Temescal Canyon Road Widening Project- El Cerrito Segment

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of Riverside Transportation Department, in coordination with Caltrans, is advancing the Temescal Canyon Road Widening Project—El Cerrito Segment to expand a two-lane road to four lanes with a centered two-way left-turn lane and pedestrian sidewalks, stretching from north of El Cerrito Road to Tom Barnes Street, including a 200-foot extension north of Cajalco Road within the unincorporated community of El Cerrito and the city of Corona, California. The primary objective is to reduce congestion caused by growing regional traffic and overflow from I-15 during peak periods, while creating a complete street that accommodates all users, including pedestrians, bicyclists, motorists, and transit riders. Construction is scheduled to begin in 2026 with an estimated duration of 16 months, concluding around April 2027, followed by 90 days of post-construction closeout activities. The project is not tied to a stated contract value, as no formal CLIN structure or pricing table is provided, and the solicitation is marked as a forecast with no established award mechanism or source selection criteria. Environmental compliance and mitigation are central to the project’s execution, with all activities governed by California’s CEQA requirements and reinforced by a suite of project-specific mitigation measures rather than standard FAR clauses. Key environmental controls include the implementation of a Stormwater Pollution Prevention Plan, sediment and erosion controls compliant with RWQCB standards, pre-construction equipment cleaning to prevent invasive species spread, and strict limitations on work near sensitive habitats such as riparian zones and oak trees to protect root systems and wildlife breeding seasons. A qualified biologist must be retained by the contractor to conduct site inspections, train construction personnel, approve work plans, and oversee all biological protections, including monitoring for endangered species and managing waste to deter predators. Inspections occur on-site throughout construction, with acceptance dependent on compliance with Caltrans specifications, the Multi-Species Habitat Conservation Plan, the Endangered Species Act, ADA accessibility standards, and various BMPs. No formal contract administration roles such as COR, COTR, or PCO are designated, and payment, invoicing, accounting, or packaging requirements typical of federal contracts are absent; the only identified contact for coordination is the Environmental Project Manager, Jan Bulinski, through the County’s transportation department. There is no evidence of procurement-specific sections such as evaluation factors, offeror certifications, or solicitation submission instructions, as the documentation is rooted entirely in environmental planning and regulatory compliance rather than competitive bidding.

General Info

Riverside County to widen Temescal Canyon Road to four lanes starting 2026, with environmental and habitat protections, no stated contract value.

Agency

California → Riverside County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Corona, CA

Set-Aside

NONE

Documents

(2)

E-202501029 Notice of Determination CEQA Filing Fee Receipt

PDFnotice-of-determination

Temescal Canyon Road Widening Project Final Initial Study with Mitigated Negative Declaration

PDFmitigated-negative-declaration

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts
Jan BulinskiEnvironmental Project Manager
Lisa WadleyAssociate Transportation Planner

Full Description

Show more
The County of Riverside Transportation Department (County), in cooperation with the California Department of Transportation (Caltrans), is proposing to widen Temescal Canyon Road from two lanes to four lanes from north of El Cerrito Road to Tom Barnes Street, along with a 200-foot segment north of Cajalco Road, in the unincorporated community of El Cerrito in Riverside County and the city of Corona, California. A two-way left-turn lane and sidewalks would be included. The purpose of the Project is to alleviate congestion resulting from increased regional traffic as well as overflow traffic from I-15 during peak hours and provide a complete street to serve pedestrians, bicyclists, motorists, and transit riders of all abilities.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 18 hours ago

DEADLINE

in 24 days
View Details