Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

TEE, PIPE

Active
SPE7M3-27-T-0173Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation SPE7M3-27-T-0173, issued by the DLA Weapons Support Fluid Handling Division, is a request for quotations for eight straight pipe tees. The items must be manufactured from 70/30 CUNI material with a 1/2 inch nominal pipe size and socket weld ends, adhering to basic drawing NR 53711 6397430 Revision A. A metal casting process is identified for production, requiring specific tooling. Quality assurance mandates that one sample of each type and size be radiographed per MIL-STD-278 and pressure tested to a minimum of 1600 PSI for 15 seconds without leakage or distortion. The contract specifies inspection and acceptance at the origin, with manufacturer inspection systems required to comply with SAE AS9003 or ISO 9001 tailored to SAE AS9003. Delivery is required within 202 days, with a need ship date of May 10, 2027, and a final required delivery date of October 31, 2027, shipped FOB Origin to DLA Distribution Norfolk, VA. Packaging must follow ASTM D3951 and MIL-STD-129, while palletization must comply with DLA requirement RP001. The procurement is open to full and open competition, with a price evaluation preference available for SBA-certified HUBZone Small Business Concerns.

General Info

NAICS

332996 - Fabricated Pipe and Pipe Fitting Manufacturing

Place of Performance

1968 GILBERT ST BLDG W143 DWY 17, NORFOLK, VA, 23511-0001, USA

Set-Aside

NONE

Documents

1

RFQ SPE7M3-27-T-0173

PDF, High priority: read this first19 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 19, 2026 to Oct 22, 2026.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → DLA WEAPONS SUPPORT FLUID HANDLING DIVISION
Contacts1 person available
OfficeUSA

Full Description

Show more
TEE,PIPE
TEE, PIPE. 70/30 CUNI MATERIAL, 1/2 INCH NOMINAL PIPE SIZE, SOCKET WELD
ENDS, STRAIGHT TEE<(>,<)>
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RQ002: CONFIGURATION CHANGE MANAGEMENT ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
A metal casting process was identified as a means to manufacture this item. Tooling is required to produce a casting. For sourcing, tooling, materials or other information, please contact the appropriate assistance team: (Aviation, C<(>&<)>E Supply Chains) https://www.dla.mil/Aviation/Offers/Engineering/Forging-and-Casting/; (Land & Maritime Supply Chains) DSCC.cast.forge@dla.mil. RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RT001: MEASURING AND TEST EQUIPMENT
The following Contract Data Requirements Lists (CDRLs), DD Form 1423s, apply to this procurement. Review the Technical Data Package (TDP) for additional information.
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE
USED NOR INCORPORATED IN ANY ITEMS TO BE
DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION
SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT
DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS.
SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR
APPROVAL UNLESS THEY ARE AUTHORIZED BY THE
SPE7M3-27-T-0173
SECTION B
SPECIFICATION REQUIREMENTS.
NOTE 4.5 OF DRAWING 803-6397430 SHOULD READ AS
FOLLOWS: FOR CAST FITTINGS, ONE SAMPLE OF EACH
TYPE AND SIZE OF FITTING SHALL BE RAIDOGRAPHED
IN ACCORDANCE WITH MIL-STD-278, AND PRESSURE
TESTED TO A MINIMUM OF 1600 PSI FOR A MINIMUM
OF 15 SECONDS WITHOUT LEAKAGE OR VISIBLE
DISTORTION OF THE FITTING. CERTIFICATION OF
PREVIOUS SUCCESSFUL COMPLETION OF SAME SHALL BE
SUFFICIENT FOR ANY PROCUREMENT PROVIDED THE
MANUFACTURER CERTIFIES THAT THE CASTING PROCESS
HAS NOT BEEN MODIFIED.
FULL AND OPEN COMPETITION APPLY
"STANDARD"
A metal casting process was identified as a means to manufacture this item. Tooling is required to produce a casting. For sourcing, tooling, materials or other information, please contact the appropriate assistance team: (Aviation, C<(>&<)>E Supply Chains) https://www.dla.mil/Aviation/Offers/Engineering/Forging-and-Casting/; (Land & Maritime Supply Chains) DSCC.cast.forge@dla.mil.
TDP Rev A Gen 1 IAW BASIC DRAWING NR 53711 6397430 REVISION NR A DTD 04/02/2013 PART PIECE NUMBER: 6397430 1/2IN70/30CUNISW STR T
TDP Rev A Gen 1 IAW REFERENCE QAP 13873 CDRLCOQC26124 REVISION NR DTD 12/04/2025 PART PIECE NUMBER:
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7018663892 0001 EA 8.000
NSN/MATERIAL:4730014208659
DELIVERY (IN DAYS):0202
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: ORIGIN
ACCEPTANCE POINT: ORIGIN
PREP FOR DELIVERY:
PKGING DATA-QUP:001
WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be
SPE7M3-27-T-0173
SECTION B
PR: 7018663892 PRLI: 0001 CONT’D
as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
SW3117
DLA DISTRIBUTION NORFOLK VA
RECEIVING/SHIPPING DDNV P
1968 GILBERT ST BLDG W143 DWY 17
NORFOLK VA 23511-0001
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE
C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
SW3117
DLA DISTRIBUTION NORFOLK VA
RECEIVING/SHIPPING DDNV P
1968 GILBERT ST BLDG W143 DWY 17
NORFOLK VA 23511-0001
US
Need Ship Date:05/10/2027 Original Required Delivery Date:10/31/2027
SPE7M3-27-T-0173 NSN/Part Number: 4730-01-420-8659 Quantity: 8 EA Purchase Request: 7018663892QTY: 8 Delivery: 202 days ADO

Similar Contracts

Same NAICS industry code

NAICS: 332996
New
DIBBS
ADAPTER, STRAIGHT, TUBE
Solicitation # SPE7M2-27-T-0272
This procurement, issued by the DLA Weapons Support Nuclear Reactor Program under solicitation SPE7M2-27-T-0272, is for the acquisition of 116 units of a straight tube-to-hose adapter. The item is designated as a critical application item, featuring stainless steel material with a 0.750 inch OD tube size and a 1-1/16-12-2B thread on the swivel nut, designed for use with 0.64 inch ID and 0.760 inch OD hoses. The specific part number is Danfoss Power Solutions II, LLC 190600-12C, associated with NSN 4730004204494. Delivery is required within 157 days, with a need ship date of April 6, 2027, and an original required delivery date of June 5, 2027. The shipping terms are FOB Origin, with the final destination being DLA Dist San Joaquin in Tracy, California. The contract mandates strict adherence to technical and quality requirements via RA001 and DLA packaging standards RP001 and MIL-STD-2073-1E, while marking must comply with MIL-STD-129. A critical material restriction prohibits the intentional addition of mercury or mercury-containing compounds. Inspection and acceptance will occur at the destination per FAR 52.246-2. Administrative requirements include electronic invoicing through the Wide Area Workflow system and compliance with various FAR and DFARS clauses, including the Buy American Act, safeguarding of covered defense information, and prohibitions on certain telecommunications equipment. All quotes must be submitted through the DLA Internet Bid Board System.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

about 22 hours ago

DEADLINE

in 10 days
View Details
NAICS: 332996
New
DIBBS
ELBOW, TUBE TO HOSE
Solicitation # SPE7M4-27-T-1431
Solicitation SPE7M4-27-T-1431 is a fixed-price procurement issued by the DLA Weapons Support Fluid Handling Division for 65 units of a tube-to-hose elbow (NSN 4730-00-580-6453). This critical application item is used on the Boeing Vertol Cargo Transport Helicopter, Model CH-47. The hardware must be manufactured from aluminum alloy with an anodized finish, featuring a 90-degree flow angle, a 1-inch O.D. tube size with a female threaded swivel nut flared to a socket hose fitting end. Compliance with Class 3 threads and the Qualified Products List or Qualified Manufacturers List is required. Additionally, the use of Class I ozone-depleting chemicals is strictly prohibited. The contract specifies a delivery timeframe of 96 days, with a need ship date of October 6, 2026, and a required delivery date of November 20, 2026. Delivery is FOB Origin, with the destination for inspection and acceptance being DLA Distribution Cherry Point in North Carolina. Packaging must adhere to MIL-STD-129 and RP001 requirements, with DLA Master List technical requirements taking precedence over ASTM D3951. Administrative requirements include electronic invoicing via Wide Area WorkFlow and compliance with the Buy American Act and Berry Amendment for domestic sourcing. The procurement is conducted under full and open competition under NAICS code 332996.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 22 hours ago

DEADLINE

in 10 days
View Details

More opportunities from Department Of Defense → DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS