Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Temporary Bridge and HDPE Culvert Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the installation of temporary stream crossings and permanent drainage culverts for prime contractors working on projects for the Pennsylvania Department of Conservation and Natural Resources Bureau of Forestry, Silviculture Section. The scope of work requires the installation of three temporary skid trail bridges and seven HDPE corrugated pipe culverts, which range from 12 to 15 inches in diameter and 20 to 60 feet in length. The primary objective is to ensure proper water passage and road stability through the use of specialized excavation equipment. All installations are subject to final approval by the district forester to ensure compliance with project standards. Interested parties should note that the response deadline for this opportunity is December 9, 2026.

General Info

Install temporary stream crossings and permanent drainage culverts by December 9, 2026.

Documents

This scope was carved out of 042026BC01.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

04-2026BC01 - Jones Mill Run

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPennsylvania Department of Conservation and Natural Resources Bureau of Forestry, Silviculture Section
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs temporary stream crossings and permanent drainage culverts for prime contractors on PA DCNR Bureau of Forestry projects. Installs 3 temporary skid trail bridges and 7 HDPE culverts ranging from 12" to 15" in diameter and 20' to 60' in length. Utilizes excavation equipment and HDPE corrugated pipe. Installation must be approved by the district forester. Delivers installed bridges and culverts providing water passage and road stability.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 18 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 20 hours ago

DEADLINE

in about 1 year
View Details

More opportunities from Pennsylvania Department of Conservation and Natural Resources Bureau of Forestry, Silviculture Section

Same awarding agency

NAICS: 113310
New
SLED
04-2026BC01 - Jones Mill Run
Solicitation # 042026BC01
The Pennsylvania Department of Conservation and Natural Resources Bureau of Forestry is soliciting a Tree Estimate Timber Stumpage Sale for 140 acres located in Jefferson Township, Somerset County, Pennsylvania. The sale is divided into sixteen blocks and consists of approximately 2169.91 MBF of mostly Red Oak and 356.34 HCF of mostly Red Maple and Northern Hardwood pulp. The contract will be awarded to the highest qualified bidder, provided they meet the statewide Contractor Responsibility Program requirements and conform to Pennsylvania non-discrimination regulations. Bidders must submit electronically signed bids via Bid Express by December 9, 2026, accompanied by a 10,000 dollar bid deposit. The scope of work requires the buyer to perform significant infrastructure and site maintenance, including the installation of three temporary skid trail bridges, 32 broad based dips, six stone headwalls, and six stone endwalls. The buyer is also responsible for procuring and installing various HDPE culverts, 8 rolls of non-woven geotextile, and over 2,100 tons of limestone (including #3, ZRC, and ZA varieties), as well as seeding and mulching approximately 4 acres of disturbed areas. Operational restrictions prohibit hauling and skidding from November 16 to April 1. On-site crew leaders must be trained under the Pennsylvania Sustainable Forestry Initiative, and strict marking protocols using specific paint colors must be followed to distinguish between trees to be felled and reserved trees.
Logging

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS