities for filtration, chlorination, and de-chlorination. The project also includes the construction of new onsite access and maintenance roads. All construction must meet or exceed the safety and design requirements of the California Department of Water Resources, Division of Safety of Dams. Environmental compliance is a critical component of the project, as it requires adherence to the NPDES General Permit for stormwater runoff and the implementation of a Stormwater Pollution Prevention Plan. Additionally, the project is subject to an Incidental Take Permit from the California Department of Fish and Wildlife due to the permanent removal of 64.21 acres and temporary impact on 26.76 acres of Crotch's bumble bee habitat. Mitigation measures, including worker education and habitat preservation, have been established to ensure impacts to this candidate species remain below significance.

General Info

Irvine Ranch Water District upgrading Syphon Reservoir dam to increase recycled water storage.

Agency

California → Irvine Ranch Water District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Irvine, CA

Set-Aside

NONE

Documents

(4)

Syphon Reservoir Improvement Project Addendum No. 3 Notice of Determination

PDFaddendum

Addendum No. 3 to Syphon Reservoir Improvement Project FEIR

PDFaddendum

2081-2025-033-05 Syphon Reservoir CEQA Findings and Addendum

PDFceqa-findings-addendum

2081-2025-033-05 Syphon Reservoir Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Irvine Ranch Water District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Irvine Ranch Water District
Office AddressN/A
Contacts
Jennifer TurnerSenior Environmental Scientist (Supervisory)
Fiona NyeAssistant Director of Water Policy

Full Description

Show more
This proposed project involves replacing the existing 59-foot engineered dam at Syphon Reservoir with a new 138-foot engineered dam, to increase the recycled water storage capacity from the current 500 acre-feet to a total of 5,000 acre-feet. The new dam will include a spillway to protect the reservoir from overtopping, as well as a seepage control drainage system, and a circulation/aeration system for the reservoir. The Project will result in impacts to 90.97 acres of Crotch’s bumble bee (Bombus crotchii) habitat including temporary impacts to 26.76 acres; the Project will permanently remove 64.21 acres of Crotch’s bumble bee habitat. The project is expected to result in incidental take of Crotch’s bumble bee, which is designated as a candidate species under the California Endangered Species Act. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 14 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 15 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS