Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

LWCF Grant - Lower Reservoir Park Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of St. Helena is undertaking a public park enhancement project at its decommissioned water reservoir site located at 2800 Spring Mountain Road, St. Helena, California, under the Land and Water Conservation Fund (LWCF) Grant program. The project focuses on adapting existing infrastructure for public use without new major construction, including upgrades to ADA-compliant parking stalls, maintenance and improved connectivity of walking trails, repair or removal of chain link fencing, installation of signage and trash receptacles, addition of shade structures, and remodeling of existing bathroom facilities to meet public accessibility and safety standards. All work is designed to comply with the California Environmental Quality Act through categorical exemptions under Sections 15301, 15302, and 15304, which classify the project as minor alterations to existing land, replacement of facilities, and use of existing infrastructure. The City's Public Works Department serves as the lead agency and project administrator, with Joseph Leach, P.E., as the primary point of contact for oversight, and Mario Traverso as the Project Manager available for direct inquiries. No formal contract value, pricing details, or procurement methodology such as LPTA or best value trade-off have been specified, as this is a forecasted grant-funded initiative rather than a competitive solicitation. The project site in St. Helena is the sole location for performance and acceptance, with inspection and approval responsibilities held by the City. No federal acquisition regulation clauses, special contract requirements, key personnel mandates, payment systems, invoicing procedures, or packaging specifications are outlined, reflecting the project’s status as a municipal grant-driven improvement with limited formal procurement structure. Deliverables will result in a fully accessible, safe, and functional public recreational space managed by the City of St. Helena.

General Info

St. Helena enhances decommissioned reservoir into ADA-compliant public park using existing infrastructure through LWCF grant.

Agency

California → City of St. Helena

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Spring Mountain Road, St. Helena, CA, 94574

Set-Aside

NONE

Documents

(1)

Lower Reservoir Park Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of St. Helena
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of St. Helena
Office AddressN/A
Contacts
Mario TraversoProject Manager

Full Description

Show more
The project will upgrade existing facilities located at the City's decommissioned water reservoir to be made available to public use which includes ADA parking stall upgrade, walking trail maintenance, walk trail connectivity, chain link fence repair and removal, sign installations, trash receptacle installations, shade structure installations, and bathroom remodel.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details