Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Rhode Island was posted on April 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Temporary Pothole Patching

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The State of Rhode Island is seeking a subcontractor for temporary pothole patching to ensure road ride quality is maintained until permanent repairs can be implemented. The scope of work involves emergency and interim repairs utilizing either cold or hot mix asphalt, which includes necessary excavation, base preparation, patching, and compaction. This opportunity was posted on April 25, 2025, and requires responses to be submitted by May 23, 2025. Interested parties can find further details and bidding information through the Rhode Island Division of Procurement portal under NAICS code 238990.

General Info

Rhode Island seeks a subcontractor for temporary pothole patching; bids due May 23, 2025.

Place of Performance

RI, USA

Set-Aside

NONE

Documents

This scope was carved out of TCB25005304.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2025-2026 Crack Sealing C-1

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 15 days
  • PURIFIED WATER REPLENISHMENT SAN JACINTO VALLEY ADVANCED WATER PURIFICATION FACILITY SPECIFICATION NO. 1472WOpen now, due in 2 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyState of Rhode Island
ContactsNo contacts available
OfficeN/A
Organization / AgencyState of Rhode Island
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Emergency and interim repair of potholes using cold or hot mix asphalt, including excavation, base prep, patching, and compaction to maintain ride quality until permanent repair.

More opportunities from State of Rhode Island

Same awarding agency

NAICS: 236220
New
SLED
URI Washburn Hall Renovations Upper College Road Multi-Use Development Enabling
Solicitation # RFQ27007140
The University of Rhode Island is seeking a qualified general contractor for the Washburn Hall renovations and Upper College Road Multi-Use Development enabling work located at 75 Briar Lane in Kingston, Rhode Island. Under solicitation RFQ27007140, the project scope encompasses structural stabilization and reinforcement, selective demolition, and the renovation of office and conference rooms on the second and third floors. The work includes the installation of interior finishes, non-load-bearing steel framing, and gypsum board, along with necessary modifications to HVAC, electrical, telecommunications, fire protection, and fire alarm systems. All work must adhere to local and state building codes, with specific technical standards including NFPA 285 for fire safety and ACI 530.1/ASCE 6/TMS 602 for masonry tolerances. The contract is structured as an AIA A101-2017 Standard Form of Agreement, requiring both bid surety bonds and payment and performance bonds. Financial administration follows AIA Document G702 and G702A for progress payments, with the owner paying 95 percent of the amount due until substantial completion. Contractors must comply with Rhode Island Department of Labor and Training prevailing wage requirements, submitting certified payroll records monthly. Key personnel, including a project manager, superintendent, and safety engineer, must be assigned and identified during the pre-construction meeting. Deliverables include detailed shop drawings, coordination drawings, and product samples, with final acceptance contingent upon successful testing and inspection by the engineer and commissioning agent.
Commercial and Institutional Building Construction

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS