The City of Hallandale Beach is seeking qualified firms to perform a comprehensive telemetry system upgrade for its Public Works Department. The project involves replacing existing Remote Telemetry Units (RTUs) and control panels at multiple sites, including fabricating new control panels, conducting factory testing with a Professional Engineer’s oversight, and removing the old equipment. The scope also encompasses installing new field instruments, conduit, and wiring to connect the new panels with field devices, followed by testing and commissioning of the upgraded systems in collaboration with the City’s designated programmer. The work requires electrical, instrumentation, and control system expertise, with an estimated contract value ranging from $500,000 to $1,500,000. The solicitation was posted on June 12, 2025, with a response deadline of July 21, 2025, and is open to all qualified firms under NAICS code 334290. Interested parties can find additional details and submit bids through the provided DemandStar link.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The work to be performed includes electrical, and Instrumentation and Controls (I&C) work associated with replacing existing Remote Telemetry Units (RTU) and control panels with new control panels at the respective sites inclusive of, but not limited to:
1. Fabricate new telemetry panel or control panel (depending on the site) with all devices, components, and panel layout as shown and specified. 2. Factory test RTU and control panels, witnessed by a Professional Engineer (PE), prior to shipment. 3. Disconnect existing conduit and wiring from the telemetry panel or control panel (depending on the site) and remove and demolish existing panel at each site. 4. Install new telemetry panel or control panel (depending on the site) at each site and reinstall existing conduit and wiring to the new panel. 5. Install new field instruments at each site. 6. Install new conduit and wiring between new panel and new field devices at each site. 7. Test and startup the new telemetry panel or control panel (depending on the site) and new instrumentation at each site jointly with OWNER assigned programmer.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS