Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Massachusetts was posted on December 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Temporary Erosion Control

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
SLED
FY2 7-08 ICDBG Asbestos Containing Material ( ACM ) Flooring Demo and Abatement Project 1047 Mushroom Corner, Nespelem, WA 99155
Solicitation # FY27-08
The Colville Indian Housing Authority is soliciting quotations for the demolition and abatement of asbestos-containing material (ACM) flooring and underlayment at a single-family home located at 1047 Mushroom Corner, Nespelem, WA. The scope of work involves the removal of approximately 1,019 square feet of flooring and cove base down to the subfloor, including the disposal of both asbestos and non-asbestos materials. Contractors must provide comprehensive documentation, including EPA notifications, an asbestos abatement work plan, worker certifications, air sampling reports, and waste shipment records. Clearance testing results must be submitted to the authority within two working days of completion. The project requires strict adherence to EPA AHERA, NESHAPS, and OSHA regulations, with all work supervised by a certified asbestos supervisor and a competent person. Award is based on the lowest responsive quotation, with a 10% preference given to qualified Indian-owned economic enterprises. Bidders must be registered in the System for Award Management (SAM) and comply with Davis-Bacon wage requirements, TERO regulations, and specific insurance minimums, including $1,000,000 for general liability. Quotations are due by December 09, 2026, and must include a non-collusion affidavit, TERO compliance plan, and other required HUD and waste disposal forms.
Colville Indian Housing Authority

POSTED

about 16 hours ago

DEADLINE

in 19 days
NAICS: 562910
New
SLED
FY2 7-09 Asbestos Containing Material ( ACM ) Flooring Demo and Abatement Project 3213 Moccasin Run, Inchelium, WA 99138
Solicitation # FY27-09
The Colville Indian Housing Authority is soliciting quotations for the demolition and abatement of asbestos-containing materials (ACM) at a single-family home located at Unit 3213 Moccasin Run in Inchelium, Washington. The scope of work involves the removal of approximately 1,153 square feet of flooring and underlayment down to the subfloor, including cove base removal, while ensuring the protection of existing bathroom flooring. The project must be completed within 21 consecutive calendar days by qualified, licensed asbestos abatement workers and a dedicated on-site supervisor. All work must adhere to EPA AHERA, NESHAPS, and OSHA regulations, with ACMs transported to approved facilities such as the Okanogan County Landfill or Graham Road Recycling and Disposal Facility. Key deliverables include the submission of clearance testing results within two working days of completion and waste manifests within five working days. Contractors are required to provide comprehensive documentation, including a U.S. EPA Notification of Demolition and Renovation, an abatement work plan, and worker certifications. The contract requires compliance with Davis-Bacon wage decisions, TERO regulations, and specific insurance minimums, including $1,000,000 in Commercial General Liability. Award selection is based on the lowest responsive quotation, with a 10% price preference given to qualified Indian-owned economic enterprises or organizations.
Colville Indian Housing Authority

POSTED

about 16 hours ago

DEADLINE

in 26 days
NAICS: 562910
New
Federal
F108--620-26-206 Asbestos Abatement
Solicitation # 36C24227R0010
Solicitation 36C24227R0010 is a firm-fixed-price contract for asbestos abatement services at the Montrose VA Medical Center in New York. The project involves the removal, clean-up, and disposal of asbestos-containing materials (ACM) across approximately 2,300 square feet of floor and mastic, including carpet and levelers, as well as 100 linear feet of radiator panel insulation and heat shields. The estimated construction magnitude for this project is between $100,000 and $250,000. This procurement is a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. The scope of work includes pre-abatement meetings and inspections, the actual removal and encapsulation of ACM, and post-abatement air monitoring and certification of decontamination. All work must comply with federal, state, and local regulations, including OSHA, EPA, DOT, and NESHAP standards, as well as 2010 ADA Standards for Accessible Design. Award will be based on a comparative evaluation of technical capability, past performance, and price. Contractors must possess New York State asbestos-abatement licenses and certifications and provide evidence of at least two similar projects completed within the last five years. The contract is subject to the Davis-Bacon Act for prevailing wage rates and requires a Buy American Certificate and a Limitations on Subcontracting Certificate of Compliance.
242-NETWORK Contract Office 02 (36C242)

POSTED

about 23 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This subcontract for the Public Works agency in Massachusetts focuses on the installation and maintenance of temporary erosion and sediment control measures during construction. The project is categorized under NAICS code 562910, with a response deadline set for January 29, 2026. There is no specified set-aside status for this opportunity. Interested parties can find further details and application instructions through the provided procurement portal link.

General Info

Place of Performance

MA, USA

Set-Aside

NONE

Documents

This scope was carved out of COC-CIFB-FY26-30724.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

The Port Infrastructure Phase II Project Package 1

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Hazardous and Universal Waste Disposal and RecyclingOpen now, due in 14 days
  • Hazardous Material and Asbestos AbatementOpen now, due in 19 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyMassachusetts → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install and maintain temporary erosion and sediment control measures during construction.

More opportunities from Massachusetts → Public Works

Same awarding agency

NAICS: 561730
SLED
SNOW PLOWING SERVICES
Solicitation # COC-CEX-FY27-31260
The City of Cambridge Department of Public Works is soliciting independent contractors for as-needed snow plowing services under solicitation number COC-CEX-FY27-31260. Contractors must provide qualified drivers and equipment, including trucks with a manufacturer rating of three tons or more, with the City reserving the right to reject equipment older than model year 2010. Specific equipment options and fixed hourly rates are established, ranging from 4WD pickups at 138.00 dollars per hour to large trucks with salt spreaders at 340.00 dollars per hour. Performance standards require plowing to bare pavement, widening streets to maximum width, and cleaning intersections to full width. All operators must check in and out with the Public Works Supervisor and vehicles must be equipped with cell phones. Compliance requirements are stringent, requiring large vehicles to have convex mirrors, cross-over mirrors, side under-ride guards, and specific safety yellow blind-spot decals. All vehicles must obtain a compliance certification sticker from the City of Cambridge or City of Boston Inspectional Services Department. Contractors must adhere to the City of Cambridge Living Wage of 20.32 dollars per hour as of March 1, 2026, and provide comprehensive insurance covering commercial liability, automotive, and worker's compensation. Required submission documents include a snow plowing information form, vehicle registrations, driver licenses, Cori compliance, anti-collusion/tax compliance forms, and a written information security policy. Invoicing is managed by the Department of Public Works, with draft invoices sent within ten days of a storm.
Landscaping Services

POSTED

about 1 month ago

DEADLINE

in 5 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS