Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Tentative Parcel Map No. PPM 26-034

Forecast
PPM 26-034State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Full Description

Show more
This project is a Tentative Parcel Map No. PPM 26-034 requested by Kelley T. Hampton and Rhonda M. Hampton, 2431 Howard Road, Earlimart, CA 93219 (agent: Provost & Pritchard, 120 N. Floral Street, Visalia, CA 93291) to allow the division of 118.92 gross acres into two parcels: Proposed Parcel 1= 1.35 gross acres and Proposed Parcel 2= 117.57 gross acres in the AE-40 (Exclusive Agricultural - 40 acre minimum) Zone.

More opportunities from California → Tulare County

Same awarding agency

NAICS: 221114
New
SLED
RPCA Solar 17, LLC Project (PSP 25-092)
Solicitation # PSP 25-092
RPCA Solar 17, LLC is developing a small-scale utility solar generation facility in unincorporated Tulare County, California, near Porterville. The project will be situated on approximately 13.6 acres across three parcels totaling 17.6 acres within the Exclusive Agricultural zoning district. The project sponsor has secured a long-term lease agreement with the property owner, the Antoine Bechara Revocable Trust, to facilitate the construction and operation of the facility. Once complete, the project will generate up to 3 megawatts of alternating current clean energy using single-axis tracking solar modules. The generated power is intended to be sold to the Clean Power Alliance through a long-term Power Purchase Agreement, with interconnection provided via Southern California Edison's existing electrical distribution system. The facility will feature a seven-foot chain-link fence with wildlife-permeable design elements and will be accessed by a 20-foot wide all-weather gravel road. Electrical connections will transition from existing overhead lines to underground utility runs leading to a central power station and transformer. The site will be operated remotely with professional operations and maintenance contractors managing the facility and native groundcover restoration. Environmental compliance is being managed through an Initial Study and Mitigated Negative Declaration, with all mitigation measures incorporated into a formal Monitoring and Reporting Program to ensure the protection of the surrounding agricultural and rural residential landscape.
Solar Electric Power Generation

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Tulare County Stream Channel Routine Maintenance Agreement ProjectTulare County plans to establish a 12-year agreement with the California Department of Fish and Wildlife to conduct routine maintenance on jurisdictional stream channels, drainage facilities, and associated areas throughout the county. The agreement authorizes approximately 30 maintenance projects annually, covering a range of activities such as repairing or replacing drainage structures, clearing debris and sediment under dry conditions, managing vegetation through grazing or direct removal, performing minor erosion control work, repairing prior erosion measures, and conducting geotechnical sampling or cultural resource sensitivity tests. All specific methods, locations, and scope of work will require prior submission and approval via the CDFW’s Verification Request Form process to ensure compliance with environmental regulations. The project is designed to support long-term water flow integrity, reduce flood risks, and maintain public infrastructure while adhering to state wildlife and habitat protections. The agreement will be administered by Tulare County’s Environmental Planning and Economic Development teams, with key personnel including the Chief Planner, Senior Environmental Planner/Biologist, and Associate RMA Director serving as primary contacts. The project is forecasted to be initiated in 2026 and will span the entirety of Tulare County’s jurisdictional waterways, ensuring consistent and regulated upkeep without requiring individual permits for each routine action. The long-term nature of the agreement streamlines compliance, reduces administrative burdens, and fosters consistent collaboration between the county and state wildlife agencies to balance infrastructure needs with ecological stewardship.
Other Heavy and Civil Engineering Construction

POSTED

15 days ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS