Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on October 25, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Tennessee Tombigbee Waterway Misc. Construction Equipment

Closed
W9127825L0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333120
New
DIBBS
RETRACTOR ASSEMBLY, WEA
Solicitation # SPE8EF-27-T-0173
Solicitation SPE8EF-27-T-0173 is a fixed-price request for quotations issued by the Defense Logistics Agency for the procurement of 119 units of Retractor Assembly, Weapon Cradle Adapter, identified by NSN 1740-01-140-7583. This is a critical application item that must adhere to specific source control drawings, requiring offerors not listed as approved sources to obtain OEM approval. The contract specifies a delivery period of 145 days, with a need ship date of April 4, 2027, and an original required delivery date of October 7, 2027. Delivery is FOB Origin, with inspection and acceptance occurring at the destination, specifically the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The procurement incorporates stringent technical and quality standards, including the DLA Master List of Technical and Quality Requirements, which takes precedence over ASTM D3951 packaging standards. All shipments must be marked and labeled according to MIL-STD-129 and palletized per RP001. Compliance requirements include CMMC Level 2 Self-Assessment, NIST SP 800-171 DoD assessment requirements, and adherence to the Buy American Act and Berry Amendment. Administrative processing, including invoicing and receiving reports, must be conducted through the Wide Area WorkFlow system. This solicitation is not a small business set-aside.
CONSTRUCTION & EQUIPMENT MANU & CON

POSTED

about 7 hours ago

DEADLINE

in 12 days

General Info

NAICS

333120 - Construction Machinery Manufacturing

Place of Performance

Columbus, MS, USA

Set-Aside

NONE

Documents

2

Sources Sought Notice for Tennessee Tombigbee Waterway Misc. Construction Equipment W9127825L0002

PDF, High priority: read this firstsources-sought
High

W9127825L0002 - Miscellaneous Construction Equipment Sources Sought

PDF, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Mobile
Contacts2 people available
OfficeMOBILE, AL, 36602-3630, USA
Office AddressMOBILE, AL, 36602-3630, USA

Full Description

Show more
Market Research and Sources Sought Notice for information on capability and availability of potential contractors interested in proposing on a Firm Fixed Price Contract to Provide Miscellanies Construction Equipment for the Tennessee Tombigbee Waterway in Columbus, MS. The minimum technical specifications of the Construction Equipment: Mini Excavator Minimum Requirements: Quantity: 3 Type: Water-cooled, 4 cycle, direct injection with operating thumb Cab Type: Closed Cab Climate Control Engine Output:35-45 HP Steering Control: Two levers with pedals Drive Method: Hydrostatic Undercarriage: Sealed Fuel Tank: 15 gallons Minimum Emission Rating: EPA Tier 4 Number of Cylinders: 4 Bucket Size: .07-.24 cubic yards Shipping: Two must be delivered to 3600 West Plymouth Road Columbus, MS 39701 and one shipped to 53 Lock and Dam Road Dennis MS 38838 within 90 days from award. Large Excavator Minimum Requirements: Quantity: 1 Type: Water-cooled, 4 cycle, direct injection with operating thumb Cab Type: Closed Cab Climate Control Engine Output: 150-165 HP Steering Control: Two levers with pedals Drive Method: Hydrostatic Undercarriage: Sealed Low Ground Pressure Fuel Tank: 100 gallons Minimum Emission Rating: EPA Tier 4 Number of Cylinders: 6 Minimum Bucket Size: .66-1.57 cubic yards Digging Depth: 20 Minimum Shipping: Must be delivered to 53 Lock and Dam Road Dennis MS 38838 within 90 days from award. Articulated Off Road Dump Truck Minimum Requirements: Quantity: 1 Type: Water-cooled, 4 cycle, direct injection Cab Type: Closed Cab Climate Control Engine Output: 300-355 HP Steering Control: Articulated type, fully hydraulic power steering with double-acting cylinders Supplementary Steering: Automatically actuated, electrically powered Transmission: Full-automatic, countershaft Shift Control: Electronic with automatic clutch modulation in all gear Suspension: Hydro-pneumatic and rubber Articulation Angle: 45 degrees in each direction Dump Capacity: 20 cubic yards heaped Minimum Fuel Tank: 100 gallons Minimum Def Tank: 5 gallons Minimum Emission Rating: EPA Tier 4 Number of Cylinders: 6 Minimum Shipping: Must be delivered to 53 Lock and Dam Road Dennis MS 38838 within 90 days from award.

More opportunities from Department Of Defense → W074 Endist Mobile

Same awarding agency

NAICS: 236220
New
Federal
Market Intelligence - Progressive Design-Build - SRM Campaign for the 96th Medical Group
Solicitation # W9127827QA003
Solicitation W9127827QA003 is a Request for Information issued by the U.S. Army Corps of Engineers Mobile District to gather market intelligence for a Progressive Design-Build project. The effort involves a Sustainment, Restoration, and Modernization campaign for the 96th Medical Group at Eglin Air Force Base, Florida. The scope includes multi-disciplinary infrastructure upgrades and facility renovations, specifically focusing on cooling and HVAC systems, electrical resiliency, and fire protection across several buildings. The project will be executed in two phases, starting with design and pre-construction services followed by final design and construction. The government intends to utilize a Firm-Fixed-Price agreement and a streamlined selection process involving a Statement of Qualifications, a down-selection to three companies, and in-person pitch meetings. A critical requirement is the meticulous phasing of construction to ensure zero disruption to patient care and medical operations. Contractors must adhere to Unified Facilities Criteria, NFPA medical codes, and standards from The Joint Commission and AAALAC. Additionally, on-site supervisors must hold an American Society of Healthcare Engineering construction certificate, and the performing entity must be prepared to secure increased liability insurance due to operational risks. Responses to this RFI are due by November 12, 2026.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
Federal
Market Intelligence - Progressive Design-Build - Blood Donation Center
Solicitation # W9127827RA014
The U.S. Army Corps of Engineers Mobile District has issued a Special Notice for market intelligence regarding a Progressive Design-Build project at Yokota Air Base, Japan. This Request for Information seeks to gauge industry interest and technical capability for the design and construction of several specialized medical departments within an active, occupied hospital. The scope of work includes the delivery of a new Blood Donation Center, a modernized Sterile Processing Department, a high-capacity hospital kitchen, and pharmaceutical compounding rooms compliant with USP 797/800 standards. To ensure zero disruption to healthcare delivery, the contractor must phase construction carefully and adhere to NFPA medical codes as well as standards set by The Joint Commission and applicable Authorities Having Jurisdiction. Prospective entities must demonstrate the technical capability to perform specialized medical construction and provide proof of financial capacity, specifically the ability to provide an Irrevocable Letter of Credit or check in lieu of standard bonding. Because the work is located in Japan, U.S. companies must possess a valid Japanese Construction Business License and a legally registered office in the country, or establish a formal joint venture with a licensed Japanese contractor. Additionally, personnel will be subject to strict security and health screenings, including targeted immunizations and specialized medical testing. While this notice is not a formal solicitation, the government intends to use a streamlined competitive selection process to identify the most qualified entity, with a formal Request for Qualifications potentially issuing around January 1, 2027.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 561210
Federal
Operation and Maintenance of Government-Owned Facilities and Equipment, Jim Woodruff Lock and Dam and Lake Seminole Project, Florida and Georgia
Solicitation # W9127826RA063
This contract is a Small Business Set-Aside IDIQ SATOC for the operation, maintenance, and repair of government-owned facilities and equipment at the Jim Woodruff Lock and Dam and Lake Seminole Project, spanning Florida and Georgia. The period of performance runs from January 1, 2027, to December 31, 2031, with a minimum guaranteed obligation of 100,000 dollars. The scope of work is divided into 15 Technical Provisions covering a wide array of services, including general management, janitorial and custodial services, grass mowing, dumpster services, vegetation and pest control, boundary line marking, and specialized support for the lock, dam, spillway, and powerhouse. The contractor is responsible for maintaining these assets in safe and efficient operating condition, adhering to EM 385-1-1 safety standards and USACE sign standards. Award is based on a best-value tradeoff, where non-price factors—specifically past performance and technical approach—are significantly more important than price. The contract includes a firm-fixed-price seed task order for the first year of performance. Key requirements include the provision of a competent on-site superintendent, compliance with DoD 8570.01-M for any IT/IA personnel, and strict adherence to electronic invoicing and submission protocols via PIEE. Government-furnished property, including vehicles, equipment, and specific buildings, is provided to support the execution of these maintenance and operational tasks.
Facilities Support Services

POSTED

7 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS