Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

Temperance River Road Improvements

Active
AG-63A9-S-16-0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract amendment addresses necessary corrections to sections 103 and 156 of the project specification for the Temperance River Road Improvements. Additionally, it clarifies inconsistency in the package header: the first seven pages correctly title the project as "Temperance River Road Improvements," whereas the following pages mistakenly reference "Superior National Forest Temperance River Bridge Superstructure Replacement." The amendment ensures the header is consistent throughout the document to accurately reflect the road improvement project. The solicitation, identified by number AG-63A9-S-16-0011, was posted on May 11, 2016, and is designated as a Total Small Business Set-Aside under FAR 19.5. The contract falls under NAICS code 237310, which pertains to construction management and related services, and is issued by the Department of Agriculture through the Superior National Forest office based in Duluth, Minnesota. The work is to be performed in Tofte, Minnesota. The contracting officer responsible for the solicitation is Clark A. Bartelt, who can be contacted via email or phone for further information.

General Info

Amends Temperance River Road Improvements contract correcting sections and standardizing project header.

Agency

Department Of Agriculture → Superior National ForestView Agency

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

Tofte Ranger District 7355 West Highway 61, TOFTE, MN, 55615, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

2 updates
PhaseSolicitation
Amendment 1

Contract was updated

Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Amendment 3

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Superior National Forest
Contacts1 person available
OfficeDULUTH, MN, 55808, USA
Organization / Agency
Department Of Agriculture → Superior National Forest
View Agency Profile
Office AddressDULUTH, MN, 55808, USA
Contacts
Clark A. BarteltContracting Officer

Full Description

Show more
The purpose of this amendment is to incorporate corrections for sections 103 and 156 of the specification, see attachment. Also, a clarification regarding the pachage header, the header reads "Temperance River Road Improvements" on the first 7 pages and should read the same on the follwing pages, not "Superior National Forest Temperance River Bridge Superstructure Replacement".

Similar Contracts

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in 2 months

DEADLINE

in 2 months
View Details