Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Temporary Bypass Pumping

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the supply and operation of temporary bypass pumping systems for prime contractors working on City of Turlock water quality facility projects. The scope of work focuses on bypassing peak flows from Influent Pump Station No. 1 to Primary Flotator No. 3 effluent to prevent sewer backups. This operation requires the deployment of high-capacity pumps, temporary piping, and monitoring equipment to ensure continuous flow bypass throughout the construction window. The project is managed by the Municipal Services-Engineering agency in California under NAICS code 238990. The solicitation was posted on November 24, 2026, with a response deadline of December 21, 2026. There is no specified set-aside status for this procurement.

General Info

Documents

This scope was carved out of 2027-RFP-006.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction Management Services for TRWQCF Primary Flotator Improvements Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 27 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 5 documents on the prime contractFrom Construction Management Services for TRWQCF Primary Flotator Improvements Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Municipal Services-Engineering
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and operates temporary bypass pumping systems for prime contractors on City of Turlock water quality facility projects. Bypasses peak flows from Influent Pump Station No. 1 to Primary Flotator No. 3 effluent to prevent sewer backup using high-capacity pumps, temporary piping, and monitoring equipment. Delivers continuous flow bypass during the construction window.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additionally, the project includes the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, and the installation of platforms and access improvements. Civil works such as excavation, trenching, and surveying of key points around the reactors are also required. The estimated contract value ranges between 18.5 million and 19.5 million dollars, with a bid opening date of December 2, 2026. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Ranger Pipelines Incorporated is soliciting quotes from certified DBE, DVBE, and SBE subcontractors for specialized services including coating, concrete rehabilitation, electrical work, and welding.
Ranger Pipelines Incorporated

POSTED

about 5 hours ago

DEADLINE

in 7 days
View Details

More opportunities from California → Municipal Services-Engineering

Same awarding agency

NAICS: 541330
New
SLED
Construction Management Services for TRWQCF Primary Flotator Improvements Project
Solicitation # 2027-RFP-006
The City of Turlock is soliciting proposals for comprehensive construction management services for the Turlock Regional Water Quality Control Facility Primary Flotator Improvements Project. This project involves the rehabilitation of flotation clarifiers, air delivery systems, electrical motor control centers, sludge pumping systems, and associated infrastructure due to asset age and corrosive environmental conditions. The selected consultant will be responsible for project administration, quality assurance, and compliance oversight, including the provision of materials testing and special inspections by NACE/SSPC certified personnel. The project is funded through local sources and will be supported by Carollo Engineers as the engineer of record. The procurement process uses a points-based evaluation system where price is a factor but not the sole consideration. Proposals must be submitted electronically via the City's eProcurement Portal and include qualifications, methodology, three municipal references, and a detailed fee proposal. Key contract requirements include adherence to California Labor Code prevailing wage rates, the provision of performance and payment bonds, and compliance with ADA and California Building Code standards. The anticipated contract approval date is February 23, 2027, with work performed at the Turlock Regional Water Quality Control Facility. There is no specified set-aside status for this solicitation.
Engineering Services

POSTED

about 20 hours ago

DEADLINE

in 26 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS